Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1982-067-03, /03L-0:on 820521,diesel Generator 1B-B Declared Inoperable When 120-volt Control Power Fuses Blew During Replacement of Bulb in Control Board.Caused by Shattered Bulb Glass Shorting Filaments.Fuses & Bulbs Replaced + (ML20054H667)
- ML20054H668 + (ML20054H668)
- 05000296/LER-1982-024, Forwards LER 82-024/03L-0 + (ML20054H670)
- IR 05000373/1981030 + (ML20054H672)
- 05000296/LER-1982-024-03, /03L-0:on 820523,during Startup testing,5% Average Insertion Time for All Control Rods Exceeded & 11 2x2 Arrays Failed to Meet 5% Insertion Time for Fastest 3 Rods.Cause Undetermined + (ML20054H673)
- AECM-82-279, Fifth Interim Deficiency Rept Re Valves & Actuators Not Manufactured Under QA Program,Initially Reported 811029.Util to Upgrade Seals,Lubricants & Coatings on Pins & Rollers. Final Rept Expected by 820924 + (ML20054H674)
- ML20054H675 + (ML20054H675)
- 05000338/LER-1982-033, Forwards LER 82-033/03L-0 + (ML20054H676)
- ML20054H678 + (ML20054H678)
- 05000338/LER-1982-033-03, /03L-0:on 820525,w/unit in Mode 5,fire Door M80-1 Between Rod Control Room & Outside Found Blocked Open W/O Fire Watch.Door Blocked by Air & Electrical Lines.Blocks Removed & Door Closed + (ML20054H679)
- 05000213/LER-1982-004, Forwards LER 82-004/01T-0 + (ML20054H680)
- ML20054H682 + (ML20054H682)
- 05000213/LER-1982-004-01, /01T-0:on 820606,during Shutdown,Main Steam Trip Isolation Valve 1 Disassembled to Determine Why Valve Would Not Cycle When Cooled Down.Caused by Misaligned Valve Disc Due to Warped Tail Link + (ML20054H683)
- 05000409/LER-1982-015, Forwards LER 82-015/01T-0.Detailed Event Analysis Submitted + (ML20054H684)
- ML20054H686 + (ML20054H686)
- 05000409/LER-1982-015-01, /01T-0:on 820616,both HPCS Pumps Placed in Pullout & LPCS Valve Control Switch Turned to Close to Prevent Challenging of Eccs.Caused by Shift Supervisor Not Cognizant of Work Scope Involved W/Change + (ML20054H687)
- ML20054H688 + (ML20054H688)
- 05000316/LER-1982-046, Forwards LER 82-046/03L-0 + (ML20054H690)
- 05000316/LER-1982-046-03, /03L-0:on 820520,west Centrifugal Charging Pump Removed from Svc to Repair Leaking 1/2-inch Threaded Seal Water Line Elbow at Inboard Mechanical Seal Hx.Cause of Leak Undetermined.Fitting Removed & Threads Cleaned + (ML20054H694)
- 05000338/LER-1982-040-03, /03L-0:on 820525,pressure in Nitrogen Reservoir for Pressurizer Power Operated Relief Valve (PORV) PCV-1455C Dropped Below Required Min Pressure.Caused by Leakage in PORV Nitrogen Supply Sys.Sys Will Be Modified + (ML20054H696)
- ML20054H697 + (ML20054H697)
- 05000296/LER-1981-062, Forwards Updated LER 81-062/03X-1 + (ML20054H698)
- ML20054H700 + (ML20054H700)
- ML20054H701 + (ML20054H701)
- 05000316/LER-1982-047, Forwards LER 82-047/03L-0 + (ML20054H702)
- ML20054H705 + (ML20054H705)
- ML20054H707 + (ML20054H707)
- 05000316/LER-1982-047-03, /03L-0:on 820603,insp Revealed That Installation of Valve Control 2-ABV-A Did Not Conform to Design Drawing. Caused by Inadequate Installation During Const.Emergency Mod Initiated + (ML20054H708)
- ML20054H709 + (ML20054H709)
- ML20054H710 + (ML20054H710)
- AECM-82-281, Interim Deficiency Rept Re Potential for Plant Flooding Based on PMP Flood Level,Initially Reported 820510.Complete Analysis Will Be Performed by 820630.Design Selection to Be Completed by 820630.Final Rept Provided by 820910 + (ML20054H711)
- ML20054H712 + (ML20054H712)
- 05000339/LER-1982-028, Forwards LER 82-028/03L-0 + (ML20054H713)
- ML20054H715 + (ML20054H715)
- ML20054H716 + (ML20054H716)
- ML20054H717 + (ML20054H717)
- ML20054H718 + (ML20054H718)
- 05000339/LER-1982-028-03, /03L-0:on 820529,power Supply Breaker Inside Recirculation Spray Pump Failed to Operate During Emergency Bus Loss of Power Test.Caused by Misalignment of Motor Protection Circuit Switch.Switch Readjusted + (ML20054H719)
- ML20054H720 + (ML20054H720)
- ML20054H721 + (ML20054H721)
- ML20054H722 + (ML20054H722)
- ML20054H723 + (ML20054H723)
- 05000296/LER-1982-020, Forwards LER 82-020/03L-0 + (ML20054H724)
- ML20054H726 + (ML20054H726)
- ML20054H727 + (ML20054H727)
- ML20054H729 + (ML20054H729)
- ML20054H730 + (ML20054H730)
- ML20054H731 + (ML20054H731)
- 05000296/LER-1982-020-03, /03L-0:on 820523,control Rod Drive (CRD) 46-15 Failed to Scram & CRD 54-47 Had 90% Scram Insertion Time of 8.02-s,failing to Meet Tech Spec 3.3.C Criteria.Caused by Incorrectly Rebuilt Pilot Valves.Valves Reassembled + (ML20054H732)
- IR 05000245/1982001 + (ML20054H733)
- ML20054H734 + (ML20054H734)