ML17285A211
| ML17285A211 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/13/1989 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17285A212 | List: |
| References | |
| NUDOCS 8901270340 | |
| Download: ML17285A211 (5) | |
See also: IR 05000397/1988040
Text
AC CKLERATED
D1FTKBU'HON
DEMON STRATlON
SYF? EM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR.8901270340
DOC DATE. 89/Ol/13
NOTARIZED. NO
DOCKET
g
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P:
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
R
SUBJECT:
Forwards Insp Rept 50-397/88-40
on 881114-1214
& notice of
violation.
I
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
D
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi lation Response
NOTES
RECIPIENT
ID CODE/NAME
PD5
G
ERNAL:
L'PDR
INTERNAL: ACRS
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB 11
NRR/DOEA DIR ll
"NRR/DREP/RPB
10
NRR/PMAS/ILRB12
Og Ll-
ERMAN)J
FWE
02
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
'1
1,
1
2
'
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
NRC PDR
RESL MARTIN,D
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
h
R
I
D
S
h
NOTE 'IO ALL "RIDS"
RECIPIEtGS'LEASE
HELP US K) REDUCE WASTE.'DNI'ACT 'THE DOCXMERZ KRAALDESK,
ROOM Pl-37
(EXT. 20079)
TO ZZZMINATB YOUR NAME PROM DIPHMK7ZIGN
LISTS FOR DOCUMENIS YOU DON'T NEZD!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
JPh(
~ 3
Docket No.
50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention: 'r. G. C. Sorensen
'anager of Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
C. J.
Bosted
and
R.
C.
Sorensen
of this office on November
14 - December
14 and by Mr. P.
H. Johnson
and me'n
November
28 - December
2,
1988 of activities authorized
by
NRC
Operating License
No. NPF-21,
and to the discussions
of findings held with
Mr. L. Oxsen
on December 2,
1988 and with Mr. C.
Powers
and other members of
the Supply System staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted
of sele'ctive
examina-
tions of procedures
and representative
records,
interviews with personnel
and
observations
'by the inspectors.
As discussed
in the enclosed report,
we are concerned
about your management's
response
to, the determination
on November 21,
1988, that calibration of the
degraded
voltage protection feature
on vital bus
SM-7 was delinquent.
This
occurrence
indicated
an insufficient level of'ensitivity to fulfillingthe
requirements
of the Technical Specifications
when required safety equipment
must
be declared
This issue
was discussed
with you during our
January
5,
1989 management
meeting.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the provi-
sions of 10 CFR 2.201
as stated
in Appendix A, Notice. of Violation.
In
accordance
with 10 CFR 2.790(a),
a copy of this letter, the enclosure,
and
your response will be placed in the
NRC Public Document
Room.
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork
Reductior, Act of 1980,
PL 96-511.,
8901210='40
-'POi 1"-.:
PEiR
AGGCK Ob000i
9
Cl
JAt,'
3,gag '
Sincerely,
I
Acl
Z/'. fYA
Reactor Projects
Branch
Enclosures:
1;
Appendix A, Notice of Violation
2.'nspection
Report No. 50-397/88-40
cc w/enclosures
1 and 2:
A. L. Oxsen,
WPPSS Director, Operations
G.
D. Bouchey,
WPPSS Director, Assurance
5 Licensing
C.
M. Powers,
WNP-2 Plant Manager
A. G. Hosier,
WNP-2 Licensing Manager
G. E. Doupe,
Esq.
N. S. Reynolds,
Debeyois,
Cook, Purcell
5 Reynolds
State of Washington
bcc w/copy of enclosures
1 and 2:
Docket File
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Yaartin
A. Johnson
T. Foley,
bcc w/enclosure
1 only:
M. Smith
LFMB
j
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
R
$'ic
en
4
C
at
1/ Ii/89
1/
< I /89
/
Plan
+A
i
n
MZ
an
1/ ll/89
~-1/I i/ 9 ) )
1/l3/
'Ye,(ac.~
UES
C
PY
EST
C
PY
ES /
NO
ES /
NO
C
PY
REQUES
YES
NO
YES /
NO
EST
C
PY
S /
NO
Q TO
ES 3/
NO