ML20008E241

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-036/03L-1 & LER 80-068/03L-0
Date released: 01/22/2020 Download: ML20008E241


LER 80-068/03L-0:on 800917,during Testing of 1C High Head Charging Pump,Bearing Temps Began Increasing & Pump Was Shut Down.Caused by Personnel Not Installing Valves Properly.Valves Repositioned
ML20008E251
Person / Time
Site: Beaver Valley
Issue date: 10/17/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20008E251 (2)
Updated LER 80-036/03L-1:on 800514,boric Acid Buildup Discovered Around Cracked soc-o-let Weld on RHR Pump Vent Valve.Caused by Pipe Nipple Length,Vibration & Valve Weight. Fitting Rewelded
ML20008E246
Person / Time
Site: Beaver Valley
Issue date: 10/17/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20008E246 (1)
Forwards Updated LER 80-036/03L-1 & LER 80-068/03L-0
ML20008E239
Person / Time
Site: Beaver Valley
Issue date: 10/17/1980
From: Werling J
DUQUESNE LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20008E239 (2)