GO2-96-156, Monthly Operating Rept for Jul 1996 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1996 for WNP-2
ML17292A407
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-156, NUDOCS 9608160272
Download: ML17292A407 (12)


Text

REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR o 9+508160272 DOC ~ DATE ~ 96/07/3 1 NOTARIZEDi NO DOCKET g

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.

'ashington Public Power Supply System SMITHEG.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jul 1996 for WNP-2.W/960807 ltr.

DISTRIBUTION CODE:

E24D COPIES RECEIVED:LTR I

ENCL l

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME COLBURNRT COPIES LTTR ENCL 1

'1 INTERNAL: ACRS CENTER 1

1 1

1 1

1 1

AEOD/SPD/RRAB NRR/DRPM/PECB 1

1 1

1 Y

EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC D

p N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(

TOTAL NUMBER OF COPIES REQUIRED:: LTTR 1'0 ENCL',

'10

p I

I

1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352-0968

~ (509) 372-5000 August 7, 1996 G02-96-156 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

1 WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JULY 1996 Transmitted herewith is the Monthly Operating Report for the month ofJuly 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 CC:

LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DLWilliams - BPA / 399 9608i60272 96073i PDR ADOCK 05000397 3.8008~

C p

I l'

OPERATING STATUS REPORT for WNP-2 Date:

August 1, 1996 2.

3.

4.

5.

6.

7.

8.

9, 10.

Outage + On-line Hours:

744.0 3486 1199 1153 1153 1107 none none Docket:

50-397 Reporting Period: JULY 1996 UtilityContact:

Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Gross MW,):

Maximum Dependable Capacity - summer (Net MW, ):

Ifchanges occur above since last report, give reasons:

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

Report Period Hours 13.

Hours Reactor Critical 14.

Rx Reserve Shutdown Hours 15.

Hours Generator On-Line 16.

Unit Reserve Shutdown Hours 17.

Gross Thermal Energy (MWH) 18.

Gross Electrical Energy (MWH) 19.

Net Electrical Energy (MWH) 20.

Unit Service Factor 21.

Unit AvailabilityFactor 22.

Unit Capacity Factor (MDC Net) 23.

Unit Capacity Factor (DER Net) 24.

Unit Forced Outage Rate 25.

Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 1,592,405 507,380 482,316 100.0%

100.0%

58.6%

56.2%

0.0%

0.0 YEAR 5,111.0 2,563.8 985.9 2,326.6 997.4 6,139,108 2,030,650 1,917,419 45.5%

65.0%

33.9%

32.5%

5.0%

123.3 CUMULATIVE 101,959.2 72,199.6 1,730.8 69,577.1 1,956.2 206,596,658 69,608,130 66,675,737 68.2%

70.2%

59.9%

59.0%

10.8%

8,443.0 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.

Ifcurrently shutdown, estimated startup date:

Note:

Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.

t r

s,.

I H>>

II II.

II

REPORT PERIOD:

JULY 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: August 1, 1996 COMPLETED BY: B Kasko TELEPHONE:

(509) 377M73 DAY AVERAGEDAILYPOWER LEVEL (Net MWe) 440 637 AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 16 17 10 12 13 14 15 584 595 597 595 591 584 577 577 657 653 572 623 18 19 20 21 22 23 24 25 26 27 28 29 30 31 653 658 704 733 718 684 719 716 714 715 714 708 715 725 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

f E

J 1

I Ir

~

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

JULY 1996 DOCKET NOat 50-397 UNIT NAME: WNP-2 DATE: August I, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

t WNP-2 ramped up to 68% power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems. At the end of the month WNP-2 was operting at 68% power and-continuing with startup following the refueling outage.

TYPE P - Forced S - Scheduled REASON AAqu>pmeur Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G -

rational Error H - Other METHOD I -M~~l 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM Sc COMPONENT GQl 1E its

I t'

WASHINGTON PUELIC POWER SUPPLY SYSTEM REGULATORYCOMMITMENTIDENTIFICATIONFORM (FOR INTERNALDISTRIBUTIONONLY)

Regulatory Agency NRC DrivingDocument/Letter G02-96-156 Licensing Engineer B Kasko Document Date 8/7/96 Document Author/Reviewer B Kasko Related Documents Drivin Document: ILTR Q REGR Q INSP Q EMC Q OTHER DrivingDocument Description Monthly Operating Report - July Commitment: None Cod~: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTLNumber QAOR Assigned to Supvr. Name (print)

Supvn Signature Commitment:

Cod~: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTL Number QAOft Assigned to Supvr. Name (print)

Supvr. Signature Commitment:

Codes: QREG QHD QRXSU QOT QOT-F Schedule Complete Date PTL Number OAQR Assigned to Supvr. Name (print)

Supvr. Signature 966.25260 R3 DRAFT I06/04/96I Doc Type:

LTR - Letter EMC - Exit Meeting Commitment REGR - Regulatory Requirement INSP - Made during NRC Inspection CODES:

REG - Regulatory HD - Firm date given to reg agency RXSU - Reactor start up issue OT

- Specific outage, e.g., OT97 OT-F - Forced outago PTL Number:

A - Active R - Recurring

0