ML20039F017
| ML20039F017 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 01/05/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20039F018 | List: |
| References | |
| NUDOCS 8201110724 | |
| Download: ML20039F017 (2) | |
See also: IR 05000373/1981043
Text
.
.
GB?.
r
,/
IKt ,o
Docket No. 50-373
[
Sc 3
i-
/
\\/
Commonwealth Edison Company
,
ATTN:
Mr. Cordell Reed
j
-
.2
Vice President
'
'
' ')
Post Office Box 767
/'
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. Lanksbury,
F. Maura and M. Ring of this office on November 9,10, 12, 13, 17-20 and
becember 1-4, 1981, of activities at the LaSalle County Station, Unit 1,
authorized by NRC Construction Permit No. CPPR-99 and to the discussion of our
findings with Messrs. B. Stephenson and R. Bishop at the conclusion of the in-
spection and to the management meeting held in the NRC Region III offices on
December 10, 1981, between Messrs. C. E. Norelius, R. L. Spessard and others
of this of fice, and Mr. C. Reed and others of his staff.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intentien
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of t his letter a written application to this office
to withhold such information.
If your re.:eipt of this letter has been
delayed such that less than seven (7) days are available fce your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
8201110724 820105
PDR ADOCK 050003
o
<<re /
J
0l
.
.,
Corrmonwealth Edison Company
-2-
JAN 5
1982
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
l_
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C'L C
I
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
Inspection Report
No. 50-373/81-43
cc w/ enc 1:
Louis 0. DelGeorge, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. II. llolyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
,
hary J., Murray, Office of
Assistant Attorney General
RIII
RIII
R II
RIII
RIII
RIII
h5
&fd (N fa'$
_jff'
f',.Jfa'Ura/so $cu., Lanksbury
ing
Reimann
/'Winiams
Nore1ius
i12/21/81