ML20008E267
| ML20008E267 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/17/1980 |
| From: | Sklar J JERSEY CENTRAL POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20008E264 | List: |
| References | |
| NUDOCS 8010240480 | |
| Download: ML20008E267 (2) | |
Text
_
OPERATING DATA REPORT -
OPERkTINGSTATUS 3
UNIT NAME.. 0YSTER CREEK DOCKET NUMBER.. 50-219 UTILITY DATA PREPARED BY... J.B. SKLAR 609-693-6013 REPORTING PERIOD... July '1980 (b*Wea)
LICENSED THERMAL POWER (MWT).. 1930 NAMEPLATE RATING (GROSS MWE).. 650
' ~
DESIGN ELECTRICAL RATING (NET MWE).. 650 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).. 650 MAXIMUN DEPENDABLE CAPACITY (NET MWE).. 620 IF CHANGES OCCUR IN CAPACITY RATING SINCE LAST REPORT, GIVE REASON...
NONE POWER LEVEL TO WHICH RESTRICTED, IF ANY(NET'MWE)...
650
~
REASON FOR RESTRICTION, IF ANY...'
CONDENSATE DEMINERALIZER DIFFERENTIAL PRESSURE MONTH YEAR CUMULATIVE HOURS IN PERIOD 744.0 5111.0 92975.0 HOURS RX CRITICAL 367.9 469.4 69108.7 RX RESERVE SHUTDOWN HRS.
0.0 0.0 463.2 HRS. GEN ON LINE 297.8 396.2 67701.7 UT RESERVE SHUTDOWN HRS 0.0 O.0 0.0 GROSS THERMAL ENERGY 396663.8 554274.4 114433433.7 GROSS ELEC ENERGY 11'9020.0 172690.0 39055005.0 NET ELEC ENERGY 110500.0 159112.0 37640125.0 UT SERVICE FACTOR 40.0 7.8 72.8 UT AVAILABILITY FACTOR 40.0 7.8 72.8 l
UT CAPACITY FACTCR MDC 24.0 5.0 66.9 UT CAPACITY FACTOR DER 22.0 4.8 62.3 FORCED OUTAGE FACTOR 0.0 0.0 6.4 THE NEXT SCHEDULED OtlTAGE IS TO BEGIN IN SPRING l18l N O 10240 @
uq-,
g m
-me.
-.d.wh.
~
~
AVERADE DAILY POWER LEVEL DOCKET 4.....
50-21'9 UNIT..........
O. C.
- 1 REPORT DATE... October 17, 1980 COMPILED BY... J.B. SKLAR' TELEPHONE..... 609-693-6013 MONTH July 1980 (Redsim)
,1.
6.
17.
O.
2.
O.
18.
O.
3.
O.
19.
12.
4.
6.
20.
236.
5.
O.
21.
272.
6.
O.
22.
337.
7.
O.
23.
373.
8.
O.
24.
372.
9.
0.-
25.
376.
10.
O.
26.
374.
11.
O.
27.
376.
12.
O.
28.
466.
13.
6.
29.
509.
14.
O.
30.
507.
15.
O.
31.
497.
l 16.
13.
l I
_.