ML17285A198

From kanterella
Jump to navigation Jump to search
Notification of 890131 Meeting W/Util in Rockville,Md to Discuss Initiation of Programs Re Safety Performance at Facility
ML17285A198
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/17/1989
From: Samworth R
Office of Nuclear Reactor Regulation
To: Knighton G
Office of Nuclear Reactor Regulation
References
NUDOCS 8901200404
Download: ML17285A198 (8)


Text

i~'anuary 17, 1989 Docket No. 50-397 41 MEMORANDUM FOR:

FROM:

SUBJECT:

DATE 8 TIME:

LOCATION:

PURPOSE:

George W. Knighton, Director Project Directorate V

Division of Reactor Projects - III,

. IV, V and Special Projects Robert B. Samworth, Senior Project Manager Project Directorate Y

Division of Reactor Projects - III, IV, V and Special Projects FORTHCOMING MEETING WITH WPPSS January 31, 1989 at 9:00 a.m.

U.S. Nuclear Regulatory Commission 11555 Rockville Pike One White Flint North, Room 10-B-ll Roc kvi 1 le, Mary 1 and 20852 The Washington Public Power Supply System will tell NRC about the Initiation of programs relating to safety performance at WNP-2.

  • PARTICIPANTS:

NRC F. Miraglia D. Crutchfield S.

Varga G.

Ho 1ahan G. Knighton R. Samworth

~Uti 1it Donald W. Mazur A. Lee Oxsen Gary D. Bouchey Gerald C. Sorensen cc:

Sge next page DRSP/PD5 D

PD5 RBSamworth:dr G0 ton 3//f89 1/q/89 original signed by Robert B. Samworth, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federal

~Re ister 28058, 6/28/78.

gppi2004 5000397 qoii7 PDR ADOCl 0

pDC J

P pot

'l

~

I I

f'

~

Y ft

('t I

I H

t 4

~

II dl fl g R

I I

II J

ll p

~

I' R

V f 1

I' p

II t

r

diag IlE424/

yCI

> '%P I

0*

Ie p

e p

Yp ce 16+*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 17, 1989 Docket No.: 50-397 MEMORANDUM FOR:

George W. Knighton, Director Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects FROM:

SUBJECT:

DATE Imi TIME:

LOCATION:

PURPOSE:

Robert B. Samworth, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, Y and Special Projects FORTHCOMING MEETING WITH WPPSS January 31, 1989 at 9:00 a.m.

U.S. Nuclear Regulatory Commission 11555 Rockville Pike One White Flint North, Room 10-8-11 Roc kvi 1 1 e, flary 1 and 20852 The Washington Public Power Supply System will tell NRC about the Initiation of programs relating to safety performance at WNP-2.

  • PARTIC IPANTS:

NRC F. Miraglia D. Crutchfield S.

Varga G. Holahan G. Knighton R. Samworth

~Uti 1 it Donald W. Mazur A. Lee Oxsen Gary D. Bouchey Gerald C. Sorensen cc:

See next page

~>/kvP Robert B.

Samwor th, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federa1

~Re iater 28058, 6/28/78.

I f

t

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S. Reynolds, Esq.

Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.

20005-3502 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023

Richland, WA 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box MD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.

Box 69 Richland, Washington 99352

v C

t I'

DISTRIBUTION Docket File NRC 8 Local PDRs~

PD5 Reading T. Hurley/J. Sniezek D. Crutchfield GHolahan HVirgilio RBSamworth W. Lanning OGC E. Jordan B. Grimes Receptionist (Building where meeting is being held)

NRC Participants ACRS (10)

GPA/PA V. Wilson L. Thomas H. Johnson G.

Cook, Region V

JLee

~

2t,