ML19323F280

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 79-062/03L-1
Date released: 12/03/2019 Download: ML19323F280


Updated LER 79-062/03L-1:on 790726,while Performing Penetrant Test,Reactor Low Level 2 & 3 Calibr & Functional Test,Instruments 2B21-LIS-NO31 C & D Were Out of Calibr. Caused by Instrument Drift.Switches Recalibr
ML19323F284
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F284 (2)
Forwards Updated LER 79-062/03L-1
ML19323F279
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F279 (1)