ML17291A721
| ML17291A721 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/10/1995 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A722 | List: |
| References | |
| NUDOCS 9504130167 | |
| Download: ML17291A721 (5) | |
See also: IR 05000122/2003004
Text
v
~6 AE0y
Wp
<<**<<>>
UNIT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
APR
I 0 l995
Docket:
50-397
License:
Washington Public
Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
HD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-05
This refers
to the inspection
conducted
by Hr.
R.
C. Barr,
and the inspectors
identified in this report, of this office on January
22 through
March 4,
1995.
The inspection
included
a review of activities authorized for your Washington
Nuclear Project
2 facility.
At the conclusion of the inspection,
the findings
were discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
It was notable during this inspection that the meeting of your expectations
for supervisor field oversight
by
a maintenance
supervisor
involved with
corrective maintenance
on
a condensate
resin trap prevented
a potentially
serious
event.
In addition, there
were examples of strong questioning
attitudes
in engineering.
These
included
a system engineer trending of the
performance of scram discharge
volume vent
and drain valves
and
an engineer
identifying an electrical
separation
deficiency.
No violations or deviations
are being issued with this report,
the issues
identified in this report indicate,
however, that self-checking,
second
verification, attention to detail,
and corrective action with respect
to plant
operations,
are not consistently functioning at
an acceptable
level.
Your
continued attention to these
areas
is encouraged.
A number of these
issues
will be discussed
in detail
in
NRC Special
Inspection
Report 50-397/95-07.
In accordance
with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
e
'P504TGOih7 9504%0
ADQCK 05000397
6
Washington Public
Power Supply
System
-2-
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosure:
NRC Inspection
Report
50-397/95-05
A. Bill Beach,
Director
Division of Reactor Projects
cc w/enclosure:
Public
Power Supply System,
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
G.
E.
C.
Doupe,
Esq.
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Public
Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R.
Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Washington Public Power Supply
System
Winston
5 Strawn
ATTN:
M. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
APR
I 0 l995
E-Mail report to D. Sul.livan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g wn2tIwn505rp.rcb
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" -" Copy with enclosures "N" -"No copy
RIV:SRI
AC:DRP/E
D:WCFO
D:
RCBarr
DDChamb
ain
KEPerki
a
3/28/95
4/ ') /95
4/
/95
0
C
CO
4/lo/95
Washington Public Power Supply
System
-4-
APP
t 0 )995
E-Mail report to
O. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
0MB (1E01)
bcc distrib.
by RIV:
L. J. Callan
ORSS-FIPB
Branch Chief (ORP/E,
WCFO)
Senior Project Inspector
(ORP/E,
WCFO)
Leah Tremper
(OC/LFOCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g wn2)wn505rp.rcb
To receive copy of document. indicate in box: "C" "- Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV:SRI
AC:DRP/E
D:WCFO
0:
E
RCBarr
DDChamb
ain
KEPerki
a
3/28/95
4/g /95
4/
/95
0
C
L
CO
CO
4/lo/95