ML17291A774
| ML17291A774 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/02/1995 |
| From: | Clifford J NRC (Affiliation Not Assigned) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A775 | List: |
| References | |
| TAC-M87076, TAC-M88625, NUDOCS 9505100203 | |
| Download: ML17291A774 (8) | |
Text
May 2, 1995
"". v. V. Parrish (Hail rop 1023)
Vice President Nuclear Operations 3000 George Washington Way Washi..gton Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 r
SUBJECT:
ISSUANCE OF AMENDMENT FOR THE WASHINGTON PUBLIC POWER. SUPPLY SYSTEM NUCLEAR PROJECT NO.
2 (TAC NOS.
H87076 AND H88625) n
Dear lMr. Parrish:
The Commission has issued the enclosed Amendment No. "37 to Facility Operating License No.
NPF-21 for WPPSS Nuclear Project No. 2.
The amendment consists of changes to the Facility Operating License and Technical Specifications (TSs) in response to your application dated July 9,
- 1993, as supplemented by letters of October 8 and October 25,
- 1993, January 6, January 6, February 2,
Hay 3, Hay 13, September 26, and October 12, 1994.
The amendment increases the authorized maximum power level of the reactor from the current limit of 3323 megawatts thermal (HWt) to 3486 HWt.
The amendment also modifies TSs to incorporate the increased power limit in the plant operating limits.
This request is in accordance with the generic power uprate program for boiling-water reactors (BWRs) established by the General Electric Company and approved by the NRC staff in a letter dated September 30, 1991.
A copy of the related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly Federal ReSister notice.
Sincerely, Original Signed By James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397 DISTRIBUTION:
Docket File
Enclosures:
- CGrimes, 011E22 1.
Amendment No. "3/I;o NPF-21 Region IV 2.
Safety Evaluation
- KPerkins, WCFO
- OGC, 015818 cc w/encls:
See next page
- OPA, 02G5 EAdensam Tguay
- For previous co;Icurrences JWermiel see attached ORCs RJones RWessman DOCUMENT NAME:
WNP87076.AHD AThadani LHurley, RIV JClifford ACRS (4),
TWFN PUBLIC EPeyton GHill (2),
T5C3 OC/LFDCB, T9E10 PDIV-2/RF
- RIV, WCFO (4)
CMcCracken CMiller RZimmerman RBarrett OFC LA/DRPW PDIV-2:PM TECH ED BC:SICB'C:SPLB; C:SRXB" C:TERB' BC:EMEB" NAME EPoyt n
DATE 4@85 Jclifford 4
5 RSandors 3/14/95 JWormiol 3/27/95 CMccrackon
! 3/21/95 RJones:
CMillor 3/21/95, '/24/95 RWossnian 3/24/95.
OFc C:SCCB'AME RBarrott DATE 3/22/95 PD:PDIV-2 WBato an 4/
5 OGc'Llnal 4/7/95 RPW d nsam AD OP I ~>>
NRR:Dl AThadani RZimmorman R ssoll sl isles t nhs s,
mtss iS0SiO0aO3 eSOSoa PDR ADQCK 050003'tl7 P
II I
IJ~ I I
I'I JJ
'I I
ll I
I' IJ j
I Il P
/l I
'I J
I)
)
QJ bl IJ I
J, Ik
)I I
I J
I a
h 1
0' J
~
~ A Mr. J.
V. Parrish (Hail rop 1023)
Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Hay 2
i995
SUBJECT:
ISSUANCE OF AHENDMENT FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO.
2 (TAC NOS.
H87076 AND H88625)
Dear Hr. Parrish:
The Commission has issued the enclosed Amendment No. "37 to Facility Operating License No. NPF-21 for WPPSS Nuclear Project No. 2.
The amendment consists of changes to the Facility Operating License and Technical Specifications (TSs) in response to your application dated July 9,
- 1993, as supplemented by letters of October 8 and October 25, 1993, January 6, January 6, February 2, May 3, May 13, September 26, and October 12, 1994.
The amendment increases the authorized maximum power level of the reactor from the current limit of 3323 megawatts thermal (HWt) to 3486 MWt.
The amendment also modifies TSs to incorporate the increased power limit in the plant operating limits.
