Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000123/2002015 + (ML17291A704)
- ML17291A705 + (ML17291A705)
- 05000397/LER-1995-004, :on 950226,malfunction in Main Turbine DEH Control Sys Caused All Four High Pressure Turbine Governor Valves to Rapidly Close.Caused by Blown Fuse.Suspected Faulty Circuit Card Replaced + (ML17291A707)
- ML17291A708 + (ML17291A708)
- GO2-95-057, Addresses follow-up RAI Re GL 92-08, Thermo-Lag Fire Barriers, as Detailed in NRC + (ML17291A709)
- ML17291A710 + (ML17291A710)
- GO2-95-059, Informs That Util Will Implement Formal Industry Position on Severe Accident Mgt Approved by Nuclear Energy Inst Nuclear Strategic Issues Advisory Committee on 941104 + (ML17291A711)
- ML17291A713 + (ML17291A713)
- ML17291A715 + (ML17291A715)
- GO2-95-063, 1994 Annual Environ Operating Rept + (ML17291A716)
- GO2-95-061, Repts Listed Property & Liability Insurance Coverage,Per 10CFR50.54(w)(3) + (ML17291A718)
- GO2-95-067, Monthly Operating Rept for Mar 1995 for Wa Nuclear Project 2 + (ML17291A720)
- ML17291A721 + (ML17291A721)
- IR 05000122/2003004 + (ML17291A723)
- ML17291A724 + (ML17291A724)
- GO2-95-070, Responds to Violations Noted in Insp Rept 50-397/94-33. Corrective Actions:Redundant Outboard Containment Isolation Valve Deactivated Isolating Associated Sample Line + (ML17291A726)
- GO2-95-071, Provides Notice of Planned Integrated Assessment Team Insp 50-397/95-08 + (ML17291A728)
- GO2-95-068, Informs of Mod to WNP-2 FSAR Commitment Per Surveillance of post-irradiated Fuel + (ML17291A733)
- GO2-95-074, WNP-2 Annual Rept for Jan-Dec 1994 Radiological Environ Monitoring Program + (ML17291A735)
- PNO-IV-95-018, on 950409,during Heatup & Startup,Sro on Shift as Control Room Supervisor Apparently Operated Bypass Valve in Reactor Water Cleanup Sys.Caused by High Pressure Approx 250 Psig When Valve Was Operated + (ML17291A736)
- ML17291A737 + (ML17291A737)
- ML17291A739 + (ML17291A739)
- ML17291A743 + (ML17291A743)
- GO2-95-084, Operational Ecological Monitoring Program for Nuclear Plant 2 + (ML17291A748)
- ML17291A750 + (ML17291A750)
- ML17291A751 + (ML17291A751)
- GO2-95-076, Forwards Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SR to Tables 3.3.2.-1,3.3.2-2 & 4.3.2.1-1 + (ML17291A753)
- ML17291A754 + (ML17291A754)
- ML17291A755 + (ML17291A755)
- ML17291A756 + (ML17291A756)
- ML17291A761 + (ML17291A761)
- L-17-309, Spent Fuel Storage Casks Registration + (ML17291A764)
- LR-N17-0140, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860) + (ML17291A766)
- ML17291A767 + (ML17291A767)
- ML17291A772 + (ML17291A772)
- ML17291A774 + (ML17291A774)
- ML17291A776 + (ML17291A776)
- ML17291A777 + (ML17291A777)
- ML17291A781 + (ML17291A781)
- GO2-95-089, Actuation of EDG + (ML17291A782)
- ML17291A783 + (ML17291A783)
- 05000397/LER-1995-007, :on 950222,emergency Diesel Start Occurred Due to Voltage Transient on BPA Grid.Confirmation Was Received at 17:51 H That Disturbance Had Originated in BPA Grid + (ML17291A784)
- 05000397/LER-1995-005, :on 950222,inoperable IRM Had Been Relied Upon to Meet TS Requirements During Reactor Startup.Caused by Lack of Neutron Source to Test Instrumentation. Sys Knowledge Gained Will Be Incorporated + (ML17291A785)
- IR 05000397/1995034 + (ML17291A787)
- ML17291A788 + (ML17291A788)
- ML17291A790 + (ML17291A790)
- ML17291A792 + (ML17291A792)
- ML17291A793 + (ML17291A793)
- ML17291A794 + (ML17291A794)
- ML17291A796 + (ML17291A796)
- IR 05000397/1995011 + (ML17291A798)