Insp Rept 50-247/93-26 on 931108-12.No Violations Noted. Major Areas Inspected:Mgt Support Plans,Protected & Vital Area Physical Barriers,Detection & Assessment Aids,Protected & Vital Area Access Control of Personnel
ML20058E141
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/23/1993
From: King E, Mccabe E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20058E136 List:
References
50-247-93-26, NUDOCS 9312060186
Download: ML20058E141 (7)


Text

_ _ _ _ _

.

-

.

.

I U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No.

50-247/93-26 Docket No.

50-247 License No.

DPR-26 Licensee:

Consolidated Edison Company of New York. Inc.

4 Irvine Place Buchanan. New York 10003 Facility Name:

Indian Point Nuclear Generatine Station Unit 2 O

Inspection at:

Buchanan. New York Inspection Conducted:

November 8-12. 1993 lddsd d. by i/- 2 -93 Inspector:

E. B. King, Physigurity Inspector date SI-

l).3 /93 Approved by:

E. C. McCabe, Chief, Safeguards Section date O

oivision or nadi tion Sarety and Safeguards SCOPE l

Licensee Actions on Previously Identified Open Items; Management Support and Plans; Protected and Vital Area Physical Barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm Stations and Communications; Power Supply; Testing and Maintenance; and Security Training and j

l Qualifications.

RESULTS

'

The licensee's physical security program was determined to be effective and directed towards assuring public health and safety. Management support for the program was evident through the implementation of several program enhancements to increase its effectiveness. Two security program issues were closed.

i 9312060186 931123 PDR ADOCK 05000247

'

Q PDR j

-

.

.

.

.

.

.

DETAILS 1.0 Key Persons Contacted 1.1 Licensee and Contractor Personnel

  • S. Bram, Vice President, Nuclear Power

,

  • T. Schmeiser, General Manager, NPG
  • J. M. Drexel, Site Protection Manager
  • G. Cullen, Security Superintendent
  • T. S. Elsroth, Security Administrator
  • M. A. Whitney, Senior Engineer, Fuclear Safety and Licensing
  • G. Lisewski, Instrumentation and Control (I&C) Supervisor
  • R. Meyer, Site Captain (TWC)
  • F. Wiedeman, Administrative Coordinator (TWC)

l

  • T. Constantino, Training Coordinator (TWC)

1.2 U. S. Nuclear Regulatory Commission T. Frye, Resident Inspector

  • Present at the exit interview The inspector also interviewed other licensee and contractor security personnel.

2.0 Follow-un of Previously Identified Items 2.1 (Closed) URI 50-247/93-08-01: Inadequate performance of the intrusion detection system.

O During the previous inspection (50-247/93-08) the inspectors determined that the licensee's intrusion detection system performed inadequately due to inclement weather and that the exterior patrol officers failed to detect I

associated potential vulnerabilities. Based on a review of the licensee's corrective actions, which included the revision of post orders and the incorporation of lessons learned in the training lesson plans and critical tasks relevant to patrol responsibilities, the inspector determined by a review of training lesson plans and critical tasks and discussions with security management that the corrective actions were adequate. No discrepancies were note ;

.

.

.

2.2 (Closed) VIO 50-247/93-08-02: Failure to properly search packages and personnel prior to granting protected area (PA) access.

During the previous inspection (50-247/93-08) the inspectors determined that security force members (SFMs) failed to properly search personnel and packages at the main access control point prior to granting access to the PA in accordance with the Physical Security Plan (the Plan). Based on a review of the licensee's corrective actions, which included the revision of applicable

l lesson plans and post orders, observation of access control during peak and off l

peak periods, and discussions with security force members and licensee management, the inspector found the corrective actions effective. No discrepancies were noted.

3.0 Manacement Support and Plans O

3.1 Manacement Supoort

.

Management support for the licensee's physical security program was l

determined to be consistent with program needs. This determination was based upon the inspectors' review of various aspects of the licensee's program during this inspection as documented in this report.

Security program enhancements made since the last routine physical security inspection (50-247/93-08) were:

-

acquisition of a trailer complex, located at the north end of the owner controlled area, and designated = the new security training center;

-

repositioning of several CCTV's to enhance PA assessment; and

-

the near completion of the common barrier project between Units #2 and #3.

3.2 Plans The inspector discussed proposed changes to the Plan with the licensee. The licensee intends to submit the Plan changes to the NRC in the near future under the provisions of 10 CFR 50.54(p).

.

-

-.

-.

- -

- - -

-

.

.

4.0 Protected and Vital Area Physical Barrier. Detection and Assessment Aids

4.1 Protected Area Barrier The inspectors conducted a physical inspection of the PA barrier on November 8,1993. The inspectors determined by observation that the barrier was installed and maintained as described in the Plan.

4.2 Protected Area Detection Aids l

l The inspectors observed the perimeter intrusion detection system (IDS) on November 8,1993, and determined that it was installed, maintained and

'

operated as committed to in the Plan. On November 9,1993, from 12:30 -

l 2:30 p.m., the inspector observed licensee testing of 15 zone sections of the i

O intrusion detection system at 21 locations. Ali zones tested satisfactorily.

,

4.3 Assessment Aids

The inspectors observed the PA perimeter assessment aids during daylight and determined that they were installed, maintained and operated as committed to

'

in the Plan.

i Because of previously identified assessment problems, the licensee initiated a long term assessment upgrade. The assessment upgrade is progressing on schedule. All assessment upgrades are scheduled for completion in 1995.

