Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1988036 + (ML17285A138)
- GO2-88-264, Application for Amend to License NPF-21,modifying Tech Spec Table 3.3.7.12-1 Re Radioactive Gas Effluent Monitoring Instrumentation to Allow Operation of Main Condenser off-gas Treatment Sys W/O Redundant Hydrogen Monitor.Fee Paid + (ML17285A140)
- ML17285A141 + (ML17285A141)
- ML17285A142 + (ML17285A142)
- GO2-88-262, Forwards Rev 1 to Insp of Anf Fuel Assemblies 1163 & 1164 After One-Cycle of Irradiation at Washington Nuclear Plant 2 Reactor. Insps Motivated in Part by Util Concerns Re Crud Induced Localized Corrosion.Rept Withheld (Ref 10CFR2.790) + (ML17285A143)
- GO2-88-274, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-24.Corrective Actions:Procedure PPM 1.5.4 Will Be Revised to Include Time Limits for Review & Corrective Action on All out-of-calibr Measuring & Test Equipment + (ML17285A146)
- ML17285A147 + (ML17285A147)
- IR 05000397/1988037 + (ML17285A149)
- 05000397/LER-1988-034, :on 880909,pipe Failure Caused by Introduction of Liquid Nitrogen Into Primary Containment Supply Purge. Inerting Nitrogen Supply Valve & Containment Supply Purge Shut to Terminate Containment Inerting + (ML17285A150)
- 05000397/LER-1988-024, :on 880703,single Primary Containment Monitor Intermittently Exceeded 150 F Temp & Time Limit.Cause Contributed to Leaking Main Steamline Safety Relief Valves & Leaking Tailpipe Vacuum Breaker Valves + (ML17285A151)
- ML17285A154 + (ML17285A154)
- GO2-88-273, Application for Amend to License NPF-21,revising Tech Spec 3/4.3.3, ECCS Actuation..., Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 to Clarify Testing Requirements & Capabilities Not Inherent in Approved Design.Affidavit Encl.Fee Paid + (ML17285A156)
- ML17285A158 + (ML17285A158)
- ML17285A160 + (ML17285A160)
- ML17285A164 + (ML17285A164)
- ML17285A169 + (ML17285A169)
- ML17285A172 + (ML17285A172)
- ML17285A178 + (ML17285A178)
- ML17285A181 + (ML17285A181)
- ML17285A184 + (ML17285A184)
- IR 05000397/1988043 + (ML17285A187)
- GO2-89-004, Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 890407 + (ML17285A189)
- ML17285A190 + (ML17285A190)
- PNO-V-89-005, on 890106,unscheduled Shutdown Initiated for More than 48 H as Result of Condenser Tube Leakage.Tubes Plugged & Baffle,Provided to Prevent Steam Impingement Directly Onto Tube,Repaired.Repairs Completed by 890109 + (ML17285A192)
- ML17285A193 + (ML17285A193)
- ML17285A194 + (ML17285A194)
- GO2-88-275, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF88A Spring,1988 + (ML17285A195)
- ML17285A196 + (ML17285A196)
- ML17285A197 + (ML17285A197)
- ML17285A198 + (ML17285A198)
- ML17285A199 + (ML17285A199)
- ML17285A200 + (ML17285A200)
- ML17285A202 + (ML17285A202)
- ML17285A203 + (ML17285A203)
- ML17285A204 + (ML17285A204)
- ML17285A207 + (ML17285A207)
- ML17285A208 + (ML17285A208)
- IR 05000397/1988044 + (ML17285A210)
- ML17285A211 + (ML17285A211)
- ML17285A214 + (ML17285A214)
- ML17285A215 + (ML17285A215)
- 05000397/LER-1988-038, :on 881219,determined That Reactor Bldg to Suppression Chamber Vacuum Breaker Valve Inoperable.Caused by Procedural Inadequacies.Technicians Allowed to Complete Channel Functional Test + (ML17285A216)
- ML17285A218 + (ML17285A218)
- ML17285A220 + (ML17285A220)
- ML17285A222 + (ML17285A222)
- GO2-89-013, Requests Temporary Waiver of Compliance from Tech Spec Surveillance Requirement 4.8.1.1.2.e.7.b.Request Consistent W/Design of Diesel Generator Trip Bypasses as Described in FSAR + (ML17285A223)
- PNO-V-89-009, on 890130,main Turbine Generator Trip Occurred, Resulting in Reactor Trip.Preliminary Indication That Main bus-bar Insulator for Phase a 500 Kv step-up Transformer Shorted to Ground.Outage Expected to Last Min of 5 Days + (ML17285A226)
- GO2-89-011, Advises That Complete Response to Generic Ltr 88-14 Cannot Be Provided by 890223.Info That Will Be Submitted Listed. Addl Info on Design Verification Review Will Also Be Provided by 890414 + (ML17285A227)
- GO2-89-010, Submits Revised Response to Util Responding to NRC Re Violations Noted in Insp Rept 50-397/88-24.New Date of Full Compliance Is 890217 for Implementing New Procedure on Control of Test Equipment + (ML17285A228)
- GO2-89-014, Responds to NRC Re Violation Noted in Insp Rept 50-397/88-41.Corrective Actions:Applicable Operations & Chemistry Procedures Re Timing for Sampling & Analysis of Drywell for All Venting & Purging Operations Changed + (ML17285A231)
- IR 05000397/1989002 + (ML17285A232)