ML19323F271

From kanterella
Jump to navigation Jump to search
Application to Amend Ol.Proposed Revisions to Pages 234f,234n,234o,243 & 244.Certificate of Svc Encl
ML19323F271
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/23/1980
From: Bauer E, Bradley E, Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19323F261 List:
References
NUDOCS 8005280715
Download: ML19323F271 (6)


Text

_ _ _ _ __ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _

.. ..o ,

O BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPHIA ELECTRIC COMPANY  : 50-278 APPLICATION FOR M4ENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Ed'vard G. Bauer, Jr.

Eugene J. Bradley 2301 Market Street Philadelphia, Pennsylvania 19101 Attorneys for Philadelphia Electric Company go5280 7 I

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPHIA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 S DPR-56

?

Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Units 2 and 3, hereby requests that the Technical Specifications contained in Appendix A of the Operating Licenses be amended by revising certain sections as indicated by a vertical bar in the margin of attached pages 234f, 234n, 234o, and 243, and by the addition of revised Figure 6.2-1 on page 244.

The proposed modification of the Management Organization Chart (Figure 6.2-1) reflects changes designed to provide for more effective control of company operating activities at the

i. .

cxecutive levels of management. The reorganization assigns the responsibility of Chief Operating Officer to tne Executive Vice President. The Office of Vice President - Electric Production Department reports directly to the Chief Operating Officer.

Additionally, Philadelphia Electric Company requests procedural changes to section 6.2.1 (page 243) that would streamline the administrative process required for future revisions to the Management Organization Chart presented in the Technical Specifications.

During the refueling outage on Unit 2, scneduled for Spring 1980, vacuum breakers will be installed on the main steam safety relief valve discharge pipes as one part of the modifications to reduce dynamic loads on the suppression chamber. This

modification requires the removal of three hydraulic snubber pipe supports ( 1-GG- S- 7 0, 1-GG-S-71, 1--GG-S-73) to provide sufficient-clearance for the installation of vacuum breakers. An additional twenty-two (22) mechanical snubbers will be installed to maintain the seismic class I design feature of the modified safety relief valve discharge pipes. Philadelphia Electric Comparty therefore requests a revision to Table 3.11.D.1 (Page 234f, 234n, 2340) of the Technical Specifications so as to reflect hydraulic snubber changes resulting from the above described modifi v tion.

Pursuant to 10 CFR 170.22 " Schedule of Fees for Facility l

License Ametament", Philadelphia Electric Company proposes that this Application for Amendment be considered a Class II Amendment for Unit 2 and a Class I Amendment for Unit 3, since the proposed changes are deemed to be administrative in nature.

I.

l I

The Plant Operation Review Committee and tne Operation and Safety Review Committee have reviewed these proposed changes to t.ie Technical Specification and have concluded that they do not

j. involve an unreviewed safety question or a significant hazards consideration and will not endanger tne health and safety of the

]

i public.

Respectfully submitted, PHILADELPHIA ELECTRIC COMPANY By e.s / /

Vice'PresidenyJ t

4 l

i COMMONWEALTH OF PENNSYLVANIA

as.

COUNTY OF PHILADELPHIA  :

S. L. Daltroff, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric company, the Applicant herein; that he has read the foregoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

) .

g.

-[\ M //

Subscribed and sworn to before me this M " day ot t'i" i E0 y

)n . t , ] / U . A , s i, , ,'

j gNotary Public l nmry eawc. rewe:pha. rmudelpha a l 14 ccm-issen Dprn M/ 23. Wi

( ,

v .' .

4 CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. No. 1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lan_ aster County, Pennsylvania, by mailin<J a copy thereof, via first-class mail, to George K.

brinton, Chairman of the Board of Supervisors, Pet.ch Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereot, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R. D. No. 1, Holtwood, Pennsylvania 17532; all this 23rd day of May, 1980.

/*

' gene p. Bradley y Attorney for Philadelphia Electric Company