ML19323F257

From kanterella
Jump to navigation Jump to search
Forwards Suppl to LER 78-058/03L-1
Date released: 12/03/2019 Download: ML19323F257


Suppl to LER 78-058/03L-1:on 780630,while Performing Penetrant Test 2.1.26PC,I&C Technician Found Pressure Switch B21-PS-N015B Out of Calibr.Caused by Instrument Drift.Switch Recalibr.During Future Outage,Switch Will Be Replaced
ML19323F265
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F265 (2)
Forwards Suppl to LER 78-058/03L-1
ML19323F256
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F256 (1)