Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-96-132, Requests Amend to Ts,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of Nhsc or Environ Assessment Provided in Rev a + (ML17292A354)
- ML17292A355 + (ML17292A355)
- ML17292A356 + (ML17292A356)
- ML17292A357 + (ML17292A357)
- GO2-96-137, Monthly Operating Rept for June 1996 for WNP-2 + (ML17292A361)
- ML17292A362 + (ML17292A362)
- GO2-96-140, Provides Final Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (ML17292A363)
- 05000397/LER-1996-003, :on 960615,required Surveillance Test Not Performed When Required by TS 3.4.1.3.Caused by Inadequate Procedures.Implementing Surveillance Procedure & Reactor Plant Startup Procedures Revised + (ML17292A364)
- ML17292A365 + (ML17292A365)
- IR 05000397/1996007 + (ML17292A367)
- ML17292A368 + (ML17292A368)
- ML17292A369 + (ML17292A369)
- ML17292A371 + (ML17292A371)
- ML17292A372 + (ML17292A372)
- ML17292A373 + (ML17292A373)
- IR 05000397/1996008 + (ML17292A375)
- GO2-96-141, Forwards Response to RAI Re NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment + (ML17292A376)
- 05000397/LER-1996-005, :on 960624,determined Missed Surveillance Test Re Channel Check of Average Power Range Monitor.Caused by Inadequate Procedures.Revised Surveillance Procedure Re When APRM Checks Must Be Performed + (ML17292A377)
- 05000397/LER-1996-004, :on 960624,plant Was Manually Scrammed by Control Room Personnel Due to Reactor Water Level Transient Experienced During Testing of Digital Feedwater Sys.Caused by Programming Error.Sys Was Corrected + (ML17292A380)
- ML17292A382 + (ML17292A382)
- IR 05000397/1996002 + (ML17292A383)
- ML17292A384 + (ML17292A384)
- GO2-96-148, Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed + (ML17292A385)
- GO2-96-151, Responds to Spent Fuel Pool Survey Commitment.Informs That Fuel Movement Delay Time Assumptions Were Added as Prerequisites to Appropriate Plant Procedure on 960413 + (ML17292A387)
- GO2-96-149, Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996 + (ML17292A388)
- ML17292A389 + (ML17292A389)
- ML17292A392 + (ML17292A392)
- ML17292A393 + (ML17292A393)
- ML17292A394 + (ML17292A394)
- ML17292A396 + (ML17292A396)
- GO2-96-154, Responds to RAI Re Insp Rept 50-397/96-01.Plant Procedure PPM 1.3.42 Revised to Clarify Trouble Shooting Guidance & Restrictions + (ML17292A400)
- ML17292A402 + (ML17292A402)
- ML17292A404 + (ML17292A404)
- ML17292A406 + (ML17292A406)
- GO2-96-156, Monthly Operating Rept for Jul 1996 for WNP-2 + (ML17292A407)
- GO2-96-159, Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 + (ML17292A408)
- ML17292A409 + (ML17292A409)
- ML17292A410 + (ML17292A410)
- ML17292A411 + (ML17292A411)
- 05000397/LER-1996-006, :on 960709,average Power Range Monitor Rod Block Downscale Surveillance Not Performed Prior to Entry Into Mode 1.Caused by long-standing Misinterpretation of Requirements of Tss.Procedures Revised + (ML17292A412)
- ML17292A414 + (ML17292A414)
- ML17292A416 + (ML17292A416)
- ML17292A417 + (ML17292A417)
- GO2-96-163, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-10.C/A:initiated Immediate Evacuation of Drywell, re-established Function of Flashing Light & Counseled Personnel in Radiation Protection Department + (ML17292A419)
- ML17292A420 + (ML17292A420)
- ML17292A422 + (ML17292A422)
- ML17292A424 + (ML17292A424)
- GO2-96-169, Forwards FFD Semiannual Performance Data Rept for 960101 to 0630 + (ML17292A425)
- GO2-96-168, Forwards Affidavit Requesting That ABB CE Nuclear Operations Drawing AA 263 843 U,Rev 1,Sheet 1 Be Withheld from Public Disclosure + (ML17292A426)
- GO2-96-170, Provides Addl Info Re Justification for Continued Operation for Sgts.Supply Sys Expects to Submit Request to Amend TS for Secondary Containment by 961015 + (ML17292A427)
- ML17292A428 + (ML17292A428)