Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039F410 + (ML20039F410)
- ML20039F411 + (ML20039F411)
- ML20039F412 + (ML20039F412)
- ML20039F413 + (ML20039F413)
- ML20039F414 + (ML20039F414)
- ML20039F416 + (ML20039F416)
- ML20039F417 + (ML20039F417)
- PNO-III-82-004, on 820105,Campbell Pacific Soil Density Gauge Was Stolen from Licensee Vehicle Parked at Hammond,In Shopping Ctr.Gauge Contains 10 Mci Cs-137 & 50 Mci Am-241 + (ML20039F418)
- ML20039F419 + (ML20039F419)
- IR 05000206/1981037 + (ML20039F420)
- ML20039F421 + (ML20039F421)
- ML20039F422 + (ML20039F422)
- ML20039F423 + (ML20039F423)
- ML20039F425 + (ML20039F425)
- ML20039F429 + (ML20039F429)
- ML20039F431 + (ML20039F431)
- ML20039F432 + (ML20039F432)
- ML20039F434 + (ML20039F434)
- ML20039F435 + (ML20039F435)
- ML20039F436 + (ML20039F436)
- PNO-V-82-001, on 820107,senior Resident Inspector Was Informed of 820107 Site Visit by Several Members of House Committee on Science & Technology for General Familiarization W/Facility + (ML20039F438)
- ML20039F439 + (ML20039F439)
- ML20039F440 + (ML20039F440)
- ML20039F447 + (ML20039F447)
- ML20039F448 + (ML20039F448)
- ML20039F453 + (ML20039F453)
- ML20039F454 + (ML20039F454)
- ML20039F456 + (ML20039F456)
- ML20039F457 + (ML20039F457)
- ML20039F458 + (ML20039F458)
- ML20039F459 + (ML20039F459)
- ML20039F460 + (ML20039F460)
- 05000259/LER-1981-084, Forwards LER 81-084/03L-0 + (ML20039F461)
- RBG-11-875, Responds to Re Request for Expanded Distribution. H Denton Will Be Included on Distribution List for Quarterly Const Network Update Submittals to NUREG-0030.Changes Re Fuel Load & Operation Will Be Provided Separately + (ML20039F465)
- 05000259/LER-1981-084-03, /03L-0:on 811207,during Main Steam Line Low Pressure Calibr & Functional test,1-PS-1-72 Operated Below Tech Spec Limits.Caused by Setpoint Drift.Pressure Switch Recalibr & Design Change Request to Replace Switch Planned + (ML20039F466)
- ML20039F468 + (ML20039F468)
- 05000338/LER-1981-077, Forwards Updated LER 81-077/03X-1 + (ML20039F470)
- ML20039F472 + (ML20039F472)
- ML20039F473 + (ML20039F473)
- ML20039F475 + (ML20039F475)
- 05000267/LER-1981-073, Forwards LER 81-073/03L-0.Detailed Event Analysis Encl + (ML20039F477)
- ML20039F479 + (ML20039F479)
- 05000338/LER-1981-077-03, Boron Concentration in 1A & 1B Safety Injection Accumulators Exceeded Max Tech Specs Limit for Third Time in 1 Wk.Caused by Spent Fuel Pit Leakage Into Makeup Supply Header.Accumulator Drained + (ML20039F480)
- 05000261/LER-1981-029, Forwards LER 81-029/03L-0 + (ML20039F481)
- 05000261/LER-1981-029-03, /03L-0:on 811130,w/unit at Hot Shutdown,Leak Was Discovered in Chemical & Vol Control Sys.Caused by Failed bonnet-to-body Gasket on Valve CVC-291.Gasket Replaced + (ML20039F483)
- 05000328/LER-1981-152, Forwards LER 81-152/01T-0 + (ML20039F484)
- BSEP-81-2445, Forwards Monthly Operating Repts for Nov 1981 + (ML20039F486)
- ML20039F488 + (ML20039F488)
- ML20039F490 + (ML20039F490)
- 05000267/LER-1981-073-03, /03L-0:on 811208,one Helium Circulator Bearing Drain Pressure Low Switch Found to Have Trip Point Outside Required Limits.Caused by Dirt Accumulation in Electrical Switch That Impeded Contact + (ML20039F491)
- ML20039F492 + (ML20039F492)