Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058E102 + (ML20058E102)
- ML20058E104 + (ML20058E104)
- 05000361/LER-1982-030-03, /03L-0:on 820612,electrohydraulic Valve 2HV4714 Failed to Open,Rendering Motor Driven Auxiliary Pump 2P-504 Inoperable.Cause Not Determined.Valve Disassembled & Rebuilt + (ML20058E108)
- 05000498/LER-1990-023, :on 900929,manual RT Due to Full Closure of FW Isolation Valve During Partial Stroke Test + (ML20058E109)
- ML20058E111 + (ML20058E111)
- IR 05000266/1982015 + (ML20058E112)
- ML20058E114 + (ML20058E114)
- ML20058E117 + (ML20058E117)
- 05000361/LER-1982-031-03, /03L-0:on 820616,discovered Oil Leakage from Bearings of Auxiliary Feedwater Drive Pump 2P-504.Caused by Bearing Failure.Leakage Repaired + (ML20058E118)
- ML20058E119 + (ML20058E119)
- 05000321/LER-1990-020, :on 901006,main Turbine High Vibrations Result in Automatic Scram + (ML20058E120)
- ML20058E121 + (ML20058E121)
- ML20058E122 + (ML20058E122)
- ML20058E127 + (ML20058E127)
- 05000361/LER-1982-032-03, /03L-0:on 820617,vent Valve S21305MR807 Broke Off, Creating 1-inch Diameter Leakage.Caused by Fatigue Failure Due to Hydraulic Instability.Valve & Portion of Piping Replaced + (ML20058E128)
- 05000285/LER-1990-024, :on 901026,discovered Failure to Conduct Hourly Firewatch + (ML20058E129)
- ML20058E130 + (ML20058E130)
- ML20058E131 + (ML20058E131)
- ML20058E132 + (ML20058E132)
- 05000483/LER-1990-011, :on 901003,ESF Actuations Occurred Due to Spurious Signal on Fuel Bldg Radiation Monitor + (ML20058E133)
- ML20058E134 + (ML20058E134)
- LD-90-083, Forwards Amend H to CESSAR - Design Certification + (ML20058E135)
- ML20058E137 + (ML20058E137)
- ML20058E139 + (ML20058E139)
- ML20058E140 + (ML20058E140)
- IR 05000247/1993026 + (ML20058E141)
- ML20058E143 + (ML20058E143)
- ML20058E147 + (ML20058E147)
- ML20058E148 + (ML20058E148)
- ML20058E149 + (ML20058E149)
- ML20058E151 + (ML20058E151)
- ML20058E153 + (ML20058E153)
- ML20058E155 + (ML20058E155)
- ML20058E156 + (ML20058E156)
- ML20058E157 + (ML20058E157)
- ML20058E158 + (ML20058E158)
- ML20058E159 + (ML20058E159)
- ML20058E160 + (ML20058E160)
- ML20058E161 + (ML20058E161)
- ML20058E162 + (ML20058E162)
- ML20058E165 + (ML20058E165)
- IR 05000301/1993016 + (ML20058E166)
- ML20058E168 + (ML20058E168)
- ML20058E170 + (ML20058E170)
- ML20058E171 + (ML20058E171)
- ML20058E172 + (ML20058E172)
- ML20058E173 + (ML20058E173)
- ML20058E174 + (ML20058E174)
- ML20058E176 + (ML20058E176)
- PY-CEI-NRR-1250, Forwards Rev 10 to Emergency Plan for Perry Nuclear Power Plant + (ML20058E178)
- AECM-82-306, Requests That Resolution of Items 13.3.2.1 & 13.3.2.2 of Suppl 2 to SER Per License Condition 2.C.39 Re Emergency Preparedness Be Reflected in Next Suppl to SER + (ML20058E183)