Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000309/LER-1979-020-03, /03L-0:on 790910,routine Review for Discharges Made 790910-16 Indicated Waste Liquid Radiation Monitor Did Not Respond as Expected for Releases.Caused by Waste Liquid Radiation Monitor Being Out of Calibr + (ML19253B388)
- ML19253B390 + (ML19253B390)
- ML19253B391 + (ML19253B391)
- ML19253B392 + (ML19253B392)
- ML19253B393 + (ML19253B393)
- 05000313/LER-1979-017, Forwards LER 79-017/03L-0 & Updates to 78-005/01X-1 & 78-006/01X-1 + (ML19253B394)
- ML19253B395 + (ML19253B395)
- ML19253B396 + (ML19253B396)
- ML19253B397 + (ML19253B397)
- 05000313/LER-1979-017-03, /03L-0:on 790911,during Monthly Surveillance Operational Test,Diesel Generator 1 Tripped on Low Oil Pressure.Caused by Lube Oil Cooler Leak Allowing Water to Enter Oil Sys.Cooler Replaced + (ML19253B399)
- AECM-79-112, Interim Deficiency Rept Re Possible Failure of William Powell Co Supplied Valves to Meet Seismic Requirements.Data Still Being Gathered to Determine Natural Frequencies of Valves W/Extended Topworks.Final Rept by 791230 + (ML19253B400)
- ML19253B401 + (ML19253B401)
- 05000155/LER-1979-023, Forwards LER 79-023/03L-0 + (ML19253B403)
- 05000313/LER-1978-005, Update to LER 78-005/01x-1:on 780302,during Inservice Insp of Tubing,Five Tubes Exceeded Plugging Limit of 40% of Nominal Tube Wall Thickness.Caused by Oxiding Aqueous Corrosion Mechanism.Defective Tubes Plugged + (ML19253B405)
- ML19253B406 + (ML19253B406)
- ML19253B407 + (ML19253B407)
- ML19253B408 + (ML19253B408)
- 05000155/LER-1979-023-03, /03L-0:on 790911,automatic Isolation Valve CV/4027 Exhibited Leakage in Excess of Tech Spec Limit.Caused by Disc Contact Area on Seating Surface Not Providing Tight Shutoff Capability.Seat Was Machined & Valve Was Retested + (ML19253B409)
- 05000313/LER-1978-006, Update to LER 78-006/01x-1:on 780305,during Reinstallation of Primary Manway Cover,Two of 16 Studs Sheared Off at Base of Nut on Second Torque Sequence Pass.Caused by 90% Crack in Diameter on One Stud + (ML19253B410)
- 05000155/LER-1979-024, Forwards LER 79-024/03L-0 + (ML19253B411)
- ML19253B413 + (ML19253B413)
- ML19253B414 + (ML19253B414)
- ML19253B415 + (ML19253B415)
- ML19253B416 + (ML19253B416)
- 05000155/LER-1979-024-03, /03L-0:on 790913,set Points for Pressure Switches on Reactor Depressurizing Sys Pump Discharge Drifted Below Tech Spec Requirement.Cause Not Known.Pressure Switches Were Reset to Trip at 105 Psig + (ML19253B418)
- ML19253B419 + (ML19253B419)
- 05000325/LER-1979-065, Forwards LER 79-065/03L-0 + (ML19253B420)
- ML19253B421 + (ML19253B421)
- 05000293/LER-1979-036, Forwards LER 79-036/01T-0 + (ML19253B423)
- ML19253B424 + (ML19253B424)
- 05000325/LER-1979-065-03, /03L-0:on 790916,HPCI Turbine Tripped & Could Not Be Reset.Caused by HPCI Pump Suction Pressure hi-low Trip Out of Calibr in Trip Direction.Instrument Recalibr & HPCI Sys Returned to Normal + (ML19253B425)
- 05000293/LER-1979-036-01, /01T-0:on 791001,discovered That Portion of SSW Loop Piping B Could Be Overstressed During Seismic Event. Caused by Design Error.Plant Design Change Request Initiated to Reduce Stress to Acceptable Limits + (ML19253B426)
- ML19253B428 + (ML19253B428)
- ML19253B429 + (ML19253B429)
- ML19253B430 + (ML19253B430)
- ML19253B431 + (ML19253B431)
- ML19253B432 + (ML19253B432)
- ML19253B433 + (ML19253B433)
- ML19253B434 + (ML19253B434)
- ML19253B435 + (ML19253B435)
- ML19253B436 + (ML19253B436)
- ML19253B437 + (ML19253B437)
- ML19253B438 + (ML19253B438)
- ML19253B440 + (ML19253B440)
- ML19253B441 + (ML19253B441)
- ML19253B443 + (ML19253B443)
- ML19253B445 + (ML19253B445)
- ML19253B447 + (ML19253B447)
- IR 05000596/1979001 + (ML19253B449)
- ML19253B450 + (ML19253B450)
- ML19253B451 + (ML19253B451)