Forwards Insp Rept 50-397/95-11 on 950410-14.No Violations Noted
ML17291A794
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/10/1995
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A795 List:
References
NUDOCS 9505180197
Download: ML17291A794 (5)


See also: IR 05000397/1995011

Text

~Pg REOyL

"o

~~i

ice

<<4

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

Hay 10,

1995

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-11

This refers to the inspection

conducted

by Hr. L. T. Ricketson of this office

on April 10-14,

1995.

The inspection

included

a review of activities

authorized for your Washington Nuclear Project-2 facility.

At the conclusion

of the inspection,

the findings were discussed

with you and those

members of

your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

Samuel

J. Collins, Director

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Inspection

Report

50-397/95-11

cc w/enclosure:

Washington Public

Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Hanager

P.O.

Box 968,

HD 927H

Richland,

Washington

99352-0968

9505i80i97 9505i0

PDR

ADQCK 05000397

6

PDR

U

Es

0

Washington Public Power

Supply System

Washington Public

Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.OS

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power

Supply System

E-Hail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IE06)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB File (Hodges)

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

B. Murray, DRSS/FIPB

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

L. T. Ricketson,

DRSS/FIPB

DOCUMENT NAME:

0:

IPBttLTRiWN511RP. LTR

To receive copy cf dcc

t, indicate in box:

" ~ Copy without enclosures

"E" I Copy with enciosures "N" ~ No copy

RIV:FIPB

LTRicketson: nh

04

95

C: FIPB

BHurray

04

95

DD:DR

Sca

o

0 /

/95

CO

D:DRP

ABBeac

0 /

/95

D:DRS

SJCol

ns

/

/95

Washington Public Power

Supply System

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB ( IE06)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB File (Hodges)

Branch Chief (DRP/E,

WCFO)

Senior Project

Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

B. Hurray,

DRSS/FIPB

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

8 ~ Henderson

(PAO,

WCFO)

L. T. Ricketson,

DRSS/FIPB

DOCUMENT NAME:

0:

IPBttLTRXWN511RP.LTR

To receive copy of doc

t. indicate inboxt

" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

e

RIV: F IPB

LTRicketson:nh

04

95

C:FIPB

BMurray

04

y'95

DD:DR

Sca

o

0 /

/95

0

C

L

0

CO

D:DRP

ABBeac

0 /

/95

D:DRS

SJCol

ns

/ -/95