ML17291A705
| ML17291A705 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/24/1995 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9503290383 | |
| Download: ML17291A705 (5) | |
Text
gA'6 RECIj(Cg Cy 0$
g UNITEDSTATES CLEAR REGULATORY COMMISSIO REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 l4R 2~ e95 NOTICE OF LICENSEE MEETING Name of Licensee:
Name of Facility:
Docket No.:
Washington Public Power Supply System Washington Nuclear Project 2
(WNP-2) 50-397 Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
April 7, 1995 I:30 - 4:30 p.m.
Region IV office, Arlington, Texas Training Conference Room Enforcement Conference to discuss operability issues related to the control room emergency ventilation and pressurization system L. J. Callan, Regional Administrator T.
R. quay, Director, Project Directorate IV-2, Division of Reactor Projects, Office of Nuclear Reactor Regulation (NRR)
A. B. Beach, Director, Division of Reactor Projects (DRP)
J.
E. Dyer, Deputy Director, DRP K.
E. Perkins, Director, Walnut Creek Field Office T.
P.
Gwynn, Director, Division of Reactor Safety S. J. Collins, Director, Division of Radiation Safety and Safeguards D. D. Chamberlain, Chief, Project Branch E,
DRP J.
W. Clifford, Senior Project
- Manager, NRR R.
C. Barr, Senior Resident Inspector, DRP S. J.
- Campbell, Resident Inspector, DRP Licensee Attendees:
J.
V.
P.
R.
J.
H.
D. A.
M.
E.
R. J.
G.
L.
J.
E.
J.
A.
J.
E.
W. A.
- Parrish, Vice President, Nuclear Operations
- Bemis, Manager, Regulatory Programs
- Swailes, Plant General Manager
- Swank, Manager, Licensing and Compliance Reddemann,
- Manager, Technical Services
- Barbee, Manager, Systems Engineering
- Gelhaus, Manager, Projects
- Parker, Manager, Megawatt Improvement Program Hinsley, Maintenance Craft Supervisor
- Bekhazi, System Design Engineer
- Belts, Equipment Operator 9503290383 950324 PDR ADOCK 05000397 9
Washington Public Power Supply System NOTE:
(1)
This meeting is open to attendance by members of the general public.
(2)
NRC personnel, not listed above, that desire to attend this meeting should notify Dwight Chamberlain by 4 p.m.
(CST) on March 31 at (817) 860-8249.
Approved By:
A, ac irector Division of Reactor Projects CC:
Washington Public Power Supply System ATTN; J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023
- Richland, Washington 99352 Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, MD 927M
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
G.
E.
C.
- Doupe, Esq.
3000 George Washington Way P.O.
Box 968, MD 396
- Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A. Swank, WNP-2 Licensing Manager P.O.
Box 968 (Mail Drop PE20)
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
- P.
R.
- Bemis, Regulatory Programs Manager P.O.
Box 968 (Mail Drop PE20)
- Richland, Washington 99352-0968
Washington Public Power Supply System Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190
- Prosser, Washington 99350-0190 Winston
& Strawn ATTN:
H.
H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System MAR p g
~p Distribution:
E-Mail to:
CJG (Carol Gordon)
DMK1 (DE HE Kunihiro)
BWH (Breck Henderson)
PMNS (Htg ~ Announcement NRC Attendees DHB (IE. 45)
J.
L. Milhoan, DEDR (HS 17G21)
H.
L.= Thompson, DEDS (HS 17G21)
W ~
T ~ Russell, D/NRR (MS 12D1)
A. C. Thadani, ADT/NRR (HS 12G18)
R.
P.
Zimmerman, ADP/NRR (MS 12G18)
J.
Lieberman, D/OE (HS 7H5)
L ~ J
~ Chandler, OGC (MS 15B18)
OEDO RIV Coordinator (MS 17G21)
J.
H. Hontgomery, DRA G ~
F ~ Sanborn, EO CD AD Hackney,
- RSLO, RIV J ~ T. Gilliland,
- DRS, DRSS)
L.
ST Ousley RIV File DRP WNP Meeting File WNP Resident Inspector Coordinator)
RI RP/E P
C RS D: DRP DDChamberlain;df J
>land CA ney ABBeach 3/24/95 3/
5 3/g. /95 3/+95
Washington Public Power Supply System MAR pg
)9@
Distribution:
E-Mail to:
CJG (Carol Gordon)
DMK1 (D.
M. Kunihiro)
BWH (Breck Henderson)
PMNS (Mtg. Announcement NRC Attendees DMB (IE 45)
J.
L. Milhoan, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
W. T. Russell, D/NRR (MS 12D1)
A. C. Thadani, ADT/NRR (MS 12G18)
R.
P.
Zimmerman, ADP/NRR (MS 12G18)
J.
Lieberman, D/Of (MS 7H5)
L. J. Chandler, OGC (MS 15B18)
OEDO RIV Coordinator (MS 17G21)
J.
M. Montgomery, DRA G.
F. Sanborn, EO C. A. Hackney,
- RSLO, RIV J.
T. Gilliland,
- DRS, DRSS)
L. S. Ousley RIV File DRP WNP Meeting File WNP Resident Inspector Coordinator)
RI RP/E P
)
RS D: DRP DDChamberlain;df J
9 sland CA kney ABBeach 3/g@95 3/
5 3/vg /95 3/+95