a
, = '
]
'
r
%.
!
~.,'g.
.,I
- ,
URNTED STATES
l
d'
NUCLEAR REGULATORY COMMISSION
o
)]'
neeNw y
g
.%
1460 MARIA LANE, SUITE 210
- % * *. * /
'
WALNUT CREEK, CALIFORNIA 94996
NOV 211913
.
,
.
.
Docket No. 50-344
Portland General Electric Company
l
121 S. W. Salmon Street. TB-17
.
Portland, Oregon 97204
Attention: Mr. David Cockfield
Vice President, Nuclear
i
Gentlemen:
l
SUBJECT: NRC INSPECTION OF THE TROJAN NUCLEAR PLANT
.
This letter refers to the routine inspection by Messrs. J. Burdoin and F. Gee
of this office on October 16-20, 1989, and additional document review in
i
the regional _ office during the week ending October 28, 1989, of activities
authorized by NRC License No. NPF-1. Findings were discussed with members of
'
your staff at the' conclusion of the inspection.
!
.
-
Areas examined during this inspection are described in the enclosed inspection
!
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
,
personnel, and observations by the inspectors.
!
i
Based on the results of this inspection, it appears that two of your
.
activities were not conducted in full compliance with NRC requirements, as
.
set forth in the Notice of Violation, enclosed herewith as Appendix A.
!
This inspection identified a number of deficiencies.
In porticular, the
!
'following problems were noted in conjunction with review of engineering
calculations and emergency procedures associated with a loss of power to
the Service Water System during a fire:
j
'~
l
(1)- An important calculation assumption was based on inaccurate data.
(2) An independent licensee review of the calculation had raised questions
,
L
about the adequacy of the applicable emergency response procedure
which were not properly addressed.
- .
1
(3) The applicable emergency response procedure was found to be deficient
'
in that it did not provide sufficient detail to enable plant operators
to perform the required actions.
,
The above noted deficiencies are indicative of weaknesses in the quality of
I
.
technical work being performed by PGE.
You should ensure that these
-
deficiencies are not programmatic in nature and take appropriate steps to
avoid similar deficiencies in other procedures and calculations.
l
l
8912070410
it
hDR
ADOCK 05spbohh44
l'
I
l
.
- -
.-
.
-
. -
.
-
-
-
,m-
3
..
l
T.?j
.
.
~
L *.
NOV 111989
-
i
2
)
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosuie
l
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
'
to discuss them with you.
,
,
Sincerely,
!
I
-
CL
q
i
D. F. Kirsch, Chief
-
eactor Safety Branch
Enclosure: .
50-344/89-26
-
-
1.
Inspection Report Nos.
'
y
2.
Appendix A - Notice of Violation
'
cc w/ enclosures:
T. D. Walt, General Manager, Technical Functions
C. P. Yundt, General Manager
-
~'
L. A. Girard, Vice President and General Counsel
D. Stewart-Smith, Administrator, Siting and Regulations DO
I
l
'
.
.
.
,
i
l
l'
l
Ei
1
- . , .
- . , . . . .
_ - . . , . . . . - - .
. . .
. ~ . . . _ . _ , , , _
.
. -
.
.
-
.
p
--.
,
. -
'
'-
%'
,
,
k! '
NOV 211989
,
3-
- a
'
.
.
bec w/ enclosures:
g-
Docket File
Project. Inspector
' Resident Inspector
,
G. Cook
l.
B. Faulkenberry
J. Martin
F
A. Johnson
R. Nease, NRR'
'
N. Western
,bec w/o enclosure I:
- c
M. Smith-
J. Zo111 coffer
,I
'
k'l
.,
t
-
-
[_
A
REGION V
j
JBurdoin
an FGee h
A ohnson
uey
FKirsch
~#
// /f//
[) N /89
' /xf89
l' /7.i/89
4/rl/89
C'If
0
i.
N
N
-
v
v
.
t/
SEND TO PDR J
/ NO
-]
..
E
s
8
s_