ML20005E065
| ML20005E065 | |
| Person / Time | |
|---|---|
| Site: | North Carolina State University |
| Issue date: | 12/21/1989 |
| From: | Weiss S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20005E061 | List: |
| References | |
| R-120-A-010, R-120-A-10, NUDOCS 9001030194 | |
| Download: ML20005E065 (4) | |
Text
'
~%,
UNITED STATES NUCLEAR REGULATORY COMMISSION e
l nAsHINGTON, D, C,70666 9
NORTH CAROLINA STATE UNIVERSITY DOCKET NO. 50-297 AMENDMENT TO FACILITY LICE *lSE j
Amendment No. 10 License No. R-120 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to Facility License No. R-120 filed i
by Worth Carolina State University (the licensee), dated November 10, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations as set forth in 10 CFR Chapter I; B.
The facility will o)erate in conformity with the ap)11 cation, the provisions of tie Act, and the regulations of tie Comission; C.
There is reasonable assurance:
(1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the hecith and safety of the public; E.
The issuance of this amencment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied; and F.
Priornoticeofthisamendmentwasnotrequiredby10CFR62.105(a)(4) and publication of notice of this amendment is not required by 10CFR62.106(a)(2).
I C r
J
e,
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of License No. R-120 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Anendment No. 10, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOP,THE NUCLEAR REGULATORY COMMISSION W
YC a
Seymour H. Weiss, Director i
Non-Power Reactor Decomissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Appendix A Technical Specifications Changes Date of Issuance:
December 21, 1989 a
--e--
e-ENCLOSURE TO LICENSE AMENDPENT NO. 10 TO FACILITY LICENSE NO. R-120 DOCKET NO. 50-297 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised sage is identified by amendment number and contains a vertical line indicating tie area of change.
Remove Insert 40 40 l
l i
{
l
f i.
i i
6.2.3 The Radiation Protection Council shall have at least five i
members, of whom no more than the minority shall be from 1
the line organization shown in Pigure 6.1-1.
in addition to the Radiation Protection Council, a minimum of three l
persons are appointed by the Chancellor, upon the recom-mendation of the RPC, to fom a Reactor Safeguards Advisory Group (RSAG). This group serves as a permanent comittee to the RPC and will be solely responsible for independent appraisals of reactor operations, and reporting the results of its investigations to the RPC, Department Head, and Associate Director. The RPC and RSAG shall be made up of senior faculty and staff who shall collectively provide experience in reactor engineering, reactor operatior.s, chemistry and radiochemistry, instruinentation and control systems, radiological safety and mechanical and electrical systems. ThecampusRadiologicalSafetyOfficer(R50) i shall be a permanent member of the RPC.
6.2.4 The Radiation Protection Council shall have written state-ments on its responsibilities and authority.
6.2.5 Minutes of each RPC meeting shall be distributed to the Chancellor and all RPC members. Minutes of each RSAG meet-ing shall be distributed to the RPC; Head, Department of Nuclear Engineering; and Associate Director.
6.2.6 A quorum shall consist of not less than a majority of the full RPC or RSAG, and shall include the chairman or his designated alternate. Only a minority or less of the line organization shown in Figure 6.1-1 shall be present in any quorum.
6.2.7 The RPC shall meet at least every four calendar months, and upon call of the Chairman; while the RSAG shall meet at least every six calendar months and upon call of the Chaiman.
Amendment No. 10
.