This request is in accordance with the generic power uprate program for boiling-water reactors (BWRs) established by the General Electric Company and approved by the NRC staff in a letter dated September 30, 1991.
A copy of the related Safety Evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's next biweekly ~ederal Recefster notice.
Sincerely, Original Signed By James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office'f Nuclear Reactor Regulation 0
k t M
59-397
'~IE R
BUTIO Docket File
Enclosures:
- CGrimes, 011E22 l.
Amendment No. i3ko NPF-21 Region IV 2.
Safety Evaluation
- KPerkins, WCFO OGC, 015818 cc w/encls:
See next page
- OPA, 02GS EAdensam Tguay
- For previous concurrences JWermiel see attached ORCs RJones RWessman DOCUMENT NAME:
WNP87076.AMD AThadani LHurley, RIV JClifford ACRS (4),
TWFN PUBLIC EPeyton GHill (2),
T5C3 OC/LFDCB, T9E10 PDIV-2/RF
- RIV, WCFO (4)
CMcCracken CMiller RZimmerman RBarrett LA/DRPW PDIV-2:PM TECH ED BC:SICB'C:SPLB':SRXB':TERB'C:EMEB'AME DATE EPeyt n
Jclifford 4
5 RSanders 3/14/95 JWermiel CMcCracken 3/27/95 3/21/95 RJones CMiller RWessman 3/21/95 3/24/95 3/24/95 ojc C:SCCB'D:PDIV-2 OGc'D NRR:Dl NAME RBarrett WBate an Svtt@I d nsam AThadani Rzimmerman R ssell DATE 3/22/95 4F 5
4/7/9S
/
5 qa7 5 495
I
~
~.'
lt
a + ~IaR RE0y Wp0 m ss
'+i r
p s
~s(
ca c
I O
O $
++*<<d' UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 Hay 2, 1995 Hr. J.
V. Parrish (Hail Drop 1023)
Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968
SUBJECT:
ISSUANCE OF AHENDHENT FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEH NUCLEAR PROJECT NO.
2 (TAC NOS.
H87076 AND H88625)
Dear Hr. Parrish:
The Commission has issued the enclosed Amendment No.
137 to Facility Operating License No. NPF-21 for WPPSS Nuclear Project No. 2.
The amendment consists of changes to the Facility Operating License and Technical Specifications (TSs) in response to your application dated July 9,
- 1993, as supplemented by letters of October 8 and October 25, 1993, January 6, January 6, February 2, Hay 3, Hay 13, September 26, and October 12, 1994.
.The amendment increases the authorized maximum power level of the reactor from the current limit of 3323 megawatts thermal (HWt) to 3486 HWt.
The amendment also modifies TSs to incorporate the increased power limit in the plant operating limits.
This request is in accordance with the generic power uprate program for boiling-water reactors (BWRs) established by the General Electric Company and approved by the NRC staff in a letter dated September 30, 1991.
A copy of the related Safety Evaluation is also enclosed.
The Notice of issuance will be included in the Commission's next biweekly Federal
~Re ister notice.
Sincerely, Docket No. 50-397 ames W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Enclosures:
l.
Amendment No. i37 to NPF-21 2.
Safety Evaluation cc w/encls:
See next page
I fl II l
4
Hr. J.
V. Parrish Hay 2, 1995 CC; Hr. J.
H. Swailes
'NP-2 Plant General Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 G.
E.
C. Doupe, Esq.
(Hail Drop 396)
Washington Public Power Supply System 3000 George Mashington May Richland, Washington'9352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympia, Washington 98504-3172 Hr. D. A. Swank (Hail Drop PE20)
MNP-2 Licensing Hanager Washington Public Power Supply System P.O.
Box 968
- Richland, Mashington 99352-0968 Hr. Paul R.
Bemis (Hail Drop PE20)
Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Hr. R.
C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Comnission P.O.
Box 69
- Richland, Washington 99352-0968 H. H. Philips, Jr.,
Esq.
Winston
& Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Hr. D.E. Hershberger, Sr. Engineer Siemens Power Corporation-Nuclear Division (SPC-ND) 2101 Horn Rapids Road P.O.
Box 130
- Richland, Mashington 99352-0130
~ ~