Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E048 + (ML20005E048)
- ML20005E049 + (ML20005E049)
- ML20005E051 + (ML20005E051)
- ML20005E053 + (ML20005E053)
- ML20005E055 + (ML20005E055)
- ML20005E056 + (ML20005E056)
- ML20005E057 + (ML20005E057)
- ML20005E058 + (ML20005E058)
- ML20005E060 + (ML20005E060)
- ML20005E062 + (ML20005E062)
- ML20005E064 + (ML20005E064)
- ML20005E065 + (ML20005E065)
- ML20005E066 + (ML20005E066)
- ML20005E067 + (ML20005E067)
- ML20005E068 + (ML20005E068)
- IR 05000354/1989021 + (ML20005E070)
- ML20005E071 + (ML20005E071)
- ML20005E072 + (ML20005E072)
- ML20005E074 + (ML20005E074)
- IR 05000219/1989027 + (ML20005E075)
- PNO-III-89-088, on 891221,determined That Licensee Shipped Methyl Bromide Tagged w/NRC-licensed Matl W/Documents Identifying Matl as Glucose Containing C-14.Confirmatory Action Ltr Issued to Licensee + (ML20005E077)
- ML20005E079 + (ML20005E079)
- 05000327/LER-1989-032, :on 891205,RHR Pumps Determined to Have Deadheading Problem,Per NRC Bulletin 88-004,resulting in Plant Operation Outside Design Basis.On 891128,RHR Pump Exceeded Head Criteria.Pumps Started + (ML20005E080)
- U-601577, Special Rept:On 891120,Div 1 Diesel Generator 1A Failed During Surveillance Testing.Caused by Erratic Start Times. Diesel Generator Governors Readjusted + (ML20005E081)
- 05000440/LER-1989-030, :on 891125,plant Entered Tech Spec 3.0.3 Due to Two Untrippable Control Rods.Caused by Failure to Return Scram Pilot Valves Used for Rods to Mfg After Recall. Surveillance Instruction Revised + (ML20005E082)
- 05000327/LER-1989-032-01, :on 891201,discovered That Tech Spec Surveillance Requirement to Verify That Valves 1-67-748 & 2-67-748 in Open Position Not Met.Caused by Personnel Error.Correct Valve Position Verified + (ML20005E083)
- ML20005E084 + (ML20005E084)
- ML20005E086 + (ML20005E086)
- IR 05000029/1989022 + (ML20005E088)
- U-601576, Advises That Revised Fitness for Duty Program Will Meet 10CFR26 Requirements,Effective 900103.Util Intends to Test for Substances Listed at Indicated cut-off Levels + (ML20005E089)
- ML20005E090 + (ML20005E090)
- PNO-III-89-089, on 891226,while Operating at 100% Power, Reactor Automatically Shut Down as Result of Negative Flux Rate.Caused by Reactor Protection Motor Generator Output Breakers Opening.Power Restored to Reactor Coolant Pump + (ML20005E093)
- ML20005E094 + (ML20005E094)
- 05000352/LER-1989-058, :on 891123,actuation of Group III Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Automatic Isolation of Rwcu.Caused by Failure of Flow Summer Card.Card Replaced + (ML20005E096)
- ML20005E098 + (ML20005E098)
- ML20005E099 + (ML20005E099)
- ML20005E101 + (ML20005E101)
- ML20005E102 + (ML20005E102)
- ML20005E103 + (ML20005E103)
- ML20005E105 + (ML20005E105)
- ML20005E106 + (ML20005E106)
- IR 05000295/1989034 + (ML20005E109)
- 05000327/LER-1989-030, :on 891204,fire Suppression Sys Deluge Valve Isolated More than 1 H W/O Required Continuous Fire Watch Establishment.Caused by Personal Communication Breakdown. Valve Opened & Foreman in Charge Counseled + (ML20005E116)
- ML20005E117 + (ML20005E117)
- ML20005E121 + (ML20005E121)
- PNO-III-89-087, on 891221,reactor Automatically Shut Down as Result of Negative Flux Rate,Causing Loss of Power to Reactor Coolant & Main Condenser Circulation Pumps.Forced Recirculation Restored & Inspector Sent to Plant + (ML20005E122)
- ML20005E123 + (ML20005E123)
- ML20005E124 + (ML20005E124)
- IR 05000483/1989019 + (ML20005E126)
- ML20005E128 + (ML20005E128)
- ML20005E129 + (ML20005E129)