Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323F226 + (ML19323F226)
- ML19323F227 + (ML19323F227)
- 05000259/LER-1980-039, Forwards LER 80-039/01T-0 + (ML19323F228)
- ML19323F229 + (ML19323F229)
- 05000254/LER-1980-010, Forwards LER 80-010/03L-0 + (ML19323F230)
- ML19323F231 + (ML19323F231)
- ML19323F232 + (ML19323F232)
- 05000259/LER-1980-039-01, /01T-0:on 800507,util Notified by GE That Qualification of Containment Atmospheric Monitoring Sys Hydrogen Sensors Has Not Been Demonstrated to Meet Purchase Specs.Operating Procedures & Instructions Changed + (ML19323F236)
- 05000366/LER-1980-074-03, /03L-0:on 800427,core Max Fraction of Limiting Power Density Found in Excess of Tech Spec.Cause Not Stated. Average Power Range Monitor Adjusted,Power Reduced & Process Computer Updated,Run & Verified + (ML19323F237)
- 05000254/LER-1980-010-03, /03L-0:on 800423,while Performing Loss of Electrohydraulic Control Fluid Pressure Scram Surveillance, Pressure Switch 1-5600-PS-3 Tripped Below Tech Spec Limit. Caused by Instrument Setpoint Drift.Switch Adjusted + (ML19323F238)
- ML19323F239 + (ML19323F239)
- ML19323F240 + (ML19323F240)
- ML19323F242 + (ML19323F242)
- 05000259/LER-1980-035, Forwards LER 80-035/03L-0 + (ML19323F246)
- ML19323F247 + (ML19323F247)
- A00803, Application to Amend License DPR-65,submitted as Proposed Revision to Tech Specs,In Response to NRC . Summarizes Status of Implementation of Automatic Initiation of Auxiliary Feedwater.One Pump Sufficient + (ML19323F248)
- ML19323F249 + (ML19323F249)
- ML19323F250 + (ML19323F250)
- ML19323F251 + (ML19323F251)
- 05000259/LER-1980-035-03, /03L-0:on 800424,during Steady State Conditions, 1B Recirculation Pump Removed from Svc Due to Low Oil Level Alarm on Motor Upper Bearing.Caused by Shorted Wires.Wires Reinsulated & Motor Returned to Svc + (ML19323F252)
- ML19323F254 + (ML19323F254)
- ML19323F255 + (ML19323F255)
- ML19323F257 + (ML19323F257)
- AECM-80-101, Forwards Interim Deficiency Rept Re Damage to Intermediate Metallic Conduit from Adjustable Threading Dies + (ML19323F258)
- ML19323F259 + (ML19323F259)
- ML19323F260 + (ML19323F260)
- ML19323F261 + (ML19323F261)
- ML19323F263 + (ML19323F263)
- 05000324/LER-1978-058, Suppl to LER 78-058/03L-1:on 780630,while Performing Penetrant Test 2.1.26PC,I&C Technician Found Pressure Switch B21-PS-N015B Out of Calibr.Caused by Instrument Drift.Switch Recalibr.During Future Outage,Switch Will Be Replace + (ML19323F265)
- ML19323F267 + (ML19323F267)
- 05000265/LER-1980-011, Forwards LER 80-011/03L-0 + (ML19323F268)
- ML19323F269 + (ML19323F269)
- ML19323F271 + (ML19323F271)
- ML19323F272 + (ML19323F272)
- ML19323F273 + (ML19323F273)
- ML19323F274 + (ML19323F274)
- 05000265/LER-1980-011-03, /03L-0:on 800420,while Performing Manual Operation of Relief Valves,Valve 2-203-3C Failed to Open.Caused by Component Failure Due to Excessive Solenoid Plunger to Pilot Valve Stem Clearance + (ML19323F275)
- ML19323F276 + (ML19323F276)
- ML19323F277 + (ML19323F277)
- ML19323F278 + (ML19323F278)
- ML19323F280 + (ML19323F280)
- ML19323F281 + (ML19323F281)
- ML19323F282 + (ML19323F282)
- ML19323F283 + (ML19323F283)
- 05000313/LER-1979-016, Forwards Updated LER 79-016/03X-1 + (ML19323F285)
- ML19323F286 + (ML19323F286)
- ML19323F287 + (ML19323F287)
- ML19323F288 + (ML19323F288)
- ML19323F290 + (ML19323F290)
- ML19323F293 + (ML19323F293)
- 05000338/LER-1980-042, Forwards LER 80-042/01T-0 + (ML19323F294)