Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000133/1979004 + (ML19290D039)
- ML19290D040 + (ML19290D040)
- ML19290D041 + (ML19290D041)
- IR 05000344/1979024 + (ML19290D044)
- ML19290D045 + (ML19290D045)
- ML19290D046 + (ML19290D046)
- ML19290D047 + (ML19290D047)
- ML19290D048 + (ML19290D048)
- ML19290D049 + (ML19290D049)
- ML19290D050 + (ML19290D050)
- ML19290D051 + (ML19290D051)
- PNO-I-80-006, on 800114,Gateway Transport Truck Containing Radioactive Cobalt Was Involved in Accident on Interstate 80.Insp of Container Revealed No Radioactive Leakage + (ML19290D052)
- PNO-I-80-006A, on 800114,radioactive Matl Damaged in Truck Accident Was Inspected by Commonwealth of PA Representative & Found to Be Intact + (ML19290D053)
- PNO-I-80-005, on 800111,truck Carrying Two 5-gallon Containers & Seven 55-gallon Drums of Radwaste Was Involved in Accident on Route 9 in Montrose,Ny.No Leakage Occurred + (ML19290D054)
- ML19290D058 + (ML19290D058)
- ML19290D067 + (ML19290D067)
- ML19290D072 + (ML19290D072)
- ML19290D116 + (ML19290D116)
- ML19290D132 + (ML19290D132)
- ML19290D172 + (ML19290D172)
- ML19290D173 + (ML19290D173)
- ML19290D176 + (ML19290D176)
- ML19290D201 + (ML19290D201)
- ML19290D204 + (ML19290D204)
- ML19290D206 + (ML19290D206)
- ML19290D207 + (ML19290D207)
- ML19290D208 + (ML19290D208)
- ML19290D210 + (ML19290D210)
- ML19290D214 + (ML19290D214)
- ML19290D218 + (ML19290D218)
- ML19290D220 + (ML19290D220)
- ML19290D223 + (ML19290D223)
- ML19290D252 + (ML19290D252)
- PNO-IV-80-003, on 800108,leak on Ib Helium Circulator Static Seal Actuated Mechanism Caused Continuous bleed-off of Seal Pressurization Sys.Replacement of Ib Circulator Will Result in 60-day Outage + (ML19290D275)
- PNO-III-80-028, on 800205,chief Boiler Inspector for State of in Informed Region That ASME Survey Team Found Serious Discrepancies in Code Conformance of Stewart Mechanical Co Component Fabricator.Region 3 Will Inspect + (ML19290D276)
- PNO-III-80-010, on 800111,review of Test Data Confirmed Lockup Rate for Steam Generator Snubbers to Be 0.12 to 0.19 Inches Per Minute for Limiting Case Loca.Design Lockup Rates Being Analyzed + (ML19290D277)
- ML19290D278 + (ML19290D278)
- ML19290D279 + (ML19290D279)
- ML19290D280 + (ML19290D280)
- ML19290D281 + (ML19290D281)
- PNO-V-80-002, on 800111,detected Unidentified Reactor Coolant Leakage.Shutdown Initiated Which Caused Loss of Flow to Seals on Reactor Coolant Pump C,Resulting in Postponement of Refueling Outage Completion Until 800303 + (ML19290D284)
- PNO-I-79-038, on 791217,new Unirradiated Fuel Assembly Dropped While Being Transferred to Storage Location in Spent Fuel Pool.Caused by Assembly Bouncing Off Top Edge of Fuel Rack & Failure to Latch Device on Auxiliary Hook + (ML19290D300)
- ML19290D311 + (ML19290D311)
- ML19290D315 + (ML19290D315)
- ML19290D316 + (ML19290D316)
- ML19290D319 + (ML19290D319)
- ML19290D320 + (ML19290D320)
- ML19290D337 + (ML19290D337)
- PNO-II-79-045, on 791221,insp of Two Drywell Equipment Access Hatches Revealed Improper Alignment in Closing Dogs & One Closing Bolt Hot Torqued.Tva Informed of Actions to Be Taken.Action Completed by 791222 + (ML19290D340)
- ML19290D350 + (ML19290D350)
- ML19290D352 + (ML19290D352)