ML17285A220
| ML17285A220 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/29/1988 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Garcia E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17285A221 | List: |
| References | |
| NUDOCS 8902020107 | |
| Download: ML17285A220 (3) | |
Text
ArCELEWTED D~WKBU'noN DKMONSWXTION SYrrEM REGULAT INFORMATION DISTRIBUTIO
'YSTEM (RIDS)
ACCESSION NBR:8902020107 DOC.DATE: 88/10/29 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS. Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public. Power Supply System RECIP.NAM" RECIPIENT AFFILiATION GARCIA,E.
Region 5, Ofc of the Director
SUBJECT:
Reauests addi phone in control room area
& needs to confirm that conduit
& cabling in place prior to installation.
DISTRIBUTION CODE:
IEOlD COPIES RECEIVED:LTR /
ENCL +
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 31 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE BERMAN,J FI E
02 COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1"
1 RECIPIENT ID CODE/NAME SAMWORTH,R AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN5 FILE 01 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 EXTERNAL: LPDR NSIC 1
1 1
1 NRC PDR 1
1 h
NOPE TO ALL '%IrS<<REerPZmrS.
PIZASE HELP US TO RECCE KQ3TB!
CGHZACT THE DOCUMEÃZ CKÃZROL DESK RXM Pl-37 (EXT. 20079)
TO ELXMZNAXE KÃHt MME FKH DIBTRZBVZICN LIST8 BDR DOCUMENXS YOU DCH~T NEEDj D
S TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 25
A WASHINGTON PUBLIC POWER SUP@'g,
$$EM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352
- AIO, October 29, 1988 Mr. Emilio Garcia Nuclear Regulatory Commision Region 5
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596
Dear Mr. Garcia:
Subject:
ADDITIONAL ENS TELEPHONE LOCATION AT WNP-2 The Supply System's Operations group has determined tHat an additional ENS telephone is required in the control room area of WNP-2.
With this letter we are formally requesting you to initiate this addition.
The NRC has recognized the need for a 2nd ENS telephone in the control room area of other nuclear plants as evidenced by their "Emergency Notification System Sample Configuration" diagram (attached).
There is presently one telephone located near the Shift Supervisors desk.
The Supply System owns and controls all telephone cabling within WNP-2.
The new location will require us to design a
new conduit route and install telephone cable between the new ENS location and the main ENS control package (NR-6).
The NRC is r equested to provide the telephone instrument, required control package equipment and direction to ATTCOM.
The Supply System will provide the telephone
- cable, route to the new ENS location and a technician to accompany and assist ATTCOM in the setup of the circuit.
Please confirm your concurrence of the new ENS addition at the earliest time so we can initiate the installation of the new conduit and cabling.
Do not schedule ATTCOM's installation date until we confirm with you that the conduit and cabling are in place.
8<yp2020i07 88i0209~~7 pop
@DOCK 0500 P
Feel free to contact Steve Heath of our'taff at (509) 377-8208 for assistance in this matter.
Sincerely, G. C.>Sorensen flanager Regulatory Programs WGD/bjn Attachme'nts cc: Stuart
- Cohen, NRC w/attachment D. C. Williams, BPA w/attachment Document Control
- Desk, NRC w/attachment R.
B. Samworth, NRC w/attacHment T. B. Kellam, NRC w/attachment