Forwards IE Emergency Preparedness Appraisal Repts 50-245/82-01 & 50-336/82-01 on 820104-14,significant Emergency Preparedness Findings & Emergency Preparedness Improvement Items
ML20054H727
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/11/1982
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20054H728 List:
References
NUDOCS 8206240370
Download: ML20054H727 (9)


See also: IR 05000245/1982001

Text

,

f

(-

'

'

.

JUN 11082

Docket Nos. 50-245

50-336

Millstone Nuclear Power Station, Unit Nos. 1 and 2;

ATTN: Mr. W. G. Counsil

Vice President-Nuclear Engineering and Operations

P. O. Box 270

' Hartford, Connecticut

06101

'

.

Gentlemen:

SUBJECT:

EMERGENCY PREPAREDNESS APPRAISAL (50-245/82-01; 50-336/82-01)

To verify that licensee's have attained an adequate state of onsite emergency

preparedness, the Office of Inspection and Enforcement is' conducting a special

appraisal at each power reactor site.

The objectives of the appraisal at each-

facility is to evaluate the overall adequacy and effectiveness of emergency

'

preparedness and to identify areas of weakness that need to be strengthened.

We-will use the findings from these appraisals as a basis not only for requesting

individual licensee action to correct deficiencies and effect improvements,

but also for effecting improvements in NRC requirements and guidance..

.

During the period of January 4-14, 1982, the NRC conducted an appraisal of the

emergency preparedness program at the Millstone Nuclear Power Station. Areas

examined during this appraisal are described in the enclosed report (50-245/82-01;

50-336/82-01). Within these areas, the appraisal team reviewed selected

i

procedures and representative records, inspected emergency facilities and

equipment, observed work practices and interviewed personnel.

The findings of this emergency preparedness appraisal indicate that certain

corrective actions are required-in your emergency preparedness program.' These

are discussed in Appendix A, "Significant Emergency Preparedness Findings."

Significant findings for which you have made acceptable commitments to resolve

i

were discussed in the Confirmatory Action Letter dated February 4, 1982, a

copy of which is enclosed for your convenience. These findings are included

in Appendix A.

Other areas needing improvement are discussed in Appendix B, " Emergency

Preparedness Improvement Items."

i

In conjunction with the aforementioned appraisal, emergency plans for your

facility are being reviewed by the Emergen.cy Preparedness Licensing Branch,

D.ivision of Emergency Preparedness, Office of Inspection and Enforcement. The

results of this review will be discussed in Appendix C, " Emergency Preparedness

Evaluation Report" which will be sent by separate, letter upon completion.

Appendix A and B of this letter contain an inclusive listing of all

J

outstanding emergency preparedness items at your facility at.this time.

%,b

OFFICIAL RECORD COPY

No!$o

'

3[

/f

,

, . .

-9

-

-

--

(

,

,

Millstone Nuclear Power Station,

JUN 111SB2

Unit Nos. I and 2

2

We recognize that an explicit regulatory requirement pertaining to each item

identified in Appendices A and B may not currently exist. Notwithstanding

this, you are requested to submit a written statement within thirty (30) days

of the date of this letter, describing your planned actions for improving each

of the items identified in Appendix A and the results of your consideration of

each of the items in Appendix B.

This description is to include, (1) actions

'which have been taken, (2) actions which will be taken, and (3) a schedule for

completion of actions for each item.

'

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

~will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

<

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of,2.790(b)(1).

The telephone notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

The reporting requirements contained in,this letter affect fewer than ten (10)

persons and therefore are not subject to Office of Management Budget Clearance

as required by P. L.96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Original Signou #1

G. H.st4r7M

1

George H. Smith, Director

Division of Emergency Preparedness and

,

Operational Support

Enclosures:

1.

Appendix A, Significant Emergency Preparedness F bdings

2.

Appendix B, Emergency Preparedness Improvement Items

3.

Letter to Northeast Nuclear Energy Company dated

February 4, 1982

4.

NRC Region I Inspection Report Number 50-245/82-01;

50-336/82-01

cc w/encls:

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Landenat, Manager, General Facilities Licensing

J. F. Opeka, Vice President, Nuclear Operations

Central Files

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

J. T. Shediosky, NRC Resident Inspector

OFFICIAL RECORD COPY

r

.

Millstone Nuclear Power Station,

JUN 111932

Unit Nos. I and 2

3

bcc w/encls:

~

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

,

R1:DE

U

R1:DEPOS

-

1:DPRP

R

OS

Crocker/wb

WS 014. Stahc

stocki

Smith

6/10/82

ll

%

'

g/cg.

