Forwards Exam Rept 50-029/89-22OL Administered During 891128-1201.Three Individuals Administered Requalification Exams as Result of Failure to Pass Portions of Exam Previously Administered in June 1989
ML20005E086
Person / Time
Site: Yankee Rowe
Issue date: 12/27/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20005E087 List:
References
NUDOCS 9001030233
Download: ML20005E086 (2)


See also: IR 05000029/1989022

Text

{{#Wiki_filter:r. - Y , . ~~ ,. s , , i f DEC 271989 Docket No. 50-29

t Yankee Atomic Electric Company L ATTN: Mr. Bruce L. Drawbridge , Vice President and Manager t- ! of Operations 580 Bolton Street

Bolton, Massachusetts 01740-1398 , Gentlemen: SUBJECT: EXAMINATION REPORT NO. 50-29/E9-22 (OL) i On November 28, 1989, through December 1, 1989, the NRC administered examina- tions to two employees of your company who had applied for licenses to operate , your Yankee Nuclear Power Station in Rowe, Massachusetts. Also, three indi- ' viduals were administered requalification examinations as a result of their having failed various portions of the requalification examination previously . administered during the month of June, 1989. At the conclusion of the exami- nation, the results of the requalification examinations and preliminary find- ings of the replacement examinations were discussed with those members of your . staff identified in the enclosed report. Details of the examinations are " described in the NRC Region I Examination Report which is enclosed with this letter, , in t.ccordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter tr.d its enclosure will be placed in the NRC Public Documert Room. Should you have any questions regarding this examination, please contact us. l Sincerely, Original Signed By: Robert M, Gallo, Chief Operations Branch Division of Reactor Safety Enclosure: Examination Report No. 50-029/89-22 (OL) w/ Attachments 1, 2, & 3 cc w/ enclosure and Attachments 1, 2, and 3: Dr. Andrew C. Kadak, President & Chief Operating Officer N. St. Laurent, Plant Superintendent i G. J. Papanic, Jr., Senior Project Engineer - Licensing C. Russell Clark, Training Manager y,{foggg{{ h,N) f{ E& "

p - ) r 4 i . . , io ! Yankee Atomic Electric Co. 2 cc w/ enclosure and Attachments 1, 2, and 3 (Cont'd): H. Eichenholz, Senior Resident Inspector Public Document Room (PDR)

Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) , Commonwealth of Massachusetts , State of Vermont i cc w/ enclosure w/o Attachments 1, 2, & 3: P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts C. Sterzinger, Commissioner, Vermont Department of Public Service bec w/ enclosure and Attachments 1, 2, & 3: . Master Exam File ' bec w/ enclosure w/o Attachments 1, 2, & 3: Region I Docket Room (with concurrences) Chief, OLB, DLPQE, NRR M. Perkins, Management Assistant, DRMA (w/o enc 1) G. Grant, SRI - Vermont Yankee R. Bores, Techincal Assistant, DRSS M. Fairtile, PM, NRR R. Dic, ugh, DRP P. Bissett, DRS OL File DRS Files (3) N DRS:RI D :RI Bissett/ajkn E G 12/SI/89 17 1 1 89 0FFICIAL RECORD COPY BISSETT/Y.A. 89-22/12/18/89 - j 12/18/89 i f / , }}