This item will be reviewed during subsequent inspections.

I 4.4 Protected Area and Isolation Zone Liehtine The inspector conducted a PA and isolation zone lighting survey on November 9,1993, from approximately 5:30 - 6:15 p.m., accompanied by a licensee security supervisor. The inspector determined, by observation and use of a calibrated light meter provided by the licensee, that the station's lighting system met regulatory requirements and was very effective, and that the isolation zones were adequately maintained to permit observation of activities of activities on both sides of the PA barrier.

4.5 Vital Area (VA) Barriers The inspector conducted a physical inspection of selected VA barriers on November 11,19o;. The inspector determined by observation that the VA barriers were astalled and maintained as described in the Plan.

In summary, the licensee's PA and VA physical barriers, detection and assessment aids satisfied NRC requirement _

_

._.

.

-

__ _

_

__ _

.

-

.

j

-

I

.

t

j i

5.0 Protected and Vital Areas Access Control of Personnel. Packanes and Vehicles 5.1 Personnel Access Contal j

The inspector determined that the licensee was exercising positive control over i

personnel access to the PA and VA's. This determination was based on the following.

5.1.1 The inspector determined, based on observations, that personnel were i

properly identified and authorization was checked prior to issuance of i

.

badges and key cards.

'

5.1.2 The inspector determined, by observation, that individuals in the PA l

'

and VAs displayed their badges as required.

j 5.1.3 The inspector verified, by reviewing the applicable procedures, that the licensee had escort procedures for visitors into the PA and VAs.

'

5.1.4 The inspector determined, based on observations and a review of the j

applicable post orders and procedures, that the licensee was

'

implementing a search program for firearms, explosives, incendiary _

devices and other unauthorized materials as described in the Plan.

,

!

5.2 Packare and Material Access Control

!

!

The inspector determined that the licensee was exercising positive control over j

packages and materials brought into the PA through tiie main access portal.

Inspector review of package and material control procedures found that they

!

'

O were c nsistent with commitments in the Plan. The inspector also observed l

package and material processing and interviewed members of the security

force and the licensee's security staff about package and material control

-

procedures.

5.3 Vehicle Access Control 1'

The inspector determined that the licensee properly controlled vehicle access into and within the PA. Vehicles were properly authorized prior to being allowed to enter the PA. Identification was verified by a SFM at the main

,

i access portal. This procedure was consistent with the commitments in the Plan. The inspector also reviewed the vehicle search procedures and determined that they were consistent with commitments in the Plan. The j

inspector determined that at least two SFMs control vehicle access at the main

'

vehicle access portal. On November 8,9, and 11,1993, for a combined period of about 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the inspector also observed vehicle searches and -

,

-

.

-

interviewed SFMs and the licensee's security staff about vehicle search procedures. The inspector determined that they were knowledgeable of the requirements.

j i

In summary, the licensee had effective programs which satisfied NRC requirements for PA and VA access control of personnel, packages, and vehicles.

6.0 Alarm Stations and Comm.mications The inspector observed the operations in the Central Alarm Station (CAS) and Secondary Alarm Station (SAS) and determined these were as committed to in the Plan. CAS and SAS operators were interviewed by the inspector and found to be knowledgeable of their duties and responsibilities. The inspector verified that the CAS and SAS did not require any operational activities that would interfere with the O

assessment and response functicns. No deficiencies were noted.

7.0 Emereency Power Sucolies The inspector verified that there are several systems (batteries, dedicated diesel generator within a VA, and plant on-site AC power) that provide backup power to the security systems. The inspector reviewed the testing and maintenance records and procedures for these systems and found that they were consistent with the Plan.

No deficiencies were noted.

8.0 Testine and Maintenance The inspector determined that the licensee was testing and maintaining security systems and equipment as committed to in the Plan. This determination was based Q'

upon a review of the test records for security equipment. The station provides instrumentation and controls (I&C) technicians who are specifically assigned to maintain security equipment. A records review indicated that repairs are timely and that each work request is prioritized. The inspector also reviewed the use of compensatory measures and security force overtime and found them to be minimal, largely due to the efforts and prompt response of the maintenance group. No deficiencies were noted.

9.0 Security Training and Oualification The inspector rand mly selected and reviewed training, physical and firearms qualification records for eight SFMs. The inspectors determined that the training had been conducted in accordance with the security training and qualification (T&Q) plan and that it was properly documented.

.

l I

.

.

-

.

On November 11, 1993, the inspector observed weapons requalification training from 11:00 a.m. - 3:00 p.m. The training consisted of daytime qualification for the handgun and shotgun. In addition, stress and familiarization firing were also observed. Based on observations at the range and discussions with the training staff, the inspector determined that the requalification requirements, as approved by the NRC, were being satisfied and that the range was being controlled in a safe manner.

Several SFM's were interviewed to determine if they possessed the requisite knowledge to carry out their assigned duties. The interview results indicated that they were knowledgeable of their job requirements. No deficiencies were noted.

10.0 Exit Interview The inspecter met with the licensee's representatives indicated in Paragraph 1.0 at the

'

O coaciusioa or the iaspecti " " November 12, 1993. At that time, the purpose and scope of the inspection were discussed with licensee management, and the findings were presented. The licensee acknowledged the inspection findings.

.

- -

.