Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20008E216 + (ML20008E216)
- ML20008E217 + (ML20008E217)
- 05000317/LER-1980-047-03, /03L-0:on 800920,sump Drain 1-MOV-5463 Failed to Shut.Caused by Blown Fuse in Controller.Fuse Replaced + (ML20008E218)
- ML20008E219 + (ML20008E219)
- ML20008E220 + (ML20008E220)
- ML20008E221 + (ML20008E221)
- ML20008E222 + (ML20008E222)
- ML20008E223 + (ML20008E223)
- ML20008E226 + (ML20008E226)
- ML20008E227 + (ML20008E227)
- ML20008E228 + (ML20008E228)
- AECM-80-262, Second Interim Deficiency Rept Re Debris That Could Accumulate & Clog Heat Exchangers in Safety Related Sys.Util Reviewing Proposed Design Changes.Final Rept Will Be Submitted on 810306 + (ML20008E230)
- ML20008E233 + (ML20008E233)
- ML20008E235 + (ML20008E235)
- ML20008E238 + (ML20008E238)
- 05000334/LER-1980-036, Forwards Updated LER 80-036/03L-1 & LER 80-068/03L-0 + (ML20008E239)
- ML20008E241 + (ML20008E241)
- ML20008E242 + (ML20008E242)
- ML20008E243 + (ML20008E243)
- ML20008E245 + (ML20008E245)
- ML20008E247 + (ML20008E247)
- ML20008E248 + (ML20008E248)
- ML20008E249 + (ML20008E249)
- ML20008E250 + (ML20008E250)
- 05000334/LER-1980-068-03, /03L-0:on 800917,during Testing of 1C High Head Charging Pump,Bearing Temps Began Increasing & Pump Was Shut Down.Caused by Personnel Not Installing Valves Properly.Valves Repositioned + (ML20008E251)
- ML20008E252 + (ML20008E252)
- 05000324/LER-1980-072, Forwards LER 80-072/03L-0 + (ML20008E253)
- ML20008E254 + (ML20008E254)
- ML20008E255 + (ML20008E255)
- ML20008E256 + (ML20008E256)
- ML20008E258 + (ML20008E258)
- ML20008E259 + (ML20008E259)
- 05000324/LER-1980-072-03, /03L-0:on 800915,during Auto Scram Test,Control Rod 38-15 Took 13-s to Insert Fully Versus Specified Requirement of 7-s.Cause Is Undetermined.Subsequent Test Was Satisfactory + (ML20008E260)
- 05000334/LER-1980-073-01, /01T-0:on 801017,Westinghouse Notification Received Re Blowdown of All Three Generators & Loss of Heat Sink During Single steam-line Break.No Corrective Actions Necessary + (ML20008E261)
- ML20008E263 + (ML20008E263)
- ML20008E264 + (ML20008E264)
- ML20008E267 + (ML20008E267)
- ML20008E269 + (ML20008E269)
- ML20008E271 + (ML20008E271)
- ML20008E273 + (ML20008E273)
- ML20008E275 + (ML20008E275)
- ML20008E277 + (ML20008E277)
- ML20008E278 + (ML20008E278)
- ML20008E280 + (ML20008E280)
- ML20008E282 + (ML20008E282)
- ML20008E284 + (ML20008E284)
- ML20008E285 + (ML20008E285)
- ML20008E289 + (ML20008E289)
- ML20008E290 + (ML20008E290)
- ML20008E292 + (ML20008E292)
- ML20008E293 + (ML20008E293)