OFFICIAL RECORD C

-

.

.

Appendix A

Significant Emergency Preparedness Findings

Based on the results of NRC's appraisal of the Millstone Nuclear Power Station

Emergency Preparedness Program conducted January 4-14, 1982, the following

improvements are required:

(References are to sections in the NRC Region I

Inspection Report No. 50-245/82-01; 50-336/82-01.)

1.

Revise the emergency organization to provide for all emergency functions

needed during initial, intermediate and final phases of augmentation.

Revise the Emergency Plan to include a description of the emergency

organization and update administrative and implementing procedures to be

consistent with the revised organization. The description shall include

'

sufficient detail to define the command hierarchy; specify its structure,

reporting chains and interrelationships at any phase of augmentation; and

include suparvisory as well as nonsupervisory elements.

(See Section 2.1)

2.

Develop lists of personnel trained and qualified to perform the tasks

associated with each functional area specified within the revised emergency

organization. These lists shall identify the current training status of

each individual, and provisions to maintain the lists current shall be

developed and implemented.

(See Section 2.1)

3.

Pursuant to the requirements of the generic letter dated February 18,

1981 to all licensees from Mr. D. Eisenhut, NRR, regarding the minimum

staffing requirements for nuclear power plant emergencies, perform a

study to determine how the augmentation of the on-shift staff can be

achieved within the 30 and 60-minute goals of NUREG-0654, Table B-1,

after the declaration of an emergency. The results of this study will be

documented and forwarded to the NRC Region I office for review and evaluation

along with a description of compensatory measures for any augmentation

goals not met.

(See Section 2.1)

4.

Establish an integrated emergency plan training / retraining program to

j

ensure that lesson plans are developed and training is accomplished for

each functional area of emergency activity including radiation protection

during emergencies, emergency repair / corrective actions, search and

rescue, and radwaste operations.

(See Section 3.1)

5.

Develop a procedural method to ensure'that members of the emergency

organization are trained in any pertinent changes to emergency procedures,

facilities or equipment which occur between scheduled training sessions.

I

(See Section 3.1)

6.

Develop a systematic method for documenting and maintaining records of

emergency training and retraining.

(See Section 3.1)

0FFICIAL RECORD COPY

A-1

_ _ - _ _ - _ _ _ - _ _ _ _ _

,

.

.

7.

Establish a Technical Support Center (TSC) for Unit 2 which provides on

an interim basis until a permanent TSC can be established which meets

applicable regulatory criteria, adequate working space for assigned

personnel and which alleviates potential crowding in the control room.

(See Section 4.1.1.2)

8.

Describe in the Emergent.y Plan the division of technical support functions

between the TSC, the Emergency Operations Facility, and the Corporate

Emergency Operations Ceater for Units 1 and 2 and indicate the functional

areas of emergency activity to be performed at each technical support

function location.

(See Section 4.1.1.2)

9.

Develop an implementing procedure for activating and staffing the TSC and

establishing the responsibilities and functional areas of emergency

activity to be performed in the TSC.

(See Section 4.1.1.2)

10.

Establish an Operations Support Center (OSC) with sufficient space for

assigned emergency response personnel to assemble in the event of an

emergency, and which includes communication, protective equipment and

supplies needed for the performance of emergency activities that may be

required of assigned personnel.

(See Section 4.1.1.3)

11.

Revise the Emergency Plan to describe the-location of the OSC and the

concept of operations for the OSC including how work teams will be formed,

equipped, dispatched, and controlled in an emergency.

(See Section 4.1.1.3)

12. Develop an implementing procedure for activating and staffing the OSC.

(See Section 4.1.1.3)

13.

Expedite the development of precedures and training on the post-accident

sampling systems presently being installed to ensure that the systems are

fully operational in the minimum amount of time.

Provide a status report

and schedule for these activities to the NRC Region I office.

(See

Section 4.1.1.5)

14. Perform a radiological analysis which demonstrates that liquid and gaseous

effluent samples can be obtained under postulated accident conditions.

(See Section 4.1.1.5)

15. Develop specific detailed procedures and training for obtaining liquid

and gaseous effluent samples under post-accident conditions.

(See

Section 4.1.1.5)

16. Propose a plan of action to establish consistency between the onsite

emergency classification and action level scheme those of local and State

emergency response organizations in accordance with the guidance of

NUREG-0654, Appendix 1.

(See Section 5.3)

0FFICIAL RECORD COPY

A-2

r

.

.

