FJUL I 2 082
-J"L 0 9 cc;
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the special follow-up inspection conducted by Mr. J. P. Patterson
of this office on June 16 and 17,1982, of the prompt public notification /
warning system of the Point Beach Nuclear Power Plant, Units 1 and 2, and to
the discussion of our findings with Mr. G. A. Reed, Manager, Nuclear Operations
and others of your staf f at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information that
you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are availabic for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8207270487 820712
PDR ADOCK 05000266
.[ [
O
,
r
9
o
- , ,
'"
.
. .s
.
Wisconsin Electric Power Company
2
'JUL 0 9 082
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations-listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
V
g
C.h.Paperiello, Chief
,
Program Support Branch
Enclosure:
Inspection
Report No. 50-266/82-15(DEPOS);
No. 50-301/82-15(DEPOS)
cc w/ enc 1:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Peter Andersen, Wisconsin's
Environmental Decade