Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19332E523 + (ML19332E523)
- ML19332E525 + (ML19332E525)
- ML19332E526 + (ML19332E526)
- ML19332E527 + (ML19332E527)
- BVY-89-109, Requests Removal of Change B to Proposed Change 148 Re Rev to Pages 5b & 6a Correcting Administrative Error in Tech Spec 2.1 + (ML19332E528)
- ML19332E532 + (ML19332E532)
- ML19332E535 + (ML19332E535)
- ML19332E537 + (ML19332E537)
- ML19332E538 + (ML19332E538)
- ML19332E540 + (ML19332E540)
- ML19332E542 + (ML19332E542)
- ML19332E544 + (ML19332E544)
- IR 05000312/1989020 + (ML19332E545)
- ML19332E546 + (ML19332E546)
- L-89-400, Forwards Rev 24 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3) & 73.21) + (ML19332E547)
- ML19332E549 + (ML19332E549)
- L-89-402, Forwards Rev 6 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR2.790(a)(3) & 73.21) + (ML19332E550)
- ML19332E551 + (ML19332E551)
- ML19332E552 + (ML19332E552)
- ML19332E553 + (ML19332E553)
- ML19332E555 + (ML19332E555)
- ML19332E556 + (ML19332E556)
- ML19332E557 + (ML19332E557)
- ML19332E558 + (ML19332E558)
- ML19332E560 + (ML19332E560)
- ML19332E561 + (ML19332E561)
- ML19332E562 + (ML19332E562)
- ML19332E563 + (ML19332E563)
- ML19332E566 + (ML19332E566)
- ML19332E567 + (ML19332E567)
- ML19332E568 + (ML19332E568)
- ML19332E570 + (ML19332E570)
- PNO-I-89-094, on 891128,licensee Made Containment Entry to Investigate Sources of Unidentified RCS Leakage Which Was at About 0.5 Gpm.Licensee Insp Identified Leakage from Lower Setpoint Adjustment Screw on Pressurizer Code Safety Valve + (ML19332E572)
- ML19332E573 + (ML19332E573)
- ML19332E576 + (ML19332E576)
- ML19332E580 + (ML19332E580)
- 0CAN118910, Submits Followup Response to Weaknesses Noted in Insp Repts 50-313/89-12 & 50-368/89-12 Re 1989 Radiological Emergency Preparedness Exercise.Corrective Actions:New Command & Control Methodology Developed by State of Ak + (ML19332E581)
- ML19332E582 + (ML19332E582)
- ML19332E584 + (ML19332E584)
- ML19332E586 + (ML19332E586)
- IR 05000423/1989017 + (ML19332E587)
- IR 05000344/1989026 + (ML19332E588)
- ML19332E589 + (ML19332E589)
- IR 05000271/1989020 + (ML19332E591)
- 1CAN118903, Responds to NRC Bulletins 79-02, Anchor Bolts & Baseplates & 79-14, Piping Analysis Consistency W/Plant Configuration & Insp Rept 50-313/89-200.Util Actively Pursuing Issues Raised During Insp.Initial 79-14 Response Already Adequate + (ML19332E596)
- ML19332E598 + (ML19332E598)
- ML19332E599 + (ML19332E599)
- IR 05000206/1989029 + (ML19332E601)
- BSEP-89-1060, Special Rept 2-SR-89-005:on 891106 & 08,specified 7-day Time Frame for Fire Barrier Limiting Condition for Operation Exceeded for Fire Doors 112 & 004,respectively.Caused by Doors Not Being Repaired in Required Time + (ML19332E603)
- ML19332E606 + (ML19332E606)
- 0CAN128901, Responds to Violations Noted in Insp Repts 50-313/89-42 & 50-368/89-42.Corrective Actions:On 891020,21 & 22,training Conducted to Emphasize Requirements of Weld Procedure Spec Must Be Followed + (ML19332E608)