Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A486 + (ML17345A486)
- IR 05000250/1988026 + (ML17345A488)
- ML17345A489 + (ML17345A489)
- IR 05000250/1988024 + (ML17345A491)
- ML17345A492 + (ML17345A492)
- ML17345A493 + (ML17345A493)
- ML17345A494 + (ML17345A494)
- ML17345A495 + (ML17345A495)
- IR 05000250/1988031 + (ML17345A497)
- 05000250/LER-1988-024, :on 881001,RHR Pump Declared Out Svc Due to Leakage from Pump Seal.Cause Not Identified.Seal Cooler Flushed Prior to Reassembly to Remove Foreign Matl & Installation Technique Revised + (ML17345A498)
- L-88-471, Special Rept:Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Util Making Effort to Obtain Required Parts.Compensatory Measures Continue to Be Implemented as Applicable + (ML17345A499)
- L-88-475, Provides Supplemental Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss + (ML17345A500)
- L-88-481, Provides Info in Response to Request Re Application of Leak Before Break Technology to Primary Coolant Sys Piping at Plant + (ML17345A501)
- L-88-489, Informs of Desire to Discuss PRA at 881114 Mgt Meeting + (ML17345A502)
- ML17345A503 + (ML17345A503)
- L-88-477, Forwards mgt-on-shift Weekly Rept,Per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (ML17345A504)
- ML17345A505 + (ML17345A505)
- L-88-485, Forwards mgt-on-shift Weekly Rept for Wk Starting 881021. Areas for Improvement Include,Communication,Labeling & Resspirator Requirements + (ML17345A507)
- IR 05000250/1988021 + (ML17345A508)
- ML17345A510 + (ML17345A510)
- W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 + (ML17345A511)
- W3F1-2017-0080, Submittal of Technical Requirements Manual Update + (ML17345A512)
- RAIO-1217-57401, LLC - Response to NRC Request for Additional Information No. 219 (Erai No. 8998) on the NuScale Design Certification Application + (ML17345A513)
- ML17345A516 + (ML17345A516)
- ML17345A517 + (ML17345A517)
- ML17345A518 + (ML17345A518)
- 05000353/LER-1917-008, Regarding Eog Inoperable for Greater than 30 Days Resulting in Condition Prohibited by Technical Specifications + (ML17345A521)
- ML17345A527 + (ML17345A527)
- ML17345A528 + (ML17345A528)
- L-88-497, Monthly Operating Repts for Oct 1988 for St Lucie Units 1 & 2 + (ML17345A533)
- 05000250/LER-1988-025, :on 881013,determined That Potential Interaction Existed Between Emergency Diesel Generator Pump Control Sys Which Could Have Prevented Fulfillment of Safety Function.Caused by Inadequate Design + (ML17345A534)
- IR 05000250/1988025 + (ML17345A535)
- L-88-496, Revised Semiannual Radiactive Effluent Release Rept, Jan-June 1988 + (ML17345A536)
- ML17345A537 + (ML17345A537)
- L-88-501, Special Rept:On 881012,13,25 & 28,five Fire Protection Impairments Left Open in Excess of Tech Specs Permitted Time Limits.Caused by Either Plant Mods or Equipment Maint.Plant Continues to Implement Compensatory Measures as Applicable + (ML17345A538)
- L-88-491, Forwards Summary of mgt-on-shift Weekly Repts,Per Commission 871019 Order + (ML17345A539)
- 05000250/LER-1986-041, :on 860201,RHR Pumps Not in Operation,Per Tech Spec During Refueling Pool Fill During Previous Refueling Outage.Caused by Inadequate Review of Plant Procedures. Administrative Procedure 103.18 Revised + (ML17345A540)
- ML17345A541 + (ML17345A541)
- L-88-500, Forwards mgt-on-shift Weekly Repts for Wk Starting 881104, Per 871019 Order & Plant supervisor-nuclear Shift Repts + (ML17345A542)
- L-88-502, Forwards Select Sys Assessment Progress Summary for Oct 1988 + (ML17345A543)
- ML17345A548 + (ML17345A548)
- IR 05000250/1988029 + (ML17345A550)
- ML17345A553 + (ML17345A553)
- L-88-509, Forwards mgt-on-shift Weekly Rept for Wk Starting 881111,per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (ML17345A554)
- L-88-518, Provides Addl Info Re Drawing Update Program at Plant,Per 881114 Mgt Meeting.Small Bore Piping & Tubing on Selected safety-related & Important to Safety Sys Were Walked Down to Verify Functionality & Develop Isometrics + (ML17345A555)
- ML17345A556 + (ML17345A556)
- ML17345A558 + (ML17345A558)
- ML17345A559 + (ML17345A559)
- ML17345A560 + (ML17345A560)
- ML17345A562 + (ML17345A562)
- ML17345A564 + (ML17345A564)