ML19253B397
| ML19253B397 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/05/1979 |
| From: | Reaves T MISSISSIPPI POWER & LIGHT CO. |
| To: | Haass W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19253B398 | List: |
| References | |
| 0272-0491, 272-491, NUDOCS 7910150496 | |
| Download: ML19253B397 (1) | |
Text
,
]*
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi i
P. O.
B O X 16 4 O. J A C K S O N, MIS SISSIP Pt 39205
-acouctio~ otra a ru r s t October 5, 1979 Mr. W. P. Haass, Chief Quality lasurance Branch Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Deir Sir:
SUBJECT:
Grand Gulf Nuclear Station File 0272/0491 Operational QA Manual (Topical) - Rev. 1 NRC Acceptance Letter
- AECM 79/36*
AECM-79/111 Mississippi Power & Light Company is submitting thirty-six (36) copies of the Nuclear Regulatory Commission Acceptance Letter dated September 17, 1979. Please replace the December 11, 1978 letter with the September 17, 1979 letter and destroy the superseded document.
The Operational Quality Assuranca Program described in Revision 1 of the report is being implemented for the Grand Gulf Nuclear Station.
Yours truly, bfT. E. Reaves, Jr.
Manager of Quality Assurance WEE:lb
Attachment:
NRC Acceptance Letter dated 9/17/79 cc:
Mr. R. B. McGehee Mr. T. B. Conner Mr. N. L. S tampley File iP 0102 5 o f 7c Member Middle South Utilities System c
008