- ML20045G542 + (ML20045G542)
- ML20045G543 + (ML20045G543)
- PNO-III-93-039, on 930706,augmented Insp Team Dispatched to Facility Due to Fuel Assembly Stuck as Upper Reactor Internals Lifted.Licensee Stopped Lift & Closed Containment Hatch to Restore Containment Integrity + (ML20045G544)
- ML20045G545 + (ML20045G545)
- ML20045G546 + (ML20045G546)
- ML20045G547 + (ML20045G547)
- ML20045G548 + (ML20045G548)
- ML20045G549 + (ML20045G549)
- ML20045G551 + (ML20045G551)
- PNO-III-93-038A, licensee & Fuel Vendor Confirmed That Highly Radioactive Object Found in Refueling Area Was Fuel Rod from Fuel Assembly Currently Located in Reactor Vessel.Three Pieces of Fuel Rod Recovered.Some Pellets Still Missing + (ML20045G552)
- ML20045G553 + (ML20045G553)
- ML20045G558 + (ML20045G558)
- HL-3334, Part 21 Rept Re Defect in safety-related Solenoid Valve Mfg by Automatic Valve Co & Supplied by Atwood & Morrill Co,Inc. Solenoid Valves Installed in Unit 1 MSIVs Visually Inspected.Spare Solenoids Inspected Also + (ML20045G559)
- ML20045G560 + (ML20045G560)
- ML20045G561 + (ML20045G561)
- ML20045G564 + (ML20045G564)
- ML20045G565 + (ML20045G565)
- ML20045G567 + (ML20045G567)
- PNO-III-93-040, on 930619,plant Shut Down for Repair of Leak in HPCI Sys.Licensee Does Not Plan to Restart Plant as Previously Scheduled Because of Flooding of Area Evacuation Routes + (ML20045G568)
- ML20045G569 + (ML20045G569)
- ML20045G570 + (ML20045G570)
- ML20045G571 + (ML20045G571)
- B14519, Forwards Applied Research Associates,Inc Final Rept 5773.1, Tornado PRA of CT Yankee Atomic Power Station:Update 1992, to Support Closeout of SEP Topics III-2 & III-4.A Re Wind & Tornado Loadings/Tornado Missiles,Respectively + (ML20045G572)
- ML20045G574 + (ML20045G574)
- ML20045G575 + (ML20045G575)
- ML20045G576 + (ML20045G576)
- ML20045G577 + (ML20045G577)
- ML20045G578 + (ML20045G578)
- BSEP-93-0108, Provides Suppl Info Re Tornado Wind Loads on Reactor Bldg Fan Room Miscellaneous Steel Framing for Partition Walls + (ML20045G579)
- ML20045G581 + (ML20045G581)
- 05000325/LER-1993-003-03, :on 930608,RPS MG a Tripped,Resulting in Successful ESF Actuations & Isolations Due to Defective Procedure.Voltage Adjust Potentiometer for MG a Voltage Regulator Replaced on 930617 + (ML20045G582)
- B14539, Forwards Rev 26 to Haddam Neck Plant Physical Security Plan. Rev Withheld,Per 10CFR2.790(a) + (ML20045G583)
- ML20045G584 + (ML20045G584)
- ML20045G585 + (ML20045G585)
- ML20045G586 + (ML20045G586)
- ML20045G587 + (ML20045G587)
- ML20045G588 + (ML20045G588)
- SNRC-2071, Forwards Request for Exemption from Requirements of Revised 10CFR20,stds for Protection Against Radiation.Requests Also That Interim Relief from Implementation Date of Revised Requirements in 10CFR20.1001-20.2401 Be Promptly Granted + (ML20045G589)
- ML20045G590 + (ML20045G590)
- ML20045G591 + (ML20045G591)
- ML20045G592 + (ML20045G592)
- ML20045G595 + (ML20045G595)
- ML20045G596 + (ML20045G596)
- ML20045G597 + (ML20045G597)
- ML20045G598 + (ML20045G598)
- ML20045G600 + (ML20045G600)
- ML20045G602 + (ML20045G602)
- ML20045G603 + (ML20045G603)
- ML20045G605 + (ML20045G605)
- ML20045G606 + (ML20045G606)
- NUREG-1431, Informs That NRC Developing Estimates of Agency Costs & Benefits for Implementation of Improved Sts,Based on Experience Thus Far W/Plant Conversion & License Amend Screening Process + (ML20045G607)