Text
I DEC 30 1988 Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington',99352 Attention:
Mr. G.
C.
Sorensen'Manager of Regulatory Programs J
Gentlemen:
Subject:
Management 5eeting This will confirm Mr. L.Oxsen's, telephone discussion with Mr. C.'aldwell of this office on December 21',
1988 concerning a management meeting to be held between NRC and Supply System representatives in the Walkley Room at the Washington Public Power Supply System's headquarters at 8:00 a.m.
on January 5, 1989.'nclosure 1 lists the agenda items to be discussed during this meeting.
tift Also included is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.
Sincerely, D. F. Kirsch, Director Division of Reactor Safety and Projects
Enclosures:
Meeting Agenda Copy of NRC Meeting Notice cc:
See next page S90iii0ii7 Sai230 PDR ADOCK 05000397 j
>'l
'v Uv v~,'lrv I
~
~
vv ~ ~a h
~
CC:
Mr. Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, DC 20036 Mr. G.
E.
- Doupe, Esq.
Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 99504 Dr. G.
D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD280
- Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968, MD 927M
- Richland, Washington 99352 E
R Vell P
o on
~Z rman 12/
/88 12/W/88 P 12+,o/88 AChaffee 12'88 DKirsch 12/
/88 EQU ST COPY EST COPY Eg ST COPY EST COPY g
VEST COPY YES /
NO YES /
NO YES /
NO S /
NO E
/
NO ND TO PDR YES /
NO
~
lk
~
s I
1 E
I IF i
r II F I I
)"
1C I
'I F
8
~
V l
gag REO~
~
~0
~ A.
IC O
gO
+>>*<<+
t UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK. CALIFORNIA94595 DEC Bn 19<8 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of licensee:
Washington Public Power Supply System Name of Facility:
WNP-2 Docket Number:
Date and Time of Meeting:
Location of Meeting:
NRC Attendees:
Licensee:
Attendees Washington State Energy Facility Site Evaluation Council:
50-397 January 5, 1989,.8:00 a.m.
Walkley (Board)
Room, Supply System Headquarters, Richland, Washington J.
B. Martin, Regional Administrator G.
W. Knighton, Director, Project Directorate V
A. E. Chaffee, Deputy Director, Division of Reactor Safety
~~ and Projects G.
P.
Yuhas, Chief, Radiation Safety Branch P.
H. Johnson, Chief, Reactor Projects Section 3
J. L. Crews, Senior Reactor Engineer R.
B. Samworth, Project Manager C. J. Bosted, Senior Resident Inspector, WNP-2 R.
C. Sorensen, Resident Inspector, WNP-2 D.
W. Mazur, Managing Director J.
W. Shannon, Deputy Managing Director A. L. Oxsen, Assistant Managing Director - Operations G.
D. Bouchey, Director, Licensing and Assurance G.
C. Sorensen,
- Manager, Regulatory Programs C.
H. McGilton, Manager, Operational Assurance Programs L. J. Garvin, Manager, Programs and Audits C.
M. Powers, Plant Manager L. T. Harrold, Manager, Generation Engineering J.
W. Baker, Assistant Plant Manager S. L. McKay, Operations Manager J.
D. Harmon, Maintenance Manager G. K. Dykeman,
- Manager, WNP-I Engineering R. L. Koenigs, Technical Manager C. Eschels, Chairman W. Fitch, Executive Secretary NOTE:
Attendance at this meeting by NRC personnel other than those listed above should be made known by December 30, 1988 via telephone'call to P. Johnson, FTS 463-3745.
gp V
~
cc (w/copy of licensee letty.r;.:ajd=agenda').';.-,
NRC Participants Listed Above-.
B. Faulkenberry RV:,.= =-;.<<..-.-:;r '~,. =
~
A -.,;=
U ~ Kllschy R
.R. Scarano, RV
., ~...:
R. Zimmerman, RY
,S.:Richards, RV
'C. Caldwell, RY
,=.G.
- Cook, RV L."Chandler, OGC
- Johnson, EDO --,.:.,:
j
~
II ~ '
~ r I r
& ~
~ >
V Pk r> >> If r"
>'<<lI II 'V
~ V
~ ~
I
~ 4
~
~
<<.'.." n s c'".".
V ~
'4 I
V
~
Ild
> ~
U.
G.
C.
'LI ~
~ i ~
2(,"Cn<<B'j<<v" reC'~<<"
Sor n
i3 ~
I"c n><<"."Er <<
i" c h
'<<.Qn<<<<
I'ia
<<a> Q e r ~
U i a <<.i i y +!'( <<,
.'""t
<<o<< "i
>>'~~ '->c~
>4
=-'.-elEnclosure 1
r s I
MANAGEMENT MEETING WASHINGTON PUBLIC POWER SUPPLY SYSTEM January 5, 1989 AGENDA 1.
Opening Remarks, Purpose of Conference J.
B. Martin, Regional Administrator, and D.
W. Mazur, Supply System Managing Director 2.
Presentations by the Supply System Overall Plant Performance and Operating Events Engineering Improvement Program and Actions in Response to SSFI Findings Initiatives and Enhancements in gA and Root Cause Initiatives and Enhancements in Operations Initiatives and Enhancements in Maintenance Health Physics Related Problems in 1988 Other SALP Issues Conclusions 3.
Issues of Current.
NRC Interest Technical Specifications Interpretations Organizational Responsiveness to Problems and Issues Identified by Safety Oversight Groups Radiological Controls Issues Emergency Preparedness Issues Long Term Resolution of Viton Seats for Containment Supply/Exhaust and Vacuum Breaker Valves Engineering Efforts for 1989 Refueling Outage 4.
Other topics of interest 5.
Closing remarks