ML17291A772

From kanterella
Jump to navigation Jump to search
Forwards Results of FEMA Emergency Coordination Center Drill Evaluation Rept of 950104 Drill for State of Wa
ML17291A772
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/05/1995
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A773 List:
References
NUDOCS 9505100077
Download: ML17291A772 (5)


Text

PRIORI I Y 2 REGULATI'%KRbQFZ6PIB&SIlkTjETEM (RIDE)

I

,; ACCESSION NBR:9505100077 DOC.DATE: 95/05/05 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION COLLINS,S.J.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System P

NOTES:

SUBJECT:

Forwards results of FEMA emergency coordination center drill evaluation rpt of 950104,drill for State of WA.

R DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr Exercise Rep RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AEOD/DOA/IRB NRR/DISP/PIPB NUDOCS-ABSTRACT RGN4 FILE 0'1 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J FILE CENTE NRR DO TERB OE DIR NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 R

D U

VOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTEI COiiTACTTI.IEDOCL'RIED'I CON'TROL DESk. ROONI P1.37 (EX I: 504-T083 ITO ELIWIIYATEi'OL'R 4'AERIE FROil DIS'I'RlDU'I'IOYI.ISTS FOR DOCl MIEN'I'SYOL'Oi "I' L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

~pit Racy~

~Ca

+

~ +i

+**+~

UNITED STATES

'LEAR REGULATORY COMlVllSS REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 May 5, 1995 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352

SUBJECT:

FEDERAL EMERGENCY MANAGEMENT AGENCY'S REPORT Enclosed is a copy of the Federal Emergency Han'agement Agency's (FEHA)

Emergency Coordination Center drill evaluation report of the January 4,

1995,'rill for the State of Washington.

The drill was specific to the WNP-2 Nuclear Power Plant.

The report indicates that FEHA observed no Deficiencies or Areas Requiring Corrective Actions during the drill.

I t The purpose of this letter is to transmit to you the results of the FEHA evaluation of the Emergency Coordination Center drill.

No response to the NRC is required.

If you have any further questions, please contact Hr. Arthur D. Hcgueen at (510) 9?5-0241.

Sincerely,

Enclosure:

As stated ga~e.

~o>ns, Director Division of Radiation Safety and Safeguards Docket:

50-392 License:

NPF-21 cc w/o enclosure':

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD'27M

Richland, Washington 99352-0968 I

08003(.)

'II505i00077 950505 PDR ADQCK 0500039'7 F

PDR

Washington Public Power Supply System Washington Public Power Supply System ATTN:

G.

E.

C.

Doupe, Esq.

3000 George Washington Way P.O.

Box 968, MD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

M. H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Larry E. Moore, RAC Chairman FEMA Region X

PT Division (PT-TE-REP) 130 228th Street, S.W.

Bothell, Washington 98021-9796

Washington Public Power Supply System bcc w/report:

WNP-2 Resident Inspector RIV file DRSS-RIB Action Item File (Hodges)

A. D. Mcgueen, RIB/DRSS J.

W. Clifford, NRR Project Manager (MS 13 E16) bcc w/o report:

DMB (A045)

L. J. Callan, RA MIS System RITS Coordinator Branch Chief (DRP/E, WCFO)

Senior Projects Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

B. Henderson (PAO, WCfO)

E.

F. Bates, IRC C. A. Hackney, SLO T. Essig, NRR/DOTS (MS 9 H15)

DOCUMENT NAME:

G'iHODGESiDOCUMENTtifEMA-WNP.ADM To receive copy of docu t, indicate in box: "

pywithout enclosures Cop with enclosures "N" ~ No copy RIV:RIB ADMc ueen:nh 05/

r/95 C:RIB BMurr y 05/

95 DD:DRSS AS ano

/95 COR C

D:

SJCollins 05/

/95

Washington Public Power Supply System bcc w/report:

WNP-2 Resident Inspector RIV File DRSS-RIB Action Item File (Hodges)

~

A. D. Mcgueen, RIB/DRSS J.

W. Clifford, NRR Project Manager (MS 13 E16) bcc w/o report:

L. J. Callan, RA MIS System RITS Coordinator Branch Chief (DRP/E, WCFO)

Senior Projects Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

B. Henderson (PAO, WCFO)

E.

F. Bates, IRC C. A. Hackney, SLO T. Essig, NRR/DOTS (MS 9 H15)

DOCUMENT NAME:

G: iHODGESiDOCUMENTttFEMA-WNP.ADM To receive copy of docu t, indicate in box: "

py without enciosures Cop with enclosures "N" No copy RIV:RIB ADMc ueen:nh 05/ i/95 C:RIB BMurr y 05/

95 DD:DRSS AS ano

/

/95 C

L CO Do SJCollins 05/

/95