Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-89-135, 1988 Annual Radiological Environ Operating Rept + (ML17347B110)
- ML17347B111 + (ML17347B111)
- ML17347B113 + (ML17347B113)
- ML17347B114 + (ML17347B114)
- L-89-193, Responds to Violation Noted in Insp Rept 50-251/89-12. Corrective Actions:Valve 4-201B Closed Terminating Leakage & Procedure 3/4-OP-041.8 Revised + (ML17347B115)
- ML17347B117 + (ML17347B117)
- ML17347B119 + (ML17347B119)
- ML17347B120 + (ML17347B120)
- 05000251/LER-1989-003-02, :on 890505,reactor Tripped During Performance of Steam Generator Protection Set III Channel Test.Cause Under Investigation.Leads Landed to Provide Signal to Reactor Protection Sys for Valve Position + (ML17347B123)
- L-89-208, Confirms 890821-25 Special Insp of Compliance w/10CFR50,App R,Sections Iii.G,Iii.J & III.0 at Facilities + (ML17347B128)
- ML17347B133 + (ML17347B133)
- L-89-216, Forwards May 1989 Progress Summary of Select Sys Assessment, Per 860812 Order + (ML17347B144)
- PNO-II-89-046A, on 890622,seven Samples from Drug Test Ref to Lab for Confirmatory Testing.One mid-level Supervisor Refused Test & Suspended.Fbi Investigation Continuing.Local Media Coverage Extensive + (ML17347B148)
- L-89-228, Responds to NRC Re Violations Noted in Insp Repts 50-250/89-18 & 50-251/89-18.Corrective Actions:Warning Signs Posted in Safeguards Racks of Both Units & at Power Supply Breakers to Safeguards Logic for Both Trains in Both Units + (ML17347B153)
- L-89-226, Forwards Turkey Point Plant Unit 4 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test, Per 10CFR50,App J + (ML17347B155)
- ML17347B156 + (ML17347B156)
- ML17347B157 + (ML17347B157)
- L-89-229, Responds to Violations Noted in Insp Rept 50-250/89-22. Corrective Actions:Administrative Site Procedure ASP-34, Preparation of Process Sheets & Installation Lists, Revised to Clarify Insp Activity Definitions + (ML17347B158)
- L-89-234, Special Rept:On 890505,0607 & 08,fire Barriers Breached & Other Fire Protection Sys Impairments Occurred.Fire Protection Impairment 2477 on Alarm Point Taken Out of Svc for Welding in Fire Zone 054.Work Ongoing + (ML17347B161)
- ML17347B163 + (ML17347B163)
- ML17347B165 + (ML17347B165)
- ML17347B167 + (ML17347B167)
- L-89-236, Forwards 6-month Integrated Schedule Regulatory Rept. Completion of Category a Integrated/Schedule Mod 0068, Unit 3 ATWS Mods Advanced to Unit 3 Diesel tie-in Outage, Scheduled to Begin in Jan 1991 + (ML17347B169)
- L-89-233, Provides Status of Remaining Performance Enhancement Program Activities,Per NRC 860812 Confirmatory Order.Comprehensive QA Closeout of Program Completed W/One of Nine Findings Open & Scheduled for Completion by Oct 1990 + (ML17347B170)
- IR 05000250/1989014 + (ML17347B171)
- ML17347B173 + (ML17347B173)
- L-89-235, Forwards marked-up FSAR Pages W/Changes Expected from Adoption of Revised Tech Specs in 890605 License Amend Request.Encl Changes to FSAR Would Facilitate Completion of NRC SER + (ML17347B174)
- ML17347B177 + (ML17347B177)
- ML17347B182 + (ML17347B182)
- ML17347B183 + (ML17347B183)
- L-89-250, Monthly Operating Repts for June 1989 for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4 + (ML17347B185)
- ML17347B186 + (ML17347B186)
- IR 05000250/1989018 + (ML17347B190)
- L-89-254, Forwards June 1989 Select Sys Assessment Progress Summary, Per NRC 860812 Order + (ML17347B191)
- 05000250/LER-1989-011, :on 890617,two Safeguards Actuations Occurred. Caused by Damaged Switch Contact Blocks & Personnel Error. Switch Contact Blocks Replaced & Personnel Counseled + (ML17347B192)
- ML17347B193 + (ML17347B193)
- L-89-261, Further Response to Violations Noted in Insp Repts 50-250/89-02 & 50-251/89-02,per 890418 Request.Corrective Actions:Emergency Action Level Guidance Contained in Procedure EPIP-20101 Upgraded to Be Clearer + (ML17347B194)
- 05000250/LER-1989-010, :on 890616,breaker Tripped Causing Power Loss to Rack 66 & Automatic Isolation of Containment & Control Room Ventilation Sys.Caused by Overload of Breaker 3P08-19. Clearance Tag Taped Across Ac Outlet + (ML17347B196)
- L-89-265, Responds to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning. Upgraded Erosion/Corrosion Std,Meeting NUMARC Guidelines,Will Be in Place by 900101 + (ML17347B198)
- ML17347B199 + (ML17347B199)
- L-89-266, Documents Util 890718 Request & Justification for Discretionary Enforcement Re Isolating Intake Cooling Water Sys Header to Allow Cleaning of Intake Cooling Water Basket Strainer + (ML17347B202)
- ML17347B206 + (ML17347B206)
- ML17347B209 + (ML17347B209)
- L-89-269, Advises That Util Search of Labor Contracts Did Not Identify Any Agreements Between Util & Employees Containing Clauses Restricting Employees,Or Former Employees,From Communicating Safety Issues to Nrc,Per Stello + (ML17347B210)
- ML17347B212 + (ML17347B212)
- IR 05000250/1989028 + (ML17347B219)
- L-89-275, Discusses Resolution of Fire Induced Spurious Closure of Vol Control Tank Outlet Valve Reported in 890519 Ler.Fire Watches Will Be Discontinued 30 Days from Ltr Date + (ML17347B226)
- ML17347B231 + (ML17347B231)
- IR 05000250/1989031 + (ML17347B238)
- L-89-285, Special Rept:On 890613-30,breached Fire Barriers & Other Fire Protection Sys Impairments Not Returned to Functional Status within 7 Days,Per Tech Spec 3.14.5.b.Impairments Being Evaluated & Work on Corrections in Progress + (ML17347B244)
- ML17347B246 + (ML17347B246)