This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039E960 + (ML20039E960)
- ML20039E961 + (ML20039E961)
- ML20039E962 + (ML20039E962)
- 05000346/LER-1981-075, Forwards LER 81-075/03L-0 + (ML20039E963)
- ML20039E965 + (ML20039E965)
- IR 05000498/1981035 + (ML20039E966)
- ML20039E967 + (ML20039E967)
- 05000346/LER-1981-075-03, /03L-0:on 811129,TE-RC3A2 Failed Causing Input to Reactor Protection Sys Channel 4 to Fail High & Trip on High Temp & Temp/Pressure.Caused by TE-RC3A2 Failing in Open Position.Alignment & String Check Performed + (ML20039E968)
- ML20039E969 + (ML20039E969)
- ML20039E970 + (ML20039E970)
- ML20039E971 + (ML20039E971)
- ML20039E972 + (ML20039E972)
- ML20039E974 + (ML20039E974)
- ML20039E975 + (ML20039E975)
- ML20039E977 + (ML20039E977)
- ML20039E979 + (ML20039E979)
- ML20039E981 + (ML20039E981)
- ML20039E982 + (ML20039E982)
- IR 05000498/1981036 + (ML20039E983)
- IR 05000460/1981010 + (ML20039E984)
- ML20039E985 + (ML20039E985)
- ML20039E986 + (ML20039E986)
- ML20039E987 + (ML20039E987)
- ML20039E988 + (ML20039E988)
- LD-82-001, Forwards Proprietary & Nonproprietary Versions of Cesec Digital Sumulation of C-E Nsss. Proprietary Version Available in Central Files Only + (ML20039E991)
- ML20039E994 + (ML20039E994)
- ML20039E995 + (ML20039E995)
- 05000237/LER-1981-072, Forwards LER 81-072/03L-0 + (ML20039E996)
- ML20039E998 + (ML20039E998)
- 05000312/LER-1981-056, Forwards LER 81-056/01T-0.Detailed Event Analysis Submitted + (ML20039E999)
- 05000237/LER-1981-072-03, /03L-0:on 811203,standby Gas Treatment Sys Train B Tripped Following Group II & III Isolation Signal & Declared Inoperable.Caused by Plugged Orifice on Air Flow Controller, Stopping Air Flow & Falsely Indicating Fan Flow + (ML20039F001)
- ML20039F002 + (ML20039F002)
- 05000271/LER-1981-035, Forwards LER 81-035/03L-0 + (ML20039F003)
- 05000312/LER-1981-056-01, /01T-0:on 811211,instrument Technician Tested Instrumentation on Reactor Protective Sys Channel When Trip Sys Not Set Up to Retain Min Degree of Redundancy.Caused by Failure to Follow Procedures.Technicians Reinstructed + (ML20039F005)
- 05000312/LER-1981-057, Forwards LER 81-057/03L-0.Detailed Event Analysis Submitted + (ML20039F007)
- ML20039F009 + (ML20039F009)
- 05000271/LER-1981-035-03, /03L-0:on 811204,during Core Spray Valve Test, Breaker for V14-11A Tripped & Reactor Shutdown Commenced. Caused by Breaker Not Latching When Closed,Allowing Breaker to Trip Below Setpoint.Breaker Replaced + (ML20039F010)
- ML20039F011 + (ML20039F011)
- 05000312/LER-1981-057-03, /03L-0:on 811208,reactor Protection Channel C Found Indicating 15 Psi Higher than Channels A,B & D. Apparently Caused by Transmitter Failure.Investigation Continuing & Channel C Bypassed + (ML20039F013)
- ML20039F015 + (ML20039F015)
- ML20039F017 + (ML20039F017)
- ML20039F019 + (ML20039F019)
- ML20039F020 + (ML20039F020)
- IR 05000373/1981043 + (ML20039F021)
- ML20039F022 + (ML20039F022)
- ML20039F023 + (ML20039F023)
- ML20039F024 + (ML20039F024)
- ML20039F025 + (ML20039F025)
- ML20039F028 + (ML20039F028)
- ML20039F030 + (ML20039F030)
- ML20039F033 + (ML20039F033)