Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005F111 + (ML20005F111)
- ML20005F112 + (ML20005F112)
- ML20005F115 + (ML20005F115)
- ML20005F118 + (ML20005F118)
- ML20005F119 + (ML20005F119)
- ML20005F120 + (ML20005F120)
- ML20005F125 + (ML20005F125)
- ML20005F134 + (ML20005F134)
- ML20005F135 + (ML20005F135)
- ML20005F136 + (ML20005F136)
- ML20005F137 + (ML20005F137)
- ML20005F140 + (ML20005F140)
- ML20005F143 + (ML20005F143)
- ML20005F144 + (ML20005F144)
- 05000260/LER-1989-028-01, :on 891206,reactor Protection Sys Actuation Occurred Due to Trip Signal Generated by Low Scram Pilot Air Header Pressure.Caused by Failure of Soldered Connection. Connection Repaired + (ML20005F146)
- ML20005F147 + (ML20005F147)
- ML20005F149 + (ML20005F149)
- ML20005F151 + (ML20005F151)
- 05000368/LER-1989-023, :on 891117,noted That Channel a Not Responding to Change in Power Level & Declared Inoperable.Caused by Defective Preamplifier.Evaluation of Sys Design & Channel Functional Test Initiated + (ML20005F155)
- ML20005F156 + (ML20005F156)
- 05000313/LER-1989-043, :on 891208,discovered That Approx 50% of One Nut Ring Half Beneath Reactor Vessel Nozzle Flange Corroded Away.Caused by Gradual Deterioration of Gasket Matl.Design Change Implemented + (ML20005F157)
- ML20005F158 + (ML20005F158)
- 05000302/LER-1989-040, :on 891208,emergency Diesel Generators a & B Actuated Due to Degraded Voltage When Condensate Pump Started.Operator Guidelines & Procedures for Starting Condensate Pumps Being Revised + (ML20005F160)
- ML20005F161 + (ML20005F161)
- SNRC-1664, Forwards Application for Amend to License NPF-82,creating Defueled Facility Ol.Justification for Amend Provided in Encl Rept, Shoreman Nuclear Power Station Defueled Sar + (ML20005F163)
- ML20005F164 + (ML20005F164)
- ML20005F165 + (ML20005F165)
- ML20005F166 + (ML20005F166)
- PNO-III-90-002, on 900107,unit Automatically Shut Down as Result of Low Water Level in Reactor Vessel.Caused by Personnel Removing Wrong Control Power Fuses Resulting in Complete Deenergerization of 480 V Bus F1C + (ML20005F167)
- ML20005F168 + (ML20005F168)
- ML20005F170 + (ML20005F170)
- ML20005F171 + (ML20005F171)
- IR 05000285/1989046 + (ML20005F176)
- ML20005F177 + (ML20005F177)
- ML20005F179 + (ML20005F179)
- ML20005F181 + (ML20005F181)
- 05000155/LER-1989-009-01, :on 891027 & 31,turbine Bypass Valve Would Not Open When Given Open Signal.Caused by Characteristics of Garlock Style 938 Which Hardens When Subj to Heat & Pressure.Valves Repacked Using Carbon Spacers + (ML20005F183)
- ML20005F188 + (ML20005F188)
- ML20005F190 + (ML20005F190)
- ML20005F196 + (ML20005F196)
- ML20005F197 + (ML20005F197)
- ML20005F199 + (ML20005F199)
- IR 05000282/1989028 + (ML20005F203)
- ML20005F205 + (ML20005F205)
- 05000313/LER-1989-040, :on 891205 & 06,automatic Actuations of Emergency Diesel Generator Occurred as Result of Loss of Power to 480-volt ESF Bus.Caused by Personnel Error During Bus Transfer.Mgt Briefings Conducted + (ML20005F207)
- ML20005F209 + (ML20005F209)
- IR 05000254/1989027 + (ML20005F213)
- ML20005F215 + (ML20005F215)
- PNO-III-90-001, on 891229,licensee Reported Loss of 2 Mci Cs-137 Brachytherapy Needle Discovered During Routine Sealed Source Inventory on 891228 & Believed Placed Inadvertently in Trash on 891023.Notice Posted Notifying Personnel + (ML20005F217)
- ML20005F218 + (ML20005F218)
- IR 05000254/1989026 + (ML20005F219)