ML20005F166

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-317/89-12 & 50-318/89-12.Corrective Actions:Preventive Maint Procedures for Bulletin 85-003 Will Be Revised by 900115
ML20005F166
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/05/1990
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-85-003, IEB-85-3, NUDOCS 9001160005
Download: ML20005F166 (2)


Text

w

(?f

y _

_F~

o.

i BALTIMORE i

GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORE, MARY 1.AND 21203 oc noc c. cace' i.

JanuarE 5,1990 1

Vict PatsiDth?-

Nucatan cutmot I

(400#SO*edSS R

U. S. Nuclear Regulatory Commission Washington, DC 20555 i

ATTENTION:

Document Control Desk 1

I

SUBJECT:

Calvert Cliffs Nuclear Power Plant

[.

Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Reply to Notices of Violation (Inspection Report Nos. 50-317/89-12; 50-318/89-12) i

REFERENCES:

(n) Letter from Mr. J. P. Durr (NRC) to Mr. G. C. Creel (BG&E),

dated June 16, 1989, same subject (b) Letter from Mr. G. C. Creel (BG&E) to Document Control Desk (NRC), dated July 27, 1989, same subject j

l (c) Teleconference between Mr. G. L. Bell (BGAE) and Mr. J. E. Beall (NRC) on January 2,1990, Corrective Action Extension Gentlemen:

In response to a Notice of Violation issued June 16,1989 (Reference a), BG&E agreed to take several corrective actions with respect to our Motor Operated Valve (MOV) rnaintenance program. As part of the corrective actions, we agreed to revise our preventive maintenance procedures for Bulletin 85-03 MOVs by December 31, 1989 (Reference b). We did not meet this schedule because the MOV Project Manager did not effectively resolve impediments to the procedure revisions,

- Both Units have remained shutdown since the MOV inspection and have not entered into a mode where the identified MOVs are required to be OPERABLE. Also, preventive maintenance (PM) for these valves is not scheduled until the end of January. We will complete the maintenance procedure revisions by January 15, 1990. In addition, we will not perform any Bulletin MOV PM until the procedures are revised, i

i l

We informed Mr. J. E. Beall, our acting Senior Resident inspector, January 2,

1990, I

that we would not meet our schedule for this corrective action (Reference c).

PD$Ajf00K05000317 5 900105

$0I Q

r PDC I

t

a:

Document Control Desk January 5,1990 Page 2 Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, i

/- -

GCC/GLB/db cc:

D. A. Brune Esquire J. E.

Silberg, Esquire R: A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC J. E. Beall, NRC T. Magette, DNR ~

1 i

1 l