IR 05000312/1989020
| ML19332E545 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 12/01/1989 |
| From: | Norderhaug L, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19332E543 | List: |
| References | |
| 50-312-89-20, NUDOCS 8912070352 | |
| Download: ML19332E545 (1) | |
Text
.
-
.,.-.
.
-
.
g
-
.f
...
w.
.
.
.
The information on this page is considered to be appropriate for public
'
disclosure pursuant to 10 CFR 2.790
U. S.. NUCLEAR REGULATORY COMISSION
!
REGION V
~
a Report No.
50-312/89-20 (IE-V-904)
,
Docket No.
50-312 License No.
,
L Licensee:
SacramentoMunicipalUtilityDistrict(SMUD)
F Rancho Seco Nuclear Generating Station l
14440 Twin Cities Road Herald, California 95638-9799 Facility Name:
Rancho Seco Nuclear Generating Station
-
('
.
Inspected at:
Clay Station, California Inspection Conducted'
vember 6 - 24, 198 N,
/9-///M Inspector:
=
E. R..No erht
,3 jorMattQglControlAnalyst Date Signed
'
I a.// / P)
Approved By:
-
~ N. D. '5cKgte% CMef, Safegua section Date 51gn'ed
Inspection Summary:
Areas Inspected: This routine, unannounced inspection by region-based
'
inspection staff, examined the following portions of the licensee's physical security program:. Physical Security Program for Power Reactors (CORE Inspection Program) and Followup.
During this inspection, portions-of
. Inspection Procedures 30703, 81700, 92700 and 92701 were used.
This inspection was begun during regular hours.
Results:
In the areas inspected, the licensee's security programs appeared adeguateto.accomplishtheirsecurityobjectives. The licensee was found to be in compliance with NRC requirements w: thin the areas examined during this inspection.
A weaknesses was identified in the area of compensatory measures fjr.l.ighting deficiencies (Seeparagraph2.j(2)ofthereportdetails).
8912070352 891201 PDR ADOCK 050003121 o
Poc T awcuma cowrnws urow sSr Es SAFEGU ARDS INFORMATION
I
' PAoE I S Decoh'TRDILD.
~, -
-,. -.. _ -. _. _, _ _ _.