17. Develop specific detailed procedures and training for chemistry personnel

for the analysis in the chemistry laboratory of primary coolant', containment

air, and liquid and gaseous effluent samples containing high levels of

radioactivity. (Section 5.4.2.5)

18. Develop detailed organization and procedural methods for implementing a

radiation protection program for emergency response personnel which

provides for the continuity of critical radiation protection procedures

and functions during accident conditions.

(See Section 5.4.3.1)

19.

Improve management controls to ensure that all recuired drills and exercises

are performed and properly documented as specified in the Emergency Plan

and Implementing Procedures.

(See Section 7.1)

i

0FFICIAL RECORD COPY

A-3

<

.

.

An andix B

Emergency Preparedness Improvement Items

Based on the results of the NRC's appraisal of the Millstone Nuclear Power

Station Emergency Preparedness Program conducted January 4-14, 1982, the

following should be considered for improvement:

(References are to sections

in the NRC Region I Inspection Report No. 50-245/82-01; 50-336/82-01.)

1.

Formally appoint a full-time Emergency Planning Coordinator for the

Millstone Nuclear Power Station. The appointment should include the

development of a position description clearly specifying the duties,

responsibilities, and authority of the EPC.

(See Section 1.1)

2.

Revise the Emergency Plan to fully reflect the assignment of responsibilities

I

for maintaining emergency preparedness of Corporate and Station personnel

including the Emergency Planning Coordinator.

(See Section 1.1)

3.

Develop specific selection and qualification criteria for the Emergency

Planning Coordinator and other Station personnel with emergency planning

responsibilities.

(See Section 1.4)

l

4.

Establish a professional development program for individuals who are

l

assigned emergency planning responsibilities which will enable them to

l

attain and maintain state-of-the-art knowledge in the field of emergency

f

preparedness.

(See Section 1.4)

5.

Describe in the Emergency Plan the State role in an emergency situation

'

identifying the lead State agencies.

The interfaces between the onsite

and Corporate emergency organizations and the State of Connecticut and

other offsite emergency response agencies should be included in the

revised emergency organization description.

(See Section 2.2)

6.

Align the training categories of the emergency plan training / retraining

with the functional areas of emergency activity in the revised emergency

organization and develop a procedure to implement the program. .(See

Section 3.1)

7.

Develop a training document which describes the program for training

offsite support agencies and specifies the responsibilities for the

different training courses, training objectives, subject content of the

courses, and means for documenting the training.

(See Section 3.1)

8.

Provide means to ensure that all personnel assigned emergency response

duties receive the required training in the emergency plan training

program.

(See Section 3.2)

9.

Develop a training course for emergency managers which emphasizes the

protective action decision making process, protective action strategies,

and the use of protective action guides.

(See Section 3.2)

0FFICIAL RECORD COPY

8-1

r

.

.

10. Designate an offsite location or locations where site personnel could

reassemble in the event of a site evacuation.

(See Section 4.1.2.1)

11. Provide personnel decontamination procedures at the Emergency Operations

Facility personnel decontamination facility and in the decontamination

kit located in the Condensate Polishing Facility assembly area.

(See

Section 4.1.2.3)

12. Describe how work facilities and other resources in the vicinity of the

site would be made available for Corporate, contractor and other personnel

in the event of a large, prolonged response.

(See Section 4.1.3)

13. Develop a system to ensure that the integrity of the emergency monitoring

kits is maintained and replacements are provided for instruments taken

out of the emergency monitoring kits for calibration until the original

instruments are returned.

(See Section 4.2.1.1)

14.

Include provisions for extremity monitoring in emergency kits.

(See

Section 4.2.1.1)

15. Duplicate the readouts for the main stack effluent monitors in the Unit 2

control room.

(See Section 4.2.1.2)

16.

Install a supplementary meteorological tower to better characterize air

flow and effluent transport at the site.

(See Section 4.2.1.4)

17. Develop procedures-to ensure meteorological strip charts are properly

timed and checked at an appropriate surveillance frequency.

(See Section

4.2.1.4)

18. Provide information on a nearby source of offsite or onsite meteorological

data that can be used as a backup in the event of loss of the primary

tower, rather than the two proposed locations, Middletown or Waterbury, CT.

(See Section 4.2.1.4)

19. Provide dedicated self-contained breathing apparatus in the TSC.

(See

Section 4.2.2.1)

20. Provide reliable emergency vehicles for use by Emergency Monitoring Teams

for plume tracking capable of transporting equipment and personnel off

road and in adverse weather.

