ML20008E289
| ML20008E289 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 10/17/1980 |
| From: | Denise Edwards YANKEE ATOMIC ELECTRIC CO. |
| To: | Eisenhut D NRC COMMISSION (OCM), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8010240506 | |
| Download: ML20008E289 (2) | |
Text
_ _ _ _ _ -
..,. p c.
Telephone 617 366-9011 rwx 7so-390-0739 YANKEE ATOMIC ELECTRIC COMPANY
[
20 Turnpoke Road Westborough, Massachusetts 0158i
.YAN KEE October 17, 1980 Units. States Nuclear Regulatory Cotamission Washington, D. C.
20555 Attention:
Mr. Darrell G. Eisenhut, Director Office of Nuclear Reactor Regulation Division of Licensing
Dear Darrell:
During our meeting on October 9 I mentioned that we had received a seemingly large number of orders and 50.54"f" caliber letters thus far this year. The attached summary is a tabulation of these. It is interesting to note that these 38 pieces of correspondence were received in addition to some 153 other letters requiring action on our part. We are probably no less busy than other licensees and that is probably the reason for a groan every time your office hints of fesuing another major piece of correspondence.
I hope this information is interesting and helpful to you.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY D. W. Edwards Director of Operational Projects DWE/scw Attachment
(
l B01024 0 7q, P
o.
.11 Orders Received This Year To Date.
1/2/80 YR, VY, MY Implement TMI Cat. A requirements by 1/31/80 2/21/80 VY Install Recirculation Pump Trip 4/4/80 Y3 Review Class I-E & Nonclass I-E Buses Environ. Qualification Electrical Equipment due 8/29/80 YR, VY, MY Committed Date 9/19/80 YR, VY, MY Modification of License Revision
.27 Corresp7ndence Requiring Response Under 50.54"f"This Year.
LWR Primary Coolant System Pressure Isolation Valves 2/23/80 YR, VY, MY 1/14/80 VY, MY Class IE Equipment 2/25/80 MY Westinghouse Turbine Cracks 3/6/80 MY Crystal River - 3 Event Information Request 3/13/80 YR, VY, MY ESF Reset Controls Schedules Environmental Qualification Electrical 3/28/80 YR Equipment 4/4/80 VY BWR Jet Pump Assembly Failure 5/8/80 YR, VY, MY Masonry Wall Design 5/9/80 YR, VY, MY Decay Heat Removal System Operability 5/13/80 VY BWR Jet Pump Assembly 5/16/80 VY GE Low Pressure Turbines Possible Loss of Emergency Notification System 6/18/80 YR, VY, MY with Loss Offsite Power 7/3/80 VY Failure of Control Rods to Insert 7/18/80 VY Supplement-Failure of Control Rods to Insert 8/4/80 YR Seismic Design 10/1/80 VY BWR Scram System 3
153 Other Correspondence Requiring Response This Year.
YR, VY. MY