Forwards Insp Rept 50-397/95-05 on 950122-0304.No Violations or Deviations Noted
ML17291A721
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/10/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A722 List:
References
NUDOCS 9504130167
Download: ML17291A721 (5)


See also: IR 05000122/2003004

Text

v

~6 AE0y

Wp

<<**<<>>

UNIT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

APR

I 0 l995

Docket:

50-397

License:

NPF-21

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-05

This refers

to the inspection

conducted

by Hr.

R.

C. Barr,

and the inspectors

identified in this report, of this office on January

22 through

March 4,

1995.

The inspection

included

a review of activities authorized for your Washington

Nuclear Project

2 facility.

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

It was notable during this inspection that the meeting of your expectations

for supervisor field oversight

by

a maintenance

supervisor

involved with

corrective maintenance

on

a condensate

resin trap prevented

a potentially

serious

event.

In addition, there

were examples of strong questioning

attitudes

in engineering.

These

included

a system engineer trending of the

performance of scram discharge

volume vent

and drain valves

and

an engineer

identifying an electrical

separation

deficiency.

No violations or deviations

are being issued with this report,

the issues

identified in this report indicate,

however, that self-checking,

second

verification, attention to detail,

and corrective action with respect

to plant

operations,

are not consistently functioning at

an acceptable

level.

Your

continued attention to these

areas

is encouraged.

A number of these

issues

will be discussed

in detail

in

NRC Special

Inspection

Report 50-397/95-07.

In accordance

with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

e

'P504TGOih7 9504%0

PDR

ADQCK 05000397

6

PDR

Washington Public

Power Supply

System

-2-

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosure:

NRC Inspection

Report

50-397/95-05

A. Bill Beach,

Director

Division of Reactor Projects

cc w/enclosure:

Washington

Public

Power Supply System,

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington

Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Washington Public Power Supply

System

Winston

5 Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply

System

APR

I 0 l995

E-Mail report to D. Sul.livan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:g wn2tIwn505rp.rcb

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" -" Copy with enclosures "N" -"No copy

RIV:SRI

AC:DRP/E

D:WCFO

D:

RCBarr

DDChamb

ain

KEPerki

AB

a

3/28/95

4/ ') /95

4/

/95

0

C

CO

4/lo/95

Washington Public Power Supply

System

-4-

APP

t 0 )995

E-Mail report to

O. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

0MB (1E01)

bcc distrib.

by RIV:

L. J. Callan

ORSS-FIPB

Branch Chief (ORP/E,

WCFO)

Senior Project Inspector

(ORP/E,

WCFO)

Leah Tremper

(OC/LFOCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:g wn2)wn505rp.rcb

To receive copy of document. indicate in box: "C" "- Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

RIV:SRI

AC:DRP/E

D:WCFO

0:

E

RCBarr

DDChamb

ain

KEPerki

AB

a

3/28/95

4/g /95

4/

/95

0

C

L

CO

CO

4/lo/95