ML20058E172
| ML20058E172 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/23/1993 |
| From: | Ring M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20058E175 | List: |
| References | |
| NUDOCS 9312060198 | |
| Download: ML20058E172 (2) | |
See also: IR 05000341/1993020
Text
. . _ .
_ _._
_ _
~
a
,
,-
.
.
November 23, 1993
Docket No. 50-341
)
The Detroit Edison Company
ATTN:
D. R. Gipson
i
Senior Vice President
'
Nuclear Generation
6400 North Dixie Highway.
'
Newport, MI 48166
Dear Mr. Gipson:
SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-341/93020(DRS))
This refers to the routine safety inspection conducted by Mr. K. Salehi
i
between September 16 - 24, 1993 at your fermi 2 Power Plant facility and
October 18 through November 4, 1993, at the Region III office.
This
inspection included a review of activities at your Fermi plant authorized by
NRC Operating License No. NPF-43. At the conclusion of the inspection, the
!
findings were discussed with those members of your staff identified in the
enclosed report.
'
i
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities.
The purpose of the inspection was to dett:rmine whether activities
authorized by the license were conducted safely and in accordance with NRC
'
requirements.
based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
j
Violation (Notice).
The violations were issued for not complying with
procedural requirements and for inadequate corrective actions in response to
generated deviation reports (DER). The violations were of concern because
they highlighted an inadequate response to conditions adverse to quality and
several n;issed opportunities to take appropriate corrective actions.
Although 10 CFR 2.201 requires you to submit to this office, within 20 days of
your receipt of this Notice, a written statement of explanation, we note that
this violation had been corrected and those actions were reviewed during this
inspection. Therefore, no response with respect to this matter is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room.
(lP()n
L,
93120fiO198 931 23
~1%
ADOCK 06000:1 t,1
%
Ii1
O
PDH
3
,
C bllC ~ l b b I
j
'
.
,_ _
_
_ _ _ . _ ~
-
_
_ _ _
_
_ . _ _ _ _.
- . _ ,
!
,-
l
a
.-
l
'
' The ' Detroit Edis - c.ompany
2
'
teovember 23, 1993
!
We will gladly discuss any questions you have concerning this inspection.
i
,
i
Sincerely,
original signed by B. Burgess
for
j
Mark A. Ring, Chief
Operations Branch
l
Enclosures:
1.
2.
Inspection Report
i
No. 50-341/93020(DRS)
cc w/ enclosures:
l
John A. Tibai, Supervisor
'
of Compliance
P. A. Marquardt, Corporate
Legal Department
l
OC/LFDCB
{
Resident Inspector, RIII
i
James R. Padgett, Michigan Public
Service Commission
'
liarry H Voight, Esq.
i
Michi,an Department of
.
Public Health
Monroe County Office of
J
Civil Preparedness
T. G. Lolburn, LPM, NRR
a
j
bec w/ enclosures:
PUBLIC - IE01
.
d
RIII
RIIg
RI@
RIlh
,
- '1
($
S
cg
B. Burgess
illips
F!rng '
'
ll/g)3
ll/p/93
11/2 3/93
11/; 93
i
-
-- -
.
-
-- -