ML17285A220

From kanterella
Jump to navigation Jump to search
Requests Addl Emergency Notification Sys Phone in Control Room Area So That Installation of New Conduit & Cabling Can Be Initiated
ML17285A220
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/29/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Garcia E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17285A221 List:
References
NUDOCS 8902020107
Download: ML17285A220 (3)


Text

Ar CELEWTED D~WKBU'noN DKMONSWXTION SYrrEM REGULAT INFORMATION DISTRIBUTIO 'YSTEM (RIDS)

ACCESSION NBR:8902020107 DOC.DATE: 88/10/29 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS. Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public. Power Supply System RECIP.NAM" RECIPIENT AFFILiATION GARCIA,E. Region 5, Ofc of the Director

SUBJECT:

Reauests addi phone in control room area & needs to confirm that conduit & cabling in place prior to installation.

DISTRIBUTION CODE: IEOlD COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice

/ ENCL + SIZE:

of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 2 2 AEOD 1 1 AEOD/DEIIB 1 1 DEDRO 1 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 31 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE BERMAN,J 1 1 OGC/HDS2 1 1 FI E - 02 1" 1 RGN5 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h

D NOPE TO ALL '%IrS<<REerPZmrS.

S PIZASE HELP US TO RECCE KQ3TB! CGHZACT THE DOCUMEÃZ CKÃZROL DESK RXM Pl-37 (EXT. 20079) TO ELXMZNAXE KÃHt MME FKH DIBTRZBVZICN LIST8 BDR DOCUMENXS YOU DCH~T NEEDj TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

A WASHINGTON PUBLIC POWER SUP@'g, $ $ EM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 AIO, October 29, 1988 Mr. Emilio Garcia Nuclear Regulatory Commision Region 5 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Garcia:

Subject:

ADDITIONAL ENS TELEPHONE LOCATION AT WNP-2 The Supply System's Operations group has determined tHat an additional ENS telephone is required in the control room area of WNP-2. With this letter we are formally requesting you to initiate this addition.

The NRC has recognized the need for a 2nd ENS telephone in the control room area of other nuclear plants as evidenced by their "Emergency Notification System Sample Configuration" diagram (attached). There is presently one telephone located near the Shift Supervisors desk.

The Supply System owns and controls all telephone cabling within WNP-2.

The new location will require us to design a new conduit route and install telephone cable between the new ENS location and the main ENS control package (NR-6). The NRC is r equested to provide the telephone instrument, required control package equipment and direction to ATTCOM.

The Supply System will provide the telephone cable, route to the new ENS location and a technician to accompany and assist ATTCOM in the setup of the circuit.

Please confirm your concurrence of the new ENS addition at the earliest time so we can initiate the installation of the new conduit and cabling.

Do not schedule ATTCOM's installation date until we confirm with you that the conduit and cabling are in place.

8<yp2020i07 88i0209~~7 pop @DOCK 0500 P

Feel free to contact Steve Heath of our'taff at (509) 377-8208 for assistance in this matter.

Sincerely, G. C.>Sorensen flanager Regulatory Programs WGD/bjn Attachme'nts cc: Stuart Cohen, NRC w/attachment D. C. Williams, BPA w/attachment Document Control Desk, NRC w/attachment R. B. Samworth, NRC w/attacHment T. B. Kellam, NRC w/attachment