ML17291A750

From kanterella
Jump to navigation Jump to search
Informs That Operation QA Program Description,Revs 18,19 & 20,acceptable
ML17291A750
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/17/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9505030029
Download: ML17291A750 (6)


Text

~ i~>S ~ECc I

G I

o%

attt4 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352

SUBJECT:

WNP-2 OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

REVISION 18, 19, AND 20 We have completed our review of your Operational Quality Assurance Program Description, Revisions 18, 19, and 20, submitted by your Letter G0-94-287, dated December 29, 1994.

Revisions 18 and 19 reflect changes to your organization which combine the quality assurance (QA) functions under the Assistant Hanaging Director, Operations.

Revision 20 changes the method used by Procurement QA and Quality Assessments to review procurement documents and monitor the procurement process.

Our review determined that your quality assurance program description as changed by your December 29,

1994, submittal continues to meet the requirements of 10 CFR Part 50, Appendix B, and is acceptable.

Should you have any questions regarding this letter, please contact Hr.

W.

P.

Ang of my staff at (510)975-0310.

Sincerely, Docket:

50-397 License:

NPF-21 homas P.

Gwynn,. Dir ctor Division of Rea tor afyty CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M

Richland, Washington 99352-0968

~ C f I

'7505030029 950417 PDR ADCICK 05000397 P

O11D

,l

Washington Public Power Supply System Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way P.O.

Box 968, HD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Mashington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

,Chairman P.O.

Box 190

Prosser, Mashington 99350-0190 Winston 5 Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

L

Washington Public Power Supply System bcc to DMB (IEOl) bcc distrib. by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

R.

Gramm, NRR AI File 95-003 Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

S. Black, NRR DOCUMENT NAME:

To receive copy cf document, indicate in box: "C" a Copy without enclosures

~ Copy with enclosures "N

~ No copy RIV:RE C

C:PSB C

D:DRS D:DRS SPATE 04/ll/95 WPANG 04/ll/95 TP WYN A H 04/

/95 TP YNN 04/

/95 "Previously concurred OFFICIAL RECORD COPY

Washington Public Power Supply System "bcc to DHB (IE01)

R"-C=i'Ic >

>~R C RiV 8CFO

~t: s.p~ Pg Q/Ot ~3 bcc distrib.

by RIV:

'L'.-"PPQKll an DRSS-F IP8

. Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

R.

Gramm, NRR AI File 95-003 Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

S. Black, NRR DOCUHENT NAHE:

To receive copy of document, indicate in box:

C

~ Copy without enclosures

~ Copy with enctosures "N

~ No copy RJPATE

Pi WPANG ("

RIV:RE C

C:PSB C

D:DRS TP WYN A H D:DRS TPG YNN 04/ll/95 04/ll/95 04/

/95 04/

/95

  • Previously concurred OFFICIAL RECORD COPY