Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102A252 + (ML18102A252)
- ML18102A253 + (ML18102A253)
- ML18102A254 + (ML18102A254)
- ML18102A255 + (ML18102A255)
- ML18102A256 + (ML18102A256)
- ML18102A257 + (ML18102A257)
- ML18102A259 + (ML18102A259)
- ML18102A261 + (ML18102A261)
- 05000272/LER-1996-010, Forwards LER 96-010-00 Re Inadequate Pressurizer Relief Tank Supports.Attachment a Represents Commitment Made to NRC + (ML18102A262)
- ML18102A263 + (ML18102A263)
- 05000272/LER-1996-010-01, :on 960619,identified Pressurizer Relief Tank Hydrodynamic Loads Had Not Previously Been Considered in Support Design.Caused by Failure to Consider Hydrodynamic Loads Caused by Water Discharge.Supports Revised + (ML18102A264)
- ML18102A265 + (ML18102A265)
- SCH96-104, NPDES Discharge Monitoring Repts for June 1996 for Salem Generating Station Units 1 & 2 + (ML18102A266)
- ML18102A267 + (ML18102A267)
- ML18102A269 + (ML18102A269)
- ML18102A270 + (ML18102A270)
- 05000311/LER-1996-005-02, :on 960627,surveillance of Fuel Handling Bldg Ventilation Sys Charcoal Adsorber Test Was Missed.Caused by Inattention to Detail.Individual Involved Received Appropriate Level of Positive Discipline + (ML18102A271)
- 05000272/LER-1994-015, :on 941018,determined That Refueling Water Storage Tank Volume Was Less than Required.Cause Not Determined.Properly Adjusted Transmitters & Returned RWST Level to Specification + (ML18102A272)
- ML18102A273 + (ML18102A273)
- ML18102A275 + (ML18102A275)
- ML18102A276 + (ML18102A276)
- IR 05000272/1996007 + (ML18102A277)
- ML18102A278 + (ML18102A278)
- ML18102A279 + (ML18102A279)
- ML18102A281 + (ML18102A281)
- ML18102A282 + (ML18102A282)
- ML18102A284 + (ML18102A284)
- ML18102A285 + (ML18102A285)
- ML18102A286 + (ML18102A286)
- ML18102A288 + (ML18102A288)
- ML18102A289 + (ML18102A289)
- ML18102A290 + (ML18102A290)
- ML18102A291 + (ML18102A291)
- ML18102A292 + (ML18102A292)
- ML18102A293 + (ML18102A293)
- ML18102A294 + (ML18102A294)
- ML18102A295 + (ML18102A295)
- ML18102A296 + (ML18102A296)
- ML18102A299 + (ML18102A299)
- ML18102A300 + (ML18102A300)
- ML18102A301 + (ML18102A301)
- ML18102A302 + (ML18102A302)
- 05000272/LER-1996-013-01, :on 960711,scaling Error of Over Temperature Delta Temp Resulted in Inoperable Protection Channels.Cause Under Investigation.Scaling Calculations Revised + (ML18102A303)
- ML18102A305 + (ML18102A305)
- ML18102A306 + (ML18102A306)
- 05000272/LER-1996-014, Corrected LER 96-014-00:on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Root Cause Investigation Being Conducted.All NLI Refurbished Breakers Removed Except 2B4D from Vital Loads + (ML18102A307)
- 05000272/LER-1996-014-02, :on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Caused by Cracked Roll Pin,Due to Lack of Knowledge of Plating Induced Hydrogen Embrittlement.Cause Evaluation Being Conducted + (ML18102A308)
- 05000311/LER-1996-007-02, :on 960716,containment Penetration Conductor Overcurrent Circuit Breakers Had Not Been Demonstrated Operable Per Ts.Caused by Failure to Assure That Info Was Incorporated Into Sr.Procedures Reviewed + (ML18102A309)
- 05000272/LER-1996-005-03, :on 960325,TS Surveillance Requirement Implementation Deficiencies Identified.Caused by Lack of Adequate Controls & Understanding of Development Weakness. Procedures Revised + (ML18102A310)
- ML18102A312 + (ML18102A312)
- ML18102A313 + (ML18102A313)