Provides Confirmation of Completion of Long Term Actions Re GL 93-04, Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies
ML18102A286
Person / Time
Site: Salem  
Issue date: 07/31/1996
From: Dawn Powell
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, LR-N96221, NUDOCS 9608080234
Download: ML18102A286 (2)


Text

\\

-PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JUL 311996 LR-N96221 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GENERIC LETTER 93-04 COMMITMENT ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CONTROL CLUSTER ASSEMBLIES SALEM GENERATING STATION NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 Gentlemen:

This letter is to provide confirmation that Public Service Electric & Gas Company (PSE&G) has completed the long term actions pertaining to Generic Letter 93-04, Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies, 10CRFR50.54(f).

The NRC's Request for Additional Information (RAI) dated December 19, 1994, requested that PSE&G inform the staff in writing when the Westinghouse Owners Group recommended current order timing modification was implemented for the Salem Generating stations.

PSE&G had responded to the RAI on January 27, 1995, (ref. LR-95010), stating that the Unit 2 modification had been completed during the eighth refueling outage in 1994 and that the Unit 1 modification would be completed during the twelfth refueling outage in 1995.

Salem Unit 1 entered the twelfth refueling outage in September of 1995 and continues in an extended outage to replace the Steam

.Generators.

During this present outage, the current timing modification was incorporated into the Rod Control System for Unit 1.

Implementation of this modification completes the actions requested of PSE&G relative to the Generic Letter and subsequent RAI.-

Should you have any questions regarding this information, we will be pleased to discuss them with you.

('\\ \\. ?.,


nJ\\:u __ - -- -- ---- --

,,----- ---9608080234 960731 PDR ADOCK 05000272 p

PDR The power is in your hands.

Sincerely, A), J<. Pt%V4 D. R. Powell Manager -

Licensing and Regulation 95-2168 REV. 6/94

Document Control Desk LR-n96221 c Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager -

Salem U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. c. Marschall (X24)

USNRC Senior Resident Inspector -

Salem Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 t ~UL 31 1996