- 05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room + (ML20009G087)
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared + (ML20009G088)
- 05000324/LER-1981-056-01, /01T-0:on 810624,notification Received That 38 Pipe Supports Would Have Failed During Design Basis Seismic Event.Caused by Higher than Normal Slenderness Ratio. Identified Supports Upgraded + (ML20009G089)
- ML20009G090 + (ML20009G090)
- 05000311/LER-1981-037, Forwards LER 81-037/03L-0.Detailed Event Analysis Encl + (ML20009G091)
- ML20009G092 + (ML20009G092)
- 05000324/LER-1981-055, Forwards LER 81-055/03L-0 + (ML20009G093)
- ML20009G094 + (ML20009G094)
- ML20009G095 + (ML20009G095)
- ML20009G096 + (ML20009G096)
- ML20009G097 + (ML20009G097)
- ML20009G098 + (ML20009G098)
- ML20009G099 + (ML20009G099)
- ML20009G100 + (ML20009G100)
- BSEP-81-1259, Clarifies Event Previously Reported as LER (2-81-56)per 810618 Telcon.Facility in Compliance W/Ieee 279-1971.No Reportable Event Determined.Ler Number Referenced Will Be Reassigned as Appropriate + (ML20009G102)
- ML20009G103 + (ML20009G103)
- 05000369/LER-1981-090, Forwards LER 81-090/03L-0.Detailed Event Analysis Encl + (ML20009G104)
- ML20009G105 + (ML20009G105)
- 05000324/LER-1981-055-03, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced + (ML20009G107)
- BSEP-80-1263, RO 2-84-55:anchor Bolt Testing Required by IE Bulletin 79-02 Not Performed on Control Rod Drive Piping.Caused by Unusual Arrangements for Installation of Piping.Anchor Bolt Repairs & as-built Verifications Table Done + (ML20009G108)
- 05000261/LER-1981-016, Forwards LER 81-016/03L-0 + (ML20009G109)
- ML20009G110 + (ML20009G110)
- 05000311/LER-1981-037-03, /03L-0:on 810608,paper Filter Drive for Containment Particulate Channel 2R11A Failed.Caused by Failure of Racket Arm Link on Filter Drive Mechanism.Link Replaced + (ML20009G111)
- 05000311/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (ML20009G112)
- ML20009G113 + (ML20009G113)
- 05000369/LER-1981-090-03, /03L-0:on 810530,while Entering Mode 3,S/G 1B Wide Range Level Instrumentation Pegged High.Caused by Equalizer Valve on Transmitter 1CFLT5620 Valving Open,Resulting in Drained HP Ref Leg.Valve Closed & Leg Filled + (ML20009G114)
- ML20009G115 + (ML20009G115)
- 05000261/LER-1981-016-03, /03L-0:on 810611,during Startup,Motor Driven Auxiliary Feedwater Pump a Tripped Due to Low Discharge Pressure While Feeding Steam Generators.Event Reoccurred on 810716.Caused by Backleakage Through Discharge Valve AFW-40 + (ML20009G118)
- 05000311/LER-1981-042, Forwards LER 81-042/03L-0.Detailed Event Analysis Encl + (ML20009G119)
- ML20009G120 + (ML20009G120)
- ML20009G122 + (ML20009G122)
- ML20009G123 + (ML20009G123)
- 05000311/LER-1981-041-03, /03L-0:on 810612,leakage of 13 Gpm Into Pressurizer Relief Tank Identified.Caused by RHR Suction Piping Relief Valve (2RH3) Actuating at Less than Design Lift Setting & Failing to Reseat.Lift Setting Readjusted + (ML20009G125)
- ML20009G126 + (ML20009G126)
- ML20009G127 + (ML20009G127)
- ML20009G128 + (ML20009G128)
- 05000311/LER-1981-042-03, /03L-0:on 810609,RCS Allowed to Decrease to Less than 541 F.Caused by Overfeeding Steam Generators & Inserting Control Rods.Control Rods Withdrawn & Personnel Counseled on Plant Procedures & Practices + (ML20009G129)
- 05000311/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (ML20009G130)
- ML20009G131 + (ML20009G131)
- ML20009G132 + (ML20009G132)
- 05000311/LER-1981-043, Forwards LER 81-043/03L-0.Detailed Event Analysis Encl + (ML20009G133)
- ML20009G134 + (ML20009G134)
- IR 05000029/1981006 + (ML20009G135)
- IR 05000352/1981009 + (ML20009G137)
- ML20009G138 + (ML20009G138)
- 05000311/LER-1981-039-03, /03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled + (ML20009G139)
- 05000259/LER-1981-033, Forwards LER 81-033/03L-0.Supersedes + (ML20009G140)
- ML20009G142 + (ML20009G142)
- ML20009G143 + (ML20009G143)
- ML20009G144 + (ML20009G144)
- ML20009G145 + (ML20009G145)