(See Section 4.2.6)

21. Develop a more usable format for EALs in Procedures OP 501 and OP 250 and

provide additional training for Shift Supervisors and other Directors of

Station Emergency Operations in classifying emergencies.

(See Section 5.3)

0FFICIAL RECORD COPY

B-2

i

_.

.

.

i

i

,

22. . Changes should be made as indicated in Section 5.3 of this report to the

emergency action levels for Unit I and Unit 2 in Procedures OP 501 and

OP 2501, respectively.

(See Section 5.3)

23.

Perform a drill to verify the adequacy of the alert, call-in, and augmentation

capabilities of the emergency response organization.

(See Section 5.4.1)

24.

Implement the procedure used to ascertain the containment source term

based on containment high-range monitor readings and provide training on

its use to dose assessment personnel.

(See Section 5.4.2)

25.

Provide action steps in Procedure EPIP 4201 for the prompt transmission

and continuous update of assessment information to State and local agencies-

responsible for protective action decision making. (See Section 5.4.2)

26. Develop provisions for trend analyses of assessment data.

(See Section 5.4.2)

27. Develop the methodology to utilize in plant sampling results and offsite

environmental survey data in the radiological consequence assessment

program.

(See Section 5.4.2)

28.

Ensure that instrumentation specified in the emergency monitoring and

sampling ;.ucedures is available for use by EMT. members; include guidance

'

for self-extremity monitoring in the procedures.

(See Section 5.4.2.3)

29.

Provide emergency data sheets for each sample and establish a method for

providing the information to personnel in the emergency organization

responsible for assessment decisions.

(See Section 5.4.2.5)

,

30.

Reference in emergency sampling procedures any routine procedures that

are to be used during emergencies.

(See Section 5.4.2.10)

31. Develop a specific procedure for site evacuation specifying the emergency

position or individual in the emergency organization responsible for each

action and including references to other pertinent procedures.

(See

Section 5.4.3.2)

32.

Develop a personnel accountability procedure which lists each step in the

4

accountability process, identifies the responsible individual, and provides

for a full accounting of plant personnel within 30 minutes from the

declaration of an emergency.

(See Section 5.4.3.3)

33.

Revise the appropriate procedures to provide for the monitoring and

decontamination of personnel in the control room and at all assembly area

locations.

(See Section 5.4.3.4)

34. Develop decontamination procedures for skin contaminated with radioiodine.

l

(See Section 5.4.3.4)

0FFICIAL RECORD COPY

B-3

-

- . .

. . , . . _ . . , . _

. . . ~

, _ - . _

- .

.

. . .

.

-

,

1

.

35. Specify in Procedure EPIP 4208 the emergency position or individual

within the emergency organization responsible for organizing, controlling,

and supervising the search and rescue effort.

(See Section 5.4.3.5)

36. Specify in Procedure EPIP 4209 the emergency position or individual

within the emergency organization responsible for organizing, controlling

and supervising the repair and corrective action effort.

Include in the

procedure the criteria for team selection, location of emergency equipment

and means for communicating.

(See Section 5.4.5)

37. Develop a procedure to implement the transition from an emergency

classification to a recovery mode, including specific criteria upon which

the emergency classes will be downgraded and provisions for notifying

Federal, State and local of ficials prior to entering a recovery mode.

(See Section 5.4.6)

38. Develop a specific procedure for disseminating public information which

describes the information flow process and provides for the initial

period of time prior to the establishment of the Media Center and for

public inquiries separate from the news media.

(See Section 5.4.7)

39. Revise EPIP 4603 to include provisions to specify frequency of inventories

and operational checks of emergency equipment; responsibility for the

performance of emergency equipment inventories, operational checks, and

calibration; and change-out and replacement schedules for items having

limited shelf life.

(See Section 5.5.1)

40. Consolidate into one Emergency Plan Implementing Procedure all of the

requirements and responsibilities for drills and exercises.

(See

Section 5.5.2)

41. Revise the Technical Specifications to be consistent with the requirement

in 10 CFR 50.54(t) that an audit of the emergency preparedness program be

done at least every 12 months.

(See Section 5.5.4)

42. Develop a procedure to ensure that all letters of agreement with offsite

support agencies are reviewed and updated on an annual basis.

(See

Section 6.1)

43. Disseminate emergency planning information to the public including transient

populations within the plume exposure pathway Emergency Planning Zone.

(See Section 6.2)

44,

Revise the Emergency Plan to include, or make reference to, the media

education and familiarization program including a description of the

program and program responsibility.

(See Section 6.3)