April 25, 1995 Hr. J.
V. Parrish (Hail Drop 1023)
Vice President Nuclear Operations Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968
Dear Hr. Parrish:
f
SUBJECT:
REUSE OF CHANNEL BOXES FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO.
2 (TAC NO. H91068)
On March 20, 1990, the NRC issued Bulletin (NRCB) 90-02, "Loss of Thermal Margin Caused by Channel Box Bow."
The NRC requested licensees to evaluate reused channel boxes to verify';that current minimum critical power ratio (HCPR) technical'pecification operating and safety limits were met.
By letter dated December 1,
1994, ~the licensee responded to NRCB 90-02 for WNP-2 Cycle ll operations.
The NRC staff has reviewed the licensee's letter and finds that it satisfactorily addresses, the issues discussed in NRCB 90-02 for Cycle 11.
The NRC staff's safety evaluation is provided in the enclosure.
The NRC staff has also determined that the licensee should evaluate future reuse of channel boxes under 10 CFR 50.59.
Following this regulation, prior NRC review and approval is only necessary if the reuse involves an unreviewed safety question or a change to the WNP-2 technical specifications.
This completes NRC staff action on TAC No. H91068.
Please contact me at (301) 415-1352 if you have any questions.
Sincerely,'RIGINAL SIGNED BY M. A. HILLER FOR:
James W. Cl ifford, Seni or Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosures:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION Docket File PUBLIC EAdensam JHannon PDIV-2 Reading WBateman GThomas EPeyton JClifford
- ABBeach, RIV
- KPerkins, RIV/WCFO BJones DOCUMENT NAME:
WNP91068.SER OFC PDIV-2/LA P, "-2/PH NAME E~Pey on DATE 4
95 lifford:ye 4
95 OFFICIAL RECORD COPY 95050f0053 950425 PDR ADOCK 05000397 a
~DR pro(
IRItlHP IIlHHRCIFV
Ob April 25, 1995 Hr. J.
V. Parrish (Hail Drop 1023)
Vice President Nuclear Operations Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968
Dear Hr. Parrish:
SUBJECT:
REUSE OF CHANNEL BOXES FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO.
2 (TAC NO. H91068)
On March 20, 1990, the NRC issued Bulletin (NRCB) 90-02, "Loss of Thermal Margin Caused by Channel Box Bow."
The NRC requested licensees to evaluate reused channel boxes to verify that current minimum critical power ratio (MCPR) technical specification operating and safety limits were met.
By letter dated December 1,
1994, the licensee responded to NRCB 90-02 for WNP-2 Cycle 11 operations.
The NRC staff has reviewed the licensee's letter and finds that it satisfactorily addres'ses the issues discussed in NRCB 90-02 for Cycle 11.
The NRC staff's safety evaluation is provided in the enclosure.
The NRC staff has also determined that the licensee should evaluate future reuse of channel boxes under 10 CFR 50.59.
Following this regulation, prior NRC review and approval is only necessary if the reuse involves an unreviewed safety question or a change to the WNP-2 technical specifications.
This completes NRC staff action on TAC No. H91068.
Please contact me at (301) 415-1352 if you have any questions.
Sincerely, ORIGINAL SIGNED BY M. A. MILLER FOR:
James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosures:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION Docket File PUBLIC EAdensam JHannon PDIV-2 Reading WBateman GThomas EPeyton JClifford OGC, 015818 ACRS (4)
- ABBeach, RIV
- KPerkins, RIV/WCFO BJones DOCUMENT NAME:
WNP91068.SER PDPI-2 PH OFC PDIV-2 LA NAME E~ney on rX1 ifford:ye C
DATE 4+
95 4
-95 OFFICIAL RECORD COPY
~ ~
, I I
Mr. J.
V. Parrish CC:
Mr. J.
H. Swailes WNP-2 Plant General Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Corporate Counsel (Mail Drop 396)
Washington Public Power Supply System 3000 George Washington Way
- Richland, Washington 99352-0968 Mr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympia, Washington 98504-3172 Mr. D. A. Swank (Mail Drop PE20)
WNP-2 Licensing Manager Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Mr. Paul R.
Bemis (Mail Drop PE20)
Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 5 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Mr. R.
C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 69
- Richland, Washington 99352-0968 M. H. Philips, Jr.,
Esq.
Winston 5 Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. D.E. Hershberger, Sr. Engineer Siemens Power Corporation-Nuclear Division (SPC-ND) 2101 Horn Rapids Road P.O.
Box 130
- Richland, Washington 99352-0130