I YANKEE ATOMIC ELECTRIC COMPANY 1
- r. ion n <<,s><2<.sre, o
.~
y-Star Route, Rowo. Massachusetts 01367
_7 YAme w
3 t-h October 27. 1989 l.
TR 89-422.5.2 l
BYR 89-155-L
-United States Nuclear Regulatory Commission Realon 1 475 Allendale Road
[
King of Prussia. Pennsylvania 19406
~
y
' Attention:
Mr.-Robert M. Gallo. Chief n
Operations Branch L.
Division of Reactor Safety References (a) License No. DPR-3 (Docket No. 50-29)
E i,
(b) USNRC Letter to YAEC dated August 23. 1989.
L Requalification Examination Report No.
50-029/89-03(OL-RQ)
Dear Sir:
p Reference (b) documents the results of the NRC requalification examinations administered on June 20-30. 1989. The report identified a W
concern pertaining to the potential correlation of failures with the position of~ Shift Supervisor. The following provides our assessment and response to this concern.
Our assessment encompassed the personnel, procedures, training. and all aspects of the evaluation process in search of attributes which might
(
identify generic weaknesses in our program. Three areas for improvement L'
were identified and further analyzed to determine if they represented knowledge'or administrativo deficiencies. All tb-e were administrative.
l-The_first area for improvement procedural adequacy. had previously been identified and was'(is) being actively pursued. With the advent of new Emergency Operating Procedures (EOPs). which are written in a very comprehensive style. it became apparent that the normal operating l
procedures have relied too heavily on operator knowledge.
As indicated in the examination report. Yankee has established an Operations Support Group specifically designed to revise and maintain the normal operating procedures in a comprehensive and integrated form.
A second area for itnprovement. examination skills, emerged from our study of potential time-dependent training factors.
Recently licensed personnel generally displayed better examination taking skills than the 8912070408 891121
{DR ADOCK 05000029 PDC
y.
g 4
United States Nuclear Regulatory Commission October 27. 1989 L
" older" licencees.
Even though they understand the accuracy and fairness of the'new. more specific examination format. the older licensees still tend to revert to an earlier. more general style of answering questions.
This reflects their previous examination successes. which were based on broad spectrum knowledge, but detracts from their ability to demonstrate specific knowledge.
The third area for improvement procedure familiarity, is also a time
{;
dependent training factor. Recently licensed operators retain a strong.
'L tactile sense of procedures familiarity which stems from on-the-job pe rf ormance. With time and advancement.-however. the senior licensee's o
familiarity natures to the more conceptual perspective of a supervisory role. When combined with the examination skills described above. this conceptual perspective serves to make the Job Performance Measures (JPM) demonstrations a particular challenge for the older operators.
Corrective actions to improve the second and third areas have been incorporated into the training programs. Presentation format in the requalification programs has been modified from a systems basis to a situational basis. While not altering our systematic approach to training.
this technique is more in line with the present evaluation process, uses higher order _ learning objectives and results in greater familiarization with operating procedures.
In addition, the number of walkthrough (JPM) examinations which focus on procedure familiarity-and provide immediate remediation, will be significantly increased.
To address the'immediate and specific needs of the three Shift
' Supervisors in question. each case was analyzed and a specific corrective action plan developed.
Each plan included both short term and long term remedial training and re evaluations. After completing their respective short term curricula, each Shif t Supervisor was successfully re evaluated and returned to normal duties.
Each is currently engaged in a long term program to monitor the continued success of these plans.
We trust you will find this submittal satisfactory however. should you desire additional information, please contact us.
Very truly yours.
YANKEE ATOMIC ELECTRIC COMPANY f ${
twe N. N. St Laurent Acting Manager of Operations ces (3) NSARC Chairman (YAEC) l' (1) Document Control Desk (1) Resident